Meter Swap 13�205- u���lll�
�1- 0 ��
�
Request Number: 8964
Public Works Division
Service Request
Problem Address: 90&100 63 1/2 Ave Requested By: Allan Hoffer
Department: WATER Address: No adclress provided
ProblemlLssue: INSTALL AMR METER Phone Number: 763-783-1656 or 612-715-0330
Scheduled Date: 2014-09-30 Scheduled Time: 08:45:00
ACTiON NEEDED:Install AMR-See Sandi's email attached
Created by: Wendy Hiatt Date Created: 2014-09-24
ACTION TAI�N:
°1�=b3''3�2'�"'y:`�ldmeter#i?512895 Oidreadin�30 Newmeter#�44920972 ERT#35172418 100 63 1!2 Ave:Old
meter#98160949 Old reading: 190378Q New meter#44920974 ERT#35172423
............................................................:..........................................................................................................................................__._.._.........................................................._.............................._......_...............�..__........_......_.....__...__..___.._____...
Status: Completed Resident Contacted �
Date Completed: 2014-09-30 Completed by: Ryan Johnson
Hours
����
�l.y ��~�"{ 0��
01-�-��
Request Number: 8964
Public Works Division
Service Request
,
Problem Address: 90&l0U 63 U2 Ave Requested By: Allan Hoffer
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR ME1ER Phone Number: 763-783-1656 or 612-715-0330
Scheduled Date: 2Q 14-09-30 Scheduled Time: 08:45:00
AC170N NEEDED:Install AMR-See Sandi's email attached
Created by: Wendy Hiatt Date Created: 2014-09-24
ACTION TAI�N:
90-63 1/2 Way:Oldmeter#17512895 Oldreading: 1597630 Newmeter#44920972 ERT#35172418 I�b31f21�:C)!d
meter#9$160949 Old reading. 140 80 New meter#44920974 ERT#35172423
............................................................................................................................................................_........._.............................................................................................._.........._......._......__.:_..____.......................__............_......._.._....._..__.._
Status: Completed Resident Contacted C`
Date Completed: 2014-09-30 Completed by: Ryan Johnson
Hours
t�.7�`
.
.
Request Number: 8474
Public Works Division
Service Request
Problem Address: 90 63 1/2 Way Requested By: A1 Hoffer
Department: WATER Address: No address provided
Problem/Lssue: INSTALL AMR ME'TER Phone Number: 763-783-1656 or 612-715-0330
Scheduled Date: 2014-07 8 Scheduled 1ime: 08:30:00
�� � V
ACTTON NEEDED:2014 AMR There are two meters at ttris address.
Created by: Wendy Hiatt Date Created: 2014-07-16
ACTION TAI�N:
_�:'..-:D.._���.�........................................................______........:.............................................................................................._................................. .. ... ..........:....................__..............................__.......__.......____.__.
o�i� ���r��._ p
.............................................................................................................................................................................I............................................................_...._.
............ ........_....... . .......................... ..................... ...... ................_..................._....................
_.��...._�T�:_2..�........................................ ...............�.................._...._...______...._... ..........._�......................_..........: . .... ..........._. ....:.........................................._...............
_.A�.�........�►�...�._��...'.....�...........:.................................................................................................................................__................_...............:......._........................................._.......1.........._............_........_......._
�� � ' `
Status: In Progress Resident Contacted C�
Date Completed: Complet d y:
�^�����
� v
�,aJc�
��
� .
�
- - City af F�ldley ._
. . –. Water Department .... :-- -
5431 University Avenue NE-
Fridley,MN 55432
___. _ __ _ _ __ (763)572-3556 _ _ _ _
__ _ __ _ _ __ _ __
I/we hereby authorize the City of Fridley and/or its
employees tc do what Is ne�essary to rep{ace the water meter. I ande+stand that the propert11 ow�r
is liable for the water line from the main tu the premtse and all interiar plumbing. (Per City code
402.06) I also hold the C'ity of Fridley and/its employees hannless for any damages�at may occur
while doing this operation. This to include,but nvt limited ta;va�ves,pipin�walls.flaors or the curb
stap box and service line. 1 understand 1 am also required tv obtain a permit prior ta any wark,'rf
necessary.
Flnal meter reading(old meter)
/� �3 tI� c��
Name• Address• �v �— ,
Phone Number: Date: �����/�
Signature•
____ __ __ _
_ __ ___ __ _-----
Witness Signature•
FRIDLEY q1Y CQDE
CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRAl10N
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE �
Prior to constructing or repair af any water or s�wer tine connecting the existing municipal system and any house
or building for which the appiication is made,the owner or contracto�shall be required to obtain a permit for such
connection,and shafl pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the 1Nater and Sewer Department shall be notified. It shall be uniawFul to cover any connecting line until an
inspection has been made and such connection and the work inddent thereto has been approved by the C'ity as a
proper and suftable wnnection.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
After the initiaf connection has been made to the water senrice curb stop box or the sewer lead at the property
line ur a water service or sewer lead has been extended to the properry line for connection,the appiicant,owner,
or ihe occupant or user of such premises shail be liable for ali iepalrs required to any water line and sewer lines
necessary for connection of the premises fram the main to the premises. If the prop��ty owner requests
maintenance service or repairs be performed by the Gty,the property awner shall be charged for the casts of the
maintenance and/or repairs� induding any necessary street repairs,at a rate set annuaily by an administrative
palicy. It shail be the responsihility of the applicant,owner,occupant or user to petform standard maintenance of
� the sewer service iine from the prem9ses to the main inc{uding de6ris dearing or roat cutting and ta maintain the
,.�,er,.e.,,,,.e�,.ti�t,,,,ti,,,,f„�,,.,o�ti;r,,,�n�at cur_h heiQht as wiii ensure that it remains above the finished
a `
- � . City of Fridley _.
. . _- Water Departrnent .. _-- - .
6431 University Avenue NE-
Fridley,MN 55432
___ _ _ _ _ (763)572-3556 __ __ .
1/we hereby authorize the�ty of Fridley and/or its
employees to do what is necessary to repiace the water meter. f understand that the property owner
is liable for the water line from the rnain tu the premise and all interior plumbing. (Per City code
40Z.06) I also hold the Ciiy of Fridley andJits employees harmless for any darr�es tfwt may occur
while doing this operation. This to in�lude,but not limited to;valves,plping,walls,floors o�the curb
stap box and service line. i under.stand 1 am also required ta obtain a permit prior to any woric,if
DCp ►�cT�� necessary.
Flnal meter reading(old meter)
�^ ��-- Name• Address.�_.,�� ��
�� ��� �
Phone Number. Date: ���g�!
���� Signature•
�"r"" -_ __ __
___ __._. __ _____.__
� Witness Signature:
����.��� . FRIDLEY UTM C�DE
��I�J CHAP ER 402.WATER�STORM WATER,AND SANITARY SEWER
ADMINISTRA110N
(Ref Ord No 113,464,565,566,629,638,662�922,988,1144,1156,1191)
�T ' " 402A5.PERMIT FEE �
1��;��� Prior to constructing or repair of any water or sewer line connecting the existing municipaf system and any hous.e
� � or building for which the application is made,the owner or contractor shall be required to obtain a perrnit for such
wnnection,and shell pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shalt be unlawful ta cover any connecting line until an
inspection has been made and such connection and the work inadent thereto has been approved by the City as a
praper and suitable connection.
402.�.REPAIRS AND MAINTENANCE TO CONNECI'ION
Afte�the initial connection has been made ta the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall be liabie for all�epalrs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the prop�tty owner requests
maintenance senrice or repai�s be perFormed by the�ty,the property owner shall be charged for the costs of the
maintenance and/ar repairs, including any necessary street repairs,at a rate set annually by.an administrative
palicy. It shalf be the responsibility of the applicant,owner,occupant ur user to perForm standard maintenance of
' the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
,.�*o��e�,�,.e�,�ti�t,,,,ti�„c����p�ahii�anrl at such hei¢ht as wlll ensure that it remalns above the finished