Loading...
Meter Swap �`1 ���� �y�2g3C� � � � o�� _ , , Request Number: 9317 Public Works Division Service Request Problem Address: 6021 Main St NE Requested By: Xiaolong,Shih Department: WATER Address: No ad�dress provided Problem/Issue: INSTALL AMR METER Phone Number: 651-214-5952 Scheduled Date: 2014-10-31 SchedWed Time: 08:30:00 ACTION NEEDED;AMR install Created by: Cheryl Pellegrin Date Created: 2014-10-29 ACTION TAI�N: � ✓ Old meter#95625353 Old reading 381 60 Newmeter#Usedhldbrass ERT#35171677 Status: Completed Resfdent Contacted I! Date Completed: 2014-10-31 Completed by: RyanJohnson Hours �3� Request Number: 9317 Pubhc works Division Service Request Problem Address: 6021 Main St NE Requested By: Xiaolong,Shih Department: WATER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 651-214-5952 Scheduled Date: 2014-10z31 � Scheduled�e: 08:30:00 � � ACTION NEEDED:AMR install Created by: Cheryl Pellegrin Date Created: 2014-10-29 ACTION TAI�N: .............................................................................................................................................................................................:.........................................................................................._._.........................................�......_.................._....................._...............:......._ _........._�..�....._�..�:._�....:�._�........�..............................�.��.2:...5......3......_��......__...................._..._...................................._.............__. .�..______. ! � � _ �3�13 Cv0 ........:�:..�............��.......�........�.._�.........�..........................................................................................................�.__.........._..............................._..__......................................_.........._........._.................._................_............._ .. ......:....:N��......�:�:�."r��............................:.....:...................:. . ...................... ......................................._���'.........._q_�...................._�.SS_......_ _.........���.............��:��.�.�.�:...�:..:.�:........................................................................................................._..................._. _. _. _. ._._. �. .:.................�....��:........�:.........._�_��_7.....:��:7...7.._..............................................................................................._..._................._..........................____... .___.: � .......... .................................. Status: In Progress Resident Contacted � Date Completed: Completed b ����-1� � . - City of Fridley .>� - _ . : _ ___ . . . Watpr�epartm�n - -.-.: , .. , _ _....._ 6431 University Avenue NE Fridley,MN 55432 (763)572-3566 I/we hereby authori:e the Gt1►of Fridley and/ar its employees to do what is necessary to replace the water meter. i understand�at the Pt�peKY°�� is liable for the water tine from the main to the premise and all interior plumbing. (Per City code 402.06� 1 also hold the Giy of Fridley and/its employees harmless vr any amages ma o y while doing this aperation. This to indude,but not limited to;valves►P�P��B•����0°�°r��� stop box and service line. I understand I am also required to obtain a permit ptior to any work,if necessary. �� �� n t r eadi old meter � � � Fi al me e r ng( i c� . Address. �/7V!i( ��1�1.t��,.�'J �� Name• _ - Phone Number: DatB:� Slgnature• Witness Signature: FRIDLEY CITY CODE CHAP 4p2.WATER,ST�RM WATER,AND514NITARY SEWER ADMINISTRAT{ON � (Ref Ord Na 113!464,565,566,629,638,662,922,988,1144,1156,1191) 4�2.�5.PERMfT FEE � Prior to rnnstructing or repair of any water or sewer line connectingthe existing municipal system and any house or building for which the applicatian is made,tfie owner ar cantracta�shall be required to obtafn a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such cannection has been made,the 1Nater and Sewer Department shall be not[fied. lt shaft be uniawfut to cover any cannecting line until an Inspection has been made and su�h connection and the work incide�rt thereto has been approved by the Ciry as a proper and su'�table connection. 402.06.REPAIRS AND MAINTEIVANCE TO CONNECiION ���p�����..ti.,e„M��a r�rhP water service curh stoa box or the sewer(ead at the prvpert' liae or a water service ar sewer lead has been extended to Che propertyline for connecdon,the applicant,owner, or the�ccirpant or user of such prem'�ses shafl be liabte for all�epairs required to any water line and sewer lines necessary for connection of the premises from the main to the premise�. If the propetty owner requests maintenance senrice or repairs be perfarmed by the City,the property awner shail be charged for the costs of the . maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an adm(nistrative policy. It shall be the responsibiliry of the applicant,awner,occupant or user to perfarm standard maintenance of � the sewer service line from the premises to the main inciuding debrisclearingor root cutting and ta maintain the water se�vice curh stop baxfor o�erability and at such height as wiN ensure that it remains abave the finished . . . . . .. .. . .... .. .. ':,g�aife af�ttie land orprdp�rty.�(Re�63�,-1�5,.1.���:� -- . .- ' -