Meter Swap 1�3a�5=sy�3av
Q��D G:�}�
� '-
Request Number: 9027
Public Works Division
Service Request
Problem Address: 129 Christenson Court Requested By: Dale Becker
Department: WATER Address: No address provided
Problemllssue: � INSTALL AMR METER �Phone Number: 572-8534
Scheduled Date: 2014-10-02 Schedul ed'Ii me: 10:00:00
ACTION NEEDED:2014 AMIt Phase 2
Created by: Wendy Hiatt Date Created: 2014-10-01
ACTION TAI�N:
Old meter#98578499 Old reading 023 90 New meter#44922291 ERT#35159779
Status: Completed Resident Contacted (""` ,
Date Completed: 2014-10-02 Completed by: RyanJohnson
Hours
�.� ` ,
M�
.�
� Request Number: 9027
Public Works Division
Service Request
Problem Address: 129 Christenson Court Requested By: Dale Becker --
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Namber: 572-8534
Scheduled Date: 2014-10-02 � Scheduled Time: 10:00:00
i4
1 C�G"I � Cc� O�`
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-10-01
ACTION TAI�N:
...................................................................................................................................................................................................................................................................................................................................................................................................................._.
_.._��....._�T�.....�...�......................._��.:�.7..g�1.qq..........:.............................................................................................................._.............................._._.
....................
....._b L�........_����.��..:................................_d 2 3�..�q o
........................................................................................................._...._........._.................................................................____...
��w � � �2.ZZ�'�'
........................................................................-�...............�...........�1�...........................................................................................................................................................................:............................................................_........................
..........._Il���..........._�1:..1�.�.....�.".......�................................:................................................................................................................................:
.................��-�:.�............;��15�:.. .7......7�'......................................................................._._.............................................................................__...............:............................................._..................._....
Status: In Progress Resident Contacted ❑
Date Completed: Completed
i o-Z�I�
` - City of Fridley
_ ._ . .
. - W�ter Department
_ .,.. .._.�,.__.._
6431 University Avenue NE
Fridley,MN 55432
(763)57Z-3566
I/we hereby authorize the Gty of Fridtey and/or its
empioyees to do what is necessary to replace the water meter. I understand that the property owner
is liable for the water line from the main to the premise and all iMerior plumbing. (Per�aty code
402.Q6) i also hold the City of Fridley and/its employees harmiess or any amages may -
while doing this operadon. This to include,but not limited to;vaNes,piPing,wails,floors or the curb
stop box and service line, I under�tand I am also required to o6tain a permit prior to any work,if
necessary.
Final meter reading(old meter) ������o
Name• Address• / Z / ���� C.r.IJ/�
Phone Number: Date� l�s�i'�7
Signature:
Witness Signature• �
FRIDLEY CITY CODE
�HAPTER 4Q2.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall be required to obtain a permit for such
connection,and shaN pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shaii be notified. it shal!be unlawfu!to cover any cannecting line until an
Inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECiION
-A#ter-t�e-iai#ial..coanectinn.has�►+made to the water service curh stop box 4r the sewer lead at the propert�
line or a water service or sewer lead has 6een extended to the property line far co�nection,the applicant,owner,
or the occupant or user of such premises shall be liable for aH�epairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. if the prop�tty owner requests
maintenance service or repairs 6e perfarmed by the City,the property owner shall be charged for the costs of the
. maintenance and/or repairs, induding any necessary street repairs,at a rate set annually by.an administraUve
policy. It shall be the responsibil'rty of the applicant,owner,occupant m user to perform standard maintenance of
• the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
water service cur6 stop box for operability and at such height as will ensure that it remains above the finished
- - .
. . -- �- - �--- ._. .
"grade of tf�e land or�rop�r�.y.�(Re�638,_1�5,.Z�n3:) _. .. . .. . . . _ _ :