Meter Swap l `�d�lSJ �1����
���
Request Number: 6666
Public Works Division
Service Request
ProblemAddress: 951 Pandora Dr Requested By: Yoon Kyung Kim
Department: WATER A�ddress: No address provided
Problemllssue: INSTAIL MEIER Phone Number: 612-281-2514
Scheduled Date: 2013-0&20 Scheduled Time: 10:00:00
ACT10N NEEDED: 2013 AMR
Created by: W endy Hiatt Date Created: 2013-08-09
ACTION TAKEN: � v IV
Old meter#20682250 Old reading:483180 New meter#44921396 ERT#35191166
Status: Completed Resident Contacted �
Date Completed: 2013-0&20 Completed by: Pete Gunderson
Nours
�
�7�
Request Number: 6666
Public Works Division
Service Request
Problem Address: 951 Pandora Dr Requested By: Yoon Kyung Kim
Department: WATER Address: No address provided
Problemllssue: INSTALL METER(WATER) Phone Number. 612-281-2514
Scheduled Date: 2013-0&20 Scheduled Time: ,$a10�:00
QS �
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-08-09
ACTION TAKEN:
.............�....-.i../..�"��'�:�............:�.........................�._�.�...�.........��.._�......................._. . . .
................................................................................._..................__.._..._
...............�._�-:��_�:�...........................................�.��......_�...�.............:...........:...............................................:.....__......_................_._........._..._................._.............._
u� ��-��:� y�I`�� ���fo
.............................................................................................................................................................................................................................................................................._............_.........................................................._._............................_._....._........__......_
�/�J ���r�- �
................................................................................................................................................................................................................................................................................................................................................_...._............_._:............................._..............
��" � � � �� � ���
........................................................................................................................................................................................................................................................................................................................................................................................................................
Status: In Progress Resident Corrtacted ❑
Date Completed: Completed by:
I J'�
�� �
,
.
� Hiatt, Wendy
Subject: Yoon Kyung Kim, 612-281-2514, AMR @ 10:00 AM
Location: 951 Pandora Dr NE
Start: Tue 8/20/2013 10:00 AM
End: Tue 8/20/2013 10:30 AM
Show Time As: Tentative
Recurrence: (none)
Meeting Status: Not yet responded
Organizer: White, Karen
Required Attendees: Hiatt, Wendy
i
- City of Fridley
Water Department
__.
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
��We hereby authorize the City of Fridiey and/or its
employees to do what is necessary to replace the water meter. 1 understand that the property owner
is liable for the water line from the main to the premise and all interior plumbing. (Per City tflde
402.06� I also hold the City of Fridley andJits employees harmless for any damages that may occur
while doing this operation. This to include,but not limited to;valves,piping,walls,floors or the curb
stop box and service line. I understand i am also required to obtain a permit prior to any work,if
necessary.
Final meter reading(old meter) ��� "�
Name•
Address: ��� �����
Phone Number: Date• �`� "" l� ,
Signature• -
�
Witness Signatu e:
FRIDLEY CITY CODE
CHAPTER 4Q2.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988, 1144, 1156,1191)
402.05. PERMIT FEE
Prior to constructing or repair of any water or sewer line co�necting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall he required to obtain a permit for such
connection,and shail pay a permit fee as provided in Chapter 11 of this Cade. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting tine unti!an
inspection has been made and such cannection and the wo�k incident thereto has been approved by the City as a
proper and suitable connedion.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
(ine or a water service or sewer tead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shali be liable for all repairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
palicy. !t shal!be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of
• the sewer service line from the premises to the main including debris clearing ar root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the(and or property. (Ref 638,1156,1191)