Loading...
Meter Swap - ��5��--��2��� o� ���� Request Number: 9367 Public Works Division Service Request Problem Address: 5825 Main St Requested By: Chaztes Peterson Department: WATER Address: No address provided Problem/Issue: INSTALL AMIt METER Phone Number: 571-9433 Scheduled Date: 2014-11-06 Scheduled T3me: 10:�00:00 ACTION NEEDED:2014 AMR Created by: Wendy Hiatt Date Created: 2014-11-03 ACTION TAI�N: Old meter#29786350 Old reading: 51 l0 Newmeter�44920950 ERT#35159179 Status: Completed Resident Coutacted f'" Date Completed: 2014-11-06 Compteted by: Joseph Katzung Hours �) Request Number: 9367 Public VVorks Division Service Request Problem Address: 5825 Main St Requested By: Charles Peterson Department: WATER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Nnmber: 571-9433 Scheduled Date: 2014-11-06 Scheduled'ITime: 10:00:00 ( �� � ACTION NEEDED:2014 AMR � Created by: Wendy Hiatt Date Created: 2014-11-03 ACTION TAI�N: ............(�`�1.�:.........��.�..-�............�......-...._a��17��0._3._�0.....................................................................................................___....._._............_.__........................_. . ..............G�..i._�......:._����_�_�:n... ..:..-:.........:._os'..1.....5....�a�� . � ...................................._....................:..............._................................................................................_._._...__..._........................._.................................._.....______.. ..................N__...:�::,�.__....�..�+e-�.....::�........-.._�.`�.��:.....o��� .............�..�::�.........._;�.ea..��.�_. y � , ............:.............�..��.._�.....-.-...........:�._��_��i r.._.7....y...................__..............................................................:. Status: 1n Progress Resident Contacted ❑ Date Completed: Completed by: l�I���� �f� V����Y"' - City of Fridiey _ _ , __... �lat?r Dppa�trr�enfi 6431 University Avenue NE � Fridley,MN 55432 (763)572-3566 ��We here6y authorize the�tY��d�ey and/or its employees to do what is necessary ta repiace the water meter. i wxler�and that the property owner e r line from the main to the premise and al)int�rior plumbing• IPer�Y� _ 402.06) 1 alsa hold the City of Fridley and/its e►nP�oyees harmfess ur any amaBes while doing this aperation. This to include,but not iimited tn:vaNes�P�P��g►���'�O°�ar the curb stup box and service line. 1 unde�stand 1 am also required ta obt�n a Permrt Prior to any woric,if necessary. Finat meter�eading(old meter) S�� L"� Name: Address: �`4l a� n�la�`/� S� Phone Number: Date` ����1 y — y I� Signature• �1����� � Witness Signature; � ' FRiDIEY GTY CODE CHAPTER 402.WA'fER,5'�ORM WATER,ANO SANITARY SEWER ADMIN45TRATlON (Ref Ord Na 113,454,555,566,629,638�662!922,988,1144,1156,1191) 4�2.05.PERMIT FEE � Prior to constructing or repair of any vuater or sewer line connecting the existing municipal system and any house or building for which the application is made,the owner or contractor sha11 be required ta obtain a petmit far suck� connectian,and shall pay a permit fee as provided in Chapter 11 of#his Cflde. After 5uch connection has heen made,the Water and Sewer Department shall be notified. It shali be unlawful to caver any�onnecting Gne un111 an inspection has been made and such conaection and the work incident thereto has 6een approved by the City as a proper and suttable cvnnection. 402,.d6.REPAIRS AND MAINTENANCE TO CONNECiION ���p��� - -----,a�+�*ti�� ater service cush stop bnx or the sewer lead at the propert� line or a water service or sewer lead has been extended to the property tme for connec�on,the applicant,owner, or the occupant or user of such premises shatl be liable for al(�epairs required to any water line and sewer lines necessary for connectton af the premises ftom the main to the premises. If the prop�[ty owner requests maintenance service or repairs 6e performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs, including any necessary street repairs,at a rate set annually by.an administrative pnlicy. It shail be the responsi6ility of the app�icant,aWner,occupant or user to perfarm standard maintenance af • the sewer service line from the premises ta the ma9n inc{uding debr�cleacing ur root cutttng and to maintal�the - water service cur6 stop box for operabitity and at such height a5 wiil ensure that it remains above the finished � .. . ._ . . . . "gra�e of�th�larci or�ropet�y.�[R�4 630,-].�5,.t��3:� _. . _. .. _ .