Meter Swap � ��__ c� �g���
�� —��
3311
Request Number: 8560
Public Works Division
Service Request
Problem Address: 159 63 1/2 Way Requested By: Darlene Vallin
Department: WATER , Address: No adchess provided
Problem/Issue: INSTALL AMR METER Phone Number: 574-9436
Scheduled Date: 2014-07-30 Scheduled'Iime: 09:00:00
ACTION NEEDED:2014 AMR
Created by: Wendy Hiatt Date Created: 2014-07-22
ACTION TAKEN;
Old meter#89749997 Otd readi 2389 00 New meter#44921160 ERT#35159681
Status: Completed Resident Coatacted I"'
Date Completed: 2014-07-30 Completed by: Ryan Johnson
Hours
�
. � Request Number: 8560
Public Works Division
Service Request
Problem Address: 159 63 1/2 Way Requested By: Dazlene Vallin
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 574-9436
Schedaled Date 2014-07- SchedW ed Time: 09:00:00
� 1
ACTION NEEDED:2014 AMR
Created by: Wendy Hiatt Date Created: 2014-07-22
ACITON TAI�N:
..............................................................................................................................:..................................................................................................................................................................................................................................._.................._.__..........._...............
�...��.�.-._�.................�.�.����.�.._�......................................................................................................._..._._......................_........�.._.. ...._.._...._
2 � �-oo
.
_
....�::.�...._�.�.��:�.....................................�............_�'..:................................................................................_..........................__........................................................:............:............._....._...................__.....
....�:-�..�......_�.T�:�............................... ...�C 2....:._��_�...........................:........................................................:.............................._...................._......................................................................_
_..._n��::�......... __ ._..���._-...:...�6...........:.:..........:.........................................................................................................................................................:..............................................:..._..................................._�............._
� ..........
....:...�.�x.......�-...................3.......�_1..._s...�..�...... ...._.I...........................:......................................................................................................:............................._..................................__..................._.............._
Status: Tn Progress Resident Contacted L�
Date Completed: Comple
`� �- 1� '
.
_ .. _ » � - City of Fridley
_ _..
_ , � --• Water Department . �.., ,
6431 University Avenue NE-
Ftidley,MN 55432
[763)572-3566
!/WL bg _hv a�thnrl�d�e C�nf..F�dlc�an�l/or its —
employees ta do what is necessary to replace the water meter. {understand that the property owner
is liable for tfie water line from the main to the premise and aU interlor plumbi�. (Per qty code
402.06) I also hold the(�iy of Fridley and/its empioyees fiarmless for arry darr�es that may oaur
while doing this operation. This to include,6ut not limited to;walves,piping,walls,floors or the a�rb
stap box and service line. I understand i am also required to obtatn a permit prior to any woriy if
necessary.
Flnal mete�reading(old meter) � ��� � _��
Name• Address: � 1 � '
Phone Number. pate� �" ,JV '"/�
signature: (/ �
Witness Signature•
FRIDLEY pTY CODE
CHAP'TER 4fl2.WATER,STORM WA'fER,AND SANiTARY SEWER
ADMINISTRATION
{Ref Ord Na 113,464,555,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE �
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any hous�=
, or building for which the application is made,the owner or contractor shaA be required to obtain a permit for such
co�nection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawfut to cover any cannecting Iine until an
inspection has been made and such connection and the work lncident thereto has been approved by the C�ty as a
proper and suitable connection.
4U2.06.REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service cu�6 stop box or the sewer lead at the property
line or a water service or sewer lead has been extended to the property line for connectio�,the applicant,owner,
or the occupant or user of such premises shall be liable for all repairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If#�e prop�tty owner requests
maintenance service or repai�s be performed by the qty,the property owner shall be charged fac the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annuaily by an administrative
palicy. tt shaiFbe the responsibility of the applicant,owner,occupant or user to pe�farm sta�dard maintenance of
' the sewer service line from the p�ernises ta the main including deb�is clearing or root cutting and to maintain the
water service curb stop box for operabitityr and at such height as will ensure that it remains above the flnished
� grade of theJand or property. (Ref 638,1156,1191)
!