Meter Swap s�
���= � ��q �Y��
� � _ �,�:��.
Request Number: 8557
Public Works Division
Service Request �
Problem Address: 6468 Ashton Ave Requested By: Stephanie Welke
Department: WATER Address: No address provided
ProblemJlssue: INSTALLAMRMETER PhoneNumber: 1-623-465-2705
Scheduled Date: 2014-09-15 Scheduled Time: 09:00:00
ACTTON NEEDED:2014 AMR
Created by: Wendy Hiatt Date Created: 2014-07-22
ACTION TAKEN:
Old meter#96311743 Old reading 983 30 New meter#44921500 ERT#351?2365
Status: Completed Resident Contacted t-
Date Completed: 2014-09-15 Completed by: Pete Gunderson
Hours
a��
i? �
�;..
��..
. .. .. . . . .. .... . . . . . . . . . . . . .. . . . . ._. . . .
� Request Number: 8557
Public Works Division
5ervice Request
Problem Address: 6468 Ashton Ave Requested By: Stephanie Welke
Department: WATER Address: No address provided .
3
Problem/Issue: INSTALL AMR METER Phone Number: 1-623-465-2705
ScheduledDa : '^14-09-10 Scheduled'Iime: 09:00:00
(�., --��- --f�� {��
ACTION NEEDED:2014 AMR ,_.,.. ._,
y � ��
Created by: Wendy Hiatt Date Created: 2014-07-22
ACTION TAI�N:
e�m�-� �- - �� 1. ���.���
... ... .....� ._........... _...._._.�._.__....._.._.._.___..__._....._...._......____.._ ......�
..............c�_L:�..::��.._��c�-_.....__............_..__....`�.._`�...�.._.�..:.�_o.._.................__._......_.....�_..____.._....__._..._.._.�.�_:....__....__...._._
...............�_�....._�n��.-�_..._...__...._��_�,�..!_500__..._..�._�..._....._...................._...._.__...__._........_.�......__..._______.._....._...�......__
...........���...._:��....��..-:._..__.....�.....__........__�.......____.................._��.._..._____................_._.._...__.._____...._____...__....._._-._-_.___....._._...._
.
.._.__._....................:��z-�...��__........................���r_�...._�:�._...6_._5...._...__.�._.._�_.�............_.......__......_........._........____.._..___.__.._._._..�___......__...._
5tatus: In Progress Resident Contacted �
Date Completed: Completed by:
- � �� l
� �
- City of Fridley
i Water Department :
� 6431 UniversityAvenue NE � �r��-`
Fridiey,MN 55432
(763)572-3566
I(we hereby authorize the City of Fridley and/or its
employees to do what is necessary to replace the water meter. 1 understand that the property owner
i�liahle fbr the water line from the main to the premise and all interior plumbing. (Per t�ty code
402.06) I also hold the Gty of fridley andiits employees harmiess�or a—nY aamages'Efi�a maY occ�r � �
while doing this operation. This to include,but not limited to;valves,piping.walis,floors or the curb
stop box and service line. I understand I am also required to obtain a permit prior to any work,if
necessary. �
nal meter readin ald meter) ���
Fi B(
Name. Address• ���"��`� `v�
Phone Tiumber: Date: ``��i� 1
Signature: -"
Witness Si�nature: �
FRIDLEY CITY CODE
' CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRA'T�OM
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipaf system and any house
or building for which the appiication is made,the owner or contractor shall be required to obtain a permit for such
connection,and shall pay a permit fiee as provided in Cfiapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notif ed. It shall be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been appraved by the City as a
proper and suitable connecCton.
4�2.06.REPAIRS AND MAINTENANCE TO CONNECi'ION
����p���S�11 a � t�^�•��*�r service curb stop box or the sewer lead at the propert�
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall be liable for all repairs required to any water line and sewer lines
necessary for connection of the premises from the main ta the premises. If the prope[ty owner requests
maintenance service or repairs be performed by the City,the property owner shaf{be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate 5et annually by an administrative
policy. It shatl be the responsibil'ity of the applicant,awner,occupant or user to perform standard maintenance of
• the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
_.v_... . _.,_,_._ _ _.,. -. _ � _ . ._ _ _ _
grade of'Che tarta or t�nA��Y• 4Re€-638:-1215i.119��._ ...__ _ . , .._._ _ _. . ._.__ __. --- _._ _---- ,_._... ._ _ __