Loading...
Meter Swap i ��a-��5,��� �y o 0�3-1�1 - ���� � Request Number: 8156 � ; Public Works oivision Savice Request � Problem Addrass: 511 Rice Creek Blvd IVE Roquested By: Usa Scxanson Departmer�t: WATER Address: No address provitlsd Probleml{�sue: INSTALLAMR METER Phone Nurnber. 783-561-6516 i � Scheduted Date: 201407-Q3 Schedul�d Time: 08:�0:00 ACTION NEEDEp: InstaN AMR � Creatad by: Julie Morak Date Creatad: 201406-20 ACT10N TAKEN: �d rneter#10068336 Otd read{ng�00 New me�sr#44922029 ERT#35171623 8tatus: Completed ResicNnt Contacted O Date Completed: 2014-07-03 Completed by: Ryan Johrw�on . Nours � 3 r Request Number: 8156 Public Works Division Service Request Probiem Address: 511 Rice Creek BMd NE Requested By: Lisa Sorenson Department: WA7ER A�ddress: No address provided Problemllssue: INSTALLAMR METER Phone Number: 763-561-6516 Scheduled Date: 201407-03 Scheduled Time: 08:30:00 � � � � � ACTION NEEDED: InstallAMR Created by: Julie Horak Date Created: 201406-20 ACTION TAKEN: _....................................................................................................................._...........................,...................................................:......_......................................................_......................._...................._........................_......__.._._...................................._....... ....�.��.....�-�.-�:..�....�...........�_..�......b........�........3......�.c�................................................................................._.............................._.............................�._.............:................_......_.:....... .bLD......._R:._�-.:f.4��:.1.��..'............��..g......r.._�....r..J....._�................................................................................._.......:..:..................................................................:............................._ w�� ��� Zo 2 � _���............................................................_�...............-..1..............................................................................................................................................................................._..........................................._..............._......_._........_............ _��..c..:..�........Q:,-�.-�::. .�N�.._-......... .... ............................................................................. .. . ............................................................................................_. . .....�..�.�............3...�..�..:�...._lc�_Z�...................................................................................................................................................._...................:....._. _. Status: In Progress Resident Contacted ❑ Date Completed: C mplet y: ., �j� � � � k - City of Fridley �-� Water Department --- - 6431 University Avenue NE Fridley,MN 55432 (763)57Z-3566 ��We hereby authorize the City of Fridley andJor its employees to do what is necessary to replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. (Per City code 4Q2.06j 1 aiso hald the City of Fridley and/its employees harmless for any damages that may occur while doing this operation. This to include,hut not limited to;valves,piping,walis,floors or the curb stop box and service tine. 1 understand 1 am also required to obtain a permit prior to any work,if necessary. �� �OQ Final meter reading(old meter) Name• Address: ���-' �-I �� "�UU Phone Number ,r_Date•, �f��° � Signature• ` �'�'���� Witness Signature: FRIDLEY CITY CODE CHAPTER 40Z.WA7ER,STORM WATER,AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156, 1191) � 402.05. PERMIT FEE , Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any hous.e or building for which the application is made,the owner or contractor shall be required to obtain a permit for such connectian,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. 402.06.REPAIRS AND MAINTENANCE TO CONNECTION After the initiat connection has been made to the water service curb stop box or the sewer lead at the property line or a water service or sewer lead has been extended to the property line for connection,the appiicant,owner, or the occupant or user of such premises shall be liable for all repairs required to any water fine and sewer lines necessary for connection of the premises from the main to the premises. ifi the prope[ty'owner requests maintenance service or repairs be performed by the�ty,the property owner sha11 be charged for the costs of the maintenance and/or repairs, including any necessary street repai�s,at a rate set annualty by an administrative policy. It shall be the responsibility af the applicani,owner,occupant r�r user to perform standard maintenance of • the sewer service line ftom the premises to the main inctuding debris c{earing or ro�t cutting and ta maintain the water service curb stop box for operabiiity and at such height as wiff ensure that it remains above the f+nished grade of the iand or property. (Ref 638,1156,1191)