Loading...
Meter Swap 5�5— u�3qco� � Ol-� �. Request Number: 9082 Public Works Division Service Request Problem Address: 4827 2nd St Requested By: Thomas'Ihotsen Department: WATER Address: No address provided , Problem/Issue: INSTALL AMR ME'IER Phone Number: 574-9930 Scheduied Date: 2014-10-08 Scheduled Time: 11:30:00 ACTION NEEDED:Change stopped meter. Created by: Wendy Hiatt Date Cre�ted: 2014-10-07 ACTION TAI�N: Old meter#9023148 Old reading:413 OfNew meter#44920840 ERT#35159542 Status: Completed Resident Coatacted I"' Date Completed: 2014-10-08 Completed by: Ryan Johnson Hours l�"� . � Request Number: 9082 Public Works Division Service Request Problem Address: 4827 2nd St Requested By: lhomas Thorsen Department: WATER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 574-9930 Scheduled Date: 2014-1 -08 SchedWed T9me: 11:30:00 �'-�-1� � � ACTTON NEEDED:Change stopped meter. Created by: Wendy Hiatt Date Created: 2014-10-07 ACTION TAI�N: ................:......................................:..................................................__...._......._._.............__............................................._................................................................................................_.........................................._...._......_................................................ _.:..:��.......��.�...�.�............................. ..._0`�......�.....�............. ...........:.. ......................................................................................................................._.........................................__................. ....��..........�.����-........................._�.../.........1.._�._��..d........................................................................................................................:........_.....:..........................: ....� ...._�...:............. . :......_.....:.:....��:........_��l�Z.._o_$.:�.n.........................................................................................................._................:................:.......__.............:..........._ � ��� _....�U�..........��.-��:��..._-:.... .....:....:.............................................................................................._. ..................................................................................................................................__._........................._ ,��� ��l ��s�2- _.......................................................................................................................................................................................................................................................................................:............................................................_........................................_........................._ Status: In Progress Resident Contacted ❑ Date Completed: Complet b � �l� C6 e " - City of Fridley Water Department 6431 University Avenue NE Fridfey,MN 55432 (763)572-3566 ��We hereby authorize the�ty of Frid�eli andior its employees to do what is necessary to replace tl�e water meter. 1 understand that the property owner i�liabie for the water line from the main to the premise and ail interior plumbing. (Per City cale _' _ _ _ 402.06) 1 also hold the Gty of Fridley and/its employees harmless�or any amages a may u white doing this operation. Thls to include,but not timited to;naives,piping,walls,floors or the curb stop box and service line. I understand i am also required to ohtain a pecmit prior to any work,if necessary. r� � � � Final meter reading(old meter) � Name� Address� Z 2� Phone Number: �t�• ` ��/` , 5ignature: Witness Signature: FRIDLEY CITY CODE pTER 402.WATER,STORM WATER,AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.05.PERMiT FEE Prior to constructing or repair of any water or sewer line conneding the existing municipal system and any house ' or building for which the apptication is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting tine until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. 402.06.REPAIRS AND MAINTENANCE TO CONNEC[iON �_._.�.......,.e��Qry�ce curb stoa box or the sewer lead at the propert� ����p'��'�a�n I�ne for connection,the applicant,owner, line or a water service or sewer iead has been extended to the property' or the occupant or user of such premises shall be liable for all repairs required to any water tine and sewer lines necessary for connection of the premises from the main to the premises. If the prope[ty owner requests maintenance service or repairs be performed by the City,the property uwne�shall be charged for the costs of the maintenance and/or repairs, including any necessary street repairs,at a rate set annuaily by an administrative policy. It shall be the responsibility of the appiicant,awner,occupant or user to perform standard maintenance of • the sewer service fine from the premises ta the main inciuding debris ciearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished ._ . _ _ _ __. _ . _... _._.�.,._-• - - _-�grad'�'of the lana�r-property: �R�€-638,.1155,119.�) ..__ ... _.