Loading...
Meter Swap ���� �� �s '`� �� �� Request Number: 6596 Public Works Division Service Request Problem Address: 751 Rice Creek Terrace Requested By: Darlene Halwrsen Department: WATER Address: No address provided Problemllssue: INSTAU.METER Phone Number: 571-6899 Scheduled Date: 2013-08-09 Scheduled Time: 02:00:00 ACT10N NEEDED: 2013 AMR Created by: Wendy i-Gatt Date Created: 013-0&02 ACTION TAKEN: Old meter#93107420 Old reading:216 0 New meter#44248391 ERT#35191367 Status: Corr�pleted Resident Contacted ❑ Date Completed: 2013-0&09 Completed by: Keven Becldin Hours . � ��J ` Request Number: 6596 Public Works Division Service Request Problem Address: 751 Rice Creek Terrace Requested By: Darlene HaMorsen � Department: WAl'ER �dress: No address provided Problemllssue: 1NSTALL METER(WATER) Phone Number: 571-6899 Scheduled Dat : 2013-08-09 Scheduled Time: 02:00:00 �i`c� �-`clD ACTION NEEDED: 2013 AMR Created by: . Wendy Hiatt Date Created: 2013-08-02 ACTION TAKEN: ...................................................................................................................................................................................................:.................................................................................................................................................:............................................................... �_Id......_�_..e..�.-�c-....:..:.. .........:...........................�.........�.�...........:.�...�...�..�._�._v...........................................:........................................................._._...__....._._:..._...................................._. � �._�I..............:r�:d�..�......................................:..._�..::�......�,�.....:.�..._�.._�...�.............................:....................:..........................:..........................._.............._......____.............._._......._ ��........_��.-�..............:.............................:.'.'��.::g.:3_�:.!..........:.....................:.....:............................._........................: _. ............ ...................:......................._..............._................... i�l e._�......Y��...�_...�`...�.-.........................................:..................................................�..............................................................:...............................................................__.._....�...................................................._...........:..........:.... _.._��=� �..._..._:_..._......................................:3.,Sk�.....1...�._��'.............................................................................................................................._............._.�_:...._.___............................... Status: In Progress Resident Contacted � Date Completed: Completed by: ` �� �— �� _ City af Fridley Water Department 6431 University Avenue NE � F�idley,MN 55432 (lfi3)572-3566 `�WQ hereby authorize the City of Fridfey and/or its oWner employees to do what is necesaary to replace the water meter. 1 understand that the property is liable for the water fine from the main to the premees harmless fo rany dam�ages that maY or.ceur 402.06) I also hotd the City of�ridley and/its employ � 1� wa��s�flo��'s ar the curb whi{e doing this operation. This to include,but not lirnited to;vafves,p'p b, stsp box and service line. i understand I am also required to o6tain a permit prior to any work,if necessary. r � � ��� Final meter readinE(vl�mete )_ Name: Address: � Phone Number: Date• ���/ ignature• ,.... Witness Signature: � � FRfDLEY C1TY CUQE CHAPTER 4Q2.WATER,STdRM WATER�AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,A64,565,566,629,638,662,922,988,1144, 1156,1191} f _ ' 402.45.PERMIT FEE Pnor to constructing or repair of any water ar sewer line connecting th�ei`�e�emu eapa abt en a permit for such or building for which the apptication is made,the owner or contractor s � connection,and shall pay a permit fee as provibe not fed.tit shall be unfawfui to cover any cannelcti g lineeuntil an made,the 1Nater and Sewer Department shall inspection has been made and such cannection and the work inddent thereto has been approved by the City as a proper and suitable connection. 402.p6.REPAIRS�►ND MAtNTENANCE TO CONNECTION After the initiai cannection has been made to the water service curb stop'ne forrconnection'the appl cant owner, iine or a water service ar sewer lead has been extended to the prQperty or the occupant or user of such premises shall be liabie for afl repairs required to any wate��ner reduests r��nes necessary for connection of the premises from the main to the p�ree�S ow�ner shafl be har ed for t e costs of the g maintenance sesvice or repairs be perfarmed by the City,the p P rtY �n administrative maintenance and[or repairs, incl�d'��ng h�an�licant owneet a cupant or ser to perfo m sta dard maintenance af paticy. ft shail be the responsib�l�y PP • the sewer sen►ice line from the premises to the main in�e dn�de�II ensure t at t ema ns above the finished he water service curb stop box for operabi4ity and at such g grade of the land or property. (Ref 638,1156,1191)