Loading...
Meter Swap ��.�� ��� �;.� l�� Re uest Number: 6376 q Public Works Division Service Request Problem A�ddress: 572 IPoce Creek Terrace Requested By: Joan Lessner Department: WA1�R Addresa: No address provided Problemllssue: INSTALL NIEIER Phone Nurrd�er: 763-+5271-2474 Scheduted Date: 2013-07-17 Scheduled Time: 08:00:00 AC710N NEEDED: 2013 AMR Prgm Created by: Wendy Hiatt Date Created: 2013-07-10 ACTION TAKEN: � Old meter#36998266 Old reading 1774 20 New meter#44248351 New reading: 0 ERT#35172553 Status: Completed Resident Corrtacted O Date Cornpleted: 2013-07-16 Completed by: Pete Gunderson Hours � ��3� � Request Number: 6376 Public Works Division Service Request Problem Address: 572 Rice Creek Terrace Requested By: Joan Lessner Department: WATER Address: No address provided Problemllssue: INSTALL METER(WATER) Phone Number: 763-+5271-2474 Scheduled Date: 2013-07-16 � Scheduled Time: 09:00:00 � , ACTION NEEDED: 2013 AMR Prgm Created by: Wendy Hiatt Date Created: 2013-07-10 ACTION TAKEN: ...............:............................................................................................................................................................................................................ , �� .....��....._`'................................_..y�_��_�_....�a�......_�o.....................:..................................__.............._�......:................_........._....._................. ..........................................�� .... .. k'���s� � �._�_�7.,�........�.................................................._..........:........:.....................__..............................................:.___........._ — �.......... .. .... , _.....��............................................................................................................................................... ��� - �!_'-�.�_`...f.......�_�._5.._�...........................................:...._....:..............................:.............:................._:....._.........:..._...__.........................._ .......... �............................................................................................. .... IU�J'2�-�,�� - � _................................................................................................................................................................................................................ ...........................�...�....._�-::._-.........:35!_:�.._a.._5_��....:....:................:._.................:......:...........................:.................::........:..:.......:...............:............_.................................................:..... Status: In Progress Resident Contacted ❑ Date Completed: Completed by: ��'a�� `l-� I (� �� City of Fridley . Water Department ` 6431 University Avenue NE Fridley, MN 55432 (763)572-3566 I/we hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and atl interior plumbing. (Per City code 402.06) t also.hotd the City of Fridley and/its employees harmless for any damages that may occur while doing this operation. This ta include,but nat limited to;valves,piping,walls,floars or the curb stop box and service line. I understand I am also required to obtain a permit prior to any work,if necessary. Final meter readin (old meter) ��� � ��/ v g Name: Address: � /� "��`-^`'����� Phone Number: aate: 1 v ` ---� � � Signature: Witness Signature: . . � FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER ADIVIINISTRQTION (Ref Ord No 113,464,565,566,629,638, 662,922,988,1144,1156,1191� 40Z.05. PERMIT FEE Prior to constructing or repair uf any water or sewer line connecting the existing municipal system and any house or 6uilding for which the application is made,the owner or contractor shall be required to obtain a permitfor such �o��nes�iQn,an�shala�aT�-Permit fPP a�nrovided in Chapter 11 of this Code. After such cannection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any conne ing�in ��� inspection has heen made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. 402A6. REPAIRS AND MAINTENANCE TO C�NNECTION After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner, or the occupant or user of such premises shall ae liable for all repairs required to any water line and sewer lines necessary for cnnnection of the premises from the main to the premises. If the property owner requests maintenance service or repairs be performed by the City,the property owner shall he charged for the costs of the maintenance and/ar repairs, including ar+y necessary street repairs,at a rate set annually by an admini�rative po(icy. It sha�l be the responsibility of the applicant,owner,occupant ar user to perform standatd mafntenance of . the sewer service line from the premises to the main including debris clearing or root cutting and to rnaintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)