Loading...
Meter Swap ��-��� �yqa�� o� ���--� � 3�� Request Number: 8386 Public Works Division Service Request ......................................_.............._....................................._.....�..._........_..__.�...........�.._...___.�.._.__.................................._................ ......._..................................... ......._.................................._......................._....__..........---_._................................................................�.........._................... Problem Address: 90 66th Way Requested By: BiN DuPay Department: WATER Address: No address provided Problem/issue: INSTALIAMR METER Phone Number: 612-280-2404 Scheduled pate: 201407-18 Scheduled Time: 08:30:00 ACTION NEEDED: 2014 AMR Created by: Wendy Hiatt Date Created: 201407-10 ACTION TAKEN: Old meter#17996782 Old reading 371 60 New meter#44921244 ERT#35171872 ..........................................................................................................._....__.......__.............._........................_.._...._................................................_........................................................,......_.._._............._......_................................._.__............_.............. .........�...�._..�.....�.............................................................................._................................_...........................................................,.............................................................,.................................._.............._..........................................,....._.._...................._ .:......................................................................................................._.............._....__.............._.._............................,.................................................................................................................................................._......_.............,..........................._..._..._........ w.................................................................._......................................................................................................................................................................._..............__........._.�...__.___....�...�.._..�.....�.........�........._.._......................................._......._.... Status: Completed Resident Contacted O Date Compieted: 201407-18 Completed by: Ryan Johnson Hours � Request Number: 8386 Public Works Division Service Request Problem Address: 90 66th Way Requested By: Bill DuPay Department: WATER Address: No address provided Probleml{ssue: f NSTALL AMR METER Phone Number: 612-280-2404 Scheduled Date: 201407-18 Schedu�ed Time: 0'� , ��,..� � ;�-�� ACTION NEEDED: 2014 AMR Created by: Wendy Hiatt Date Created: 201407-10 ACTION TAKEN: .......................:......................................................................................................................................................................................................................................................................................................_.__........................................._.....�.................. _��.�....��-���................�._.�1....`�..�I.....�.`�.._�._�-.................................................................................................__......................:._........................_...._............................_ ���.......&��:1c5�.p....-..........._�.:7._�._�_CaC�............................................................................................................._..................._.........................................................................._..........._ � w���� �l�21 Z-�'`� ....... .....:.........................................................:..............................................._.............. l�.......................................................................................................... . .........................................................................................................._............................ .... ��......�b�:'�._'...... ..:. ....................................... .... .... ..��.�.........:.._�.�...1..^......7..........._1.._�..�.Z.........._....................................................__......._...................................................:.................._.__....:_...................................__....................._ Status: In Progress Resident Contacted ❑ Date Completed: Comp ed by: � l "� . � , � " � - City of Fridley. _ . . __. Wat�r Department .. _.. _ 6431 University Avenue NE Fridley,MN 55432 (763)572-3566 i/we hereby authorize the City of Fridley and/or its emPloyees to do what is necessary to replace the water meter. I understand that the property owner is tiable for the water line from th�main to the premise and all interior plumbing. (Per C'aty code 40Z.06) 1 alsa hold the City of Fridley and/it4 empfoyees hanniess far any damages that may occur while doing this operation. This to inciude,but nut limited to;valves,piping,walis,floors or the curb stop box and service line. i understand I am also required to obtain a permit pNor�any work,N necessary. Final meter reading(old meter) �� � ��D Name• Address• �� `�� "" � Phone Numbe�: Date: �� t�` 1 Signature: Witness Signature: �RIDLEY qTY CpDE CHAPTE 402.WATER,STORM WATER�AND SANITARY SEWER ADMINtSTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988, 1144,1156,1191) 402.05.PERMIT FEE � Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any hous.e or building for which the application is made,the owner or contrador shal{be required ta obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. Afte�such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. ' 40Z.06.REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service or sewer lead has been extended to the property ilne for connection,the applicant,owner, or the occupant or user of such premises shall be liable for aif repairs required to any water line and sewer lines necessary for cunnection of the premises from the main ta the premises. If the prop�[ty owner requests maintenance service or repairs be performed by the�ty,the property owner shall be charged for the costs of the maintenance and/or repairs, inciuding any necessary street repairs,at a rate set annually by an administrative policy. It shall be the responsibility of the app{icant,owner,occupant or user to perform�tandard maintenance of � the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water servlce curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)