Meter Swap ����
�-�--y���
Request Number: 8616
Public Works Division 3���
Service Request
Problem Address: 194 63 1/2 Way Requested By: George Green
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 571-2951
Scheduled Date: 2014-07-31 Scheduled'Iime: 0830:00
ACIION NEEDED:Install AMR
Created by: Wendy Hiatt Date Created: 2014-07-25
ACTION TAI�N:
Old meter#16547093 Old readin 1060�130 New meter#44921186 ERT#35171764
Status: Completed Resident Contacted 1'
Date Compteted: 2014-07-31 Completed by: Ryan Johnson
Hours
T
Request Number: 8616
Public Works Division
Service Request
ProblemAddress: 194 63 1/2 Way Requested By: George Green
Department: WATER Address: No address provided
Problem/Issue: INSTALLAMR METER Phone Number: 571-2951
Scheduled Date: 201407-31 Scheduled Time: 08:30:00
S� � �r3�
ACTION NEEDED: InstallAMR
Created by: Wendy Hiatt Date Created: 201407-25
ACTION TAKEN:
_..................................................................................................................................................................
...........................................................................................................................
........................._...........__......................_..._...........__...........___......._.....
_...��............ .... ...-�.-:r:�.........� � ��'� �1� t 3
� � ......................................................................................................................................._...._______.....................................................................__.
..................................................................
..._oL�........._�����.........-.........._�..d�_�......_.1.....�_c�.............................................._....................................__..._.._..._..................................._.. _._.____._. __
..... .........
_:._N_��.........��............. . ... ....:................�.��_Z..�..._�:._�._�0...................................................................._........................................................................................
���' _............
_........���.......Q-�_�:��.�.-.......... .....
.
..................................................................................................................................................................................._........................................................ ._
........
........._._�-.�-�...�....:�.........:3�.�...:�._�._..���..............................................:................ .
Status: In Progress Resident Contacted ❑
Date Completed: Co let b :
/��'��
� - City of Fridley
" Water Department
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
IJwe hereby authorize the�ty of Fridley and/or its
employees to do what is necessary to replace the water meter. i understand that the property owner
is liable for the water line from the main to the premise and ail interior plumbing. (Per City code
402.06) 1 aiso hold the Gty of Fridley and/its employees harmless or any amages a may oc ur -- —
while doing this opera�on. This to include,but not limited to;valves,piping,walls,fioors or the curb
stop box and service line. I understand 1 am also required to obtain a permit prior to any work,if
necessary.
Final meter readin old meter) l�"'v ` `� �
B�
t2 �
Name• Address:
Phone Number
Date• ��3(' ,"1
Signature•
Witness Signature:
FRIDLEY CITI(CODE
CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRATION
(Ref Ord Na 113,464,565,566,629,638,662,922,988,1144,1156, 1191)
402.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line connectirtg the existing municipal system and any house
or buiiding for which the application is made,the owner or contractor shali be required to obtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
��_rh�a�i� • rnade to th�wa*P�service curb stop box or the sewer lead at the propert�
line or a water service or sewer lead has been e�ctended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall be liable for all repairs required to any water line and sewer lines . _ ,
necessary for connection of the premises from the main to the premises. If the prope[ty owner requests
maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. it shall be the responsibility of the appiicant,owner,occupant or user to perform standard maintenance of
• the sewer senrice line from the premises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
�" �"- �� "" - " ' -grade of the lartd or property: (Ref 63�,1156,1191} - -�
_ _ _ . _ _ __. ._ _