Meter Swap ��-��
��
1��..�f°1!��`�
Request Number: 6653
Public Works Division
Service Request
Problem Address: 810 Rice Creek Terrace Requested By: Joe Capra
Department: WATER Address: No add�ess provided
Problemllssue: INSTALL METER Phone Nurrd�er: 571-2638
Scheduled Date: 2013-08-08 Scheduled Time: 02:30:00
ACTtON NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-08-08
ACTION TAKEN: �
Old meter#94025257 Old readin 259 60 New meter#44248392 ERT#35191341
Status: Completed Resident Contacted ❑
Date Completed: 2013-0&08 Completed by: Kev�en Becic�n
Hours
��3
Request Number: 6653
Public Works Division
Service Request
Problem A�ddress: 810 Rice C�eek Terrace Requested By: Joe Capra
Department: WATER Address: No address provided
Problem/Issue: INSTALL ME7ER(WATER) Phone Number: 571-2638
Scheduled Da . 2013-0&08 �l Scheduled Time: 02:30:00
7'"\ �
ACTION NEEDED: 2013 AMR
Created by: Wendy Hiatt Date Created: 2013-0&08
ACTION TAKEN:
.......................................................................................................................................:................................................................................................................................................................................................................_........._.._....�.......�.... _
���v ` .,;
O.k�.........._�''�:e..-�.-�.r:......._..�............_�._�'�._b._....�.�.......-�.d���
. .._ . ....... . .. �.... ........................... ..............................................................................................................._.............._.............._......._...-
�� �..5-�S �6� ...._
6�...................._�_.�.d:........�......................................................................_.........._:............................................................................................................................................................................._..........._.._._......_._......
�e w �l�2-�er-_.-� � �a-�. � �j��--
n�k. r��.�,� �
................................................................................................................. .... ..
..................................................................................................................................................................................................................................._.._._.._....._
_......._��-�"...................�.....................:........................_�:.��:..�:::�.:.....j._3...._w_�.......................,:.................................:..1..............................................................:....................._.._.._..._......_:....:.........
Status: In Progress Resident Contacted �
Date Completed: � � Completed by:
� ��
��
j
- City of Fridley
Water Department
6431 University Avenue NE
Fridfey,MN 55432
(763)572-3566
f/we hereby authorize the City of Fridley and/ar its
employees to do what is necessary to repiace the water meter. 1 understand that the property awner
is liable for the water line from the main to the premise and af{interior pfumhing. (Pec City cade
402.06) 1 also hold the City af Fridley and/its empfayees harmfess for any damages that may oc.cur
while doing this operation. 7his to include,but not limited to;valves,piping,wa8s,floars or the curb
stop box and service line. I understand I am also required to obtain a permit p�ior to any work,if
necessary.
. �S��s�6�-
final meter seading(u!d meter)_
Name� Address•
Phone Number:
Date: �V� j�
,
Signature:
r
Witness Signature
FRIDLEY ClTY CODE
CHAPTER 402.WATER,STORM WATER,AND SANtTARY SEWER
ADM{NISTRATION
(Ref Ord No 113,464,565,566,629,538,6G2,922,988,11�4, 1156,1191)
402.05. PERMIT FEE
Frior to constructing or repair of any water or sewer{ine connecting the existing municipal system and any hause �
or building for which the application is made,the owner or contractor shall be required to abtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the V�later and Sewer Department shatl be notified. lt shatf be unlawful to cover any connecting iine untif an
inspection has been made ar+d such cor►nection and the work incident thereto has been app�oved by the City as a
propec and suitable conr+ection.
402.d6.REPAt[�S AND MAtNTENANCE TO CONNECI'ION
After the initial connection has been made to the water service curb stap bnx or the sewer lead at t 4�n{�Wner,
Iine or a water service or sewer lead has been extended to the property line for connection,the app'
or the occupant or user of such premises shafi be fiabte far atl�epairs required to any water 4ine and sewer tines
neCessary for connection of the premises from the main to the premises. if the property owner requests
maintenance service or repairs be perfarmed by the City,the praperty owner shall be charged for the cnsts of the
maintenance andJor repairs, incfuding any necessary street repairs,at a rate set annuatly by an administratNe
poticy. it shati be the responsibility of the applicant,awner,occupant or user ta perform standard maintenance of
- the sewer service fine from the premises to the main in�luding de6ris clearing or root cutting and to maintain the
water service curb stop bax for operabi4ity and at such height as wili ensure that it remains above the finished
grade nf the land or property. (Ref 638,1156,1191j