Meter Swap I ���S -
S ���ao
..,
D �, ,�(-�
Request Number: 9026
Public Works Division
Service Request
Problem Address: 130 Christenson Court Requested By: Tom Markham
Department: WATER Address: No acldress provi�d
Problem/Issue: INSTALL t1MR ME1ER Phone Number: 763-218-8354 or 571-1735
Scheduled Date: 2014-10-03 Scheduled'IYme; 10:30:00
ACITON NEEDED:2014 AMIZ Phase 2
Created by: Wendy Hiatt Date Created: 2014-10-01
ACTION TAI�N: � ✓
Old meter#9713243 8 Old reading 059 30 New meter#Used o2d t�'ass.ERT#35159750
Status: Completed Resident Contacted !""
Date Completed: 2014-10-03 Completed by: Ryan Johnson
Hours
\�O
'J�
Y
Request Number: 9026
Public Works Division
Service Request
Problem Address: 130 Christenson Court Requested By: Tom Markham
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR ME1ER Phone Number: 763-218-8354 or 571-1735
ScheduledDate• 2014-10-03 Scheduled'1Time: 10:30:00
1
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-10-01
ACTION TAI�N:
........:.................................._..........................,............................................................................._........................................................................................................._._.__.................................................._..._............................................._,................___......._
_.._�.�:�....L���.-..�............�71.3...Z�_.�.._g............................................................................ .
...... . . . . . . . . .
. . .. . . .. .. .. ...................................._.___.............._.... .....
.....n��.....:........�.�......�.......�:��.��a.�....�..�..............�s�'.Z 5:.:.�........................................................................_......................................................._......................._
.N:�.�...........�'t-,��"�:�-::........::........:........... ...... ::...........
,
� - . �
.. .. . ... _. . ... .. ..................................................._�x...................c�.....�.............................._...._._�S
_.�..��,�.:...........�;�:_�..��.�-.....�....................................................................................:...........................................................................:.
............��:�........3�:�_s::.�.�.��................:.............................................................................................................................:..............._..........:._...__�_._..__..........._..___......
Status: In Progress Resident Contacted p
Date Completed: Com leted
1�����
� �
P
�
f
' - City of Fridley
_ _ _:, _ ,.:;� . ,. !A/a��r tlepartment
__ : .,.
_ . ,_. __._..., ....��...._
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
I/we hereby authorize the tity of Fridiey and/or its
employees to do what is necessary to replace the water meter. 1 understand that tfie property owner
�.liable for the water tine from the main to the premise and all interior plumbing. (Per C'ifiy cflde
402.06� I aisa hold the C'ity of F�idley and/its employees harmtess or any amages may o�"
whife doing this opera�on. This to include,but nat timited ta;valveps�piping,walls,fiours or the curb
stop box and service line. 1 understand 1 am aiso required to alrtain a permit prior to any work,if
necessary.
Final meter reading(old meter) O� l ���0
Name� Address: I �o ��lM t�J�a�.- ��` �
Phone Number: Date; <�����` �
�
Sig�ature• a
Witness Signature:
FRIDLEY CITY CODE
C R 4U2.WATER,STORM WATER,AND�IN{TARY SEINER
ADMINtSTRATtON
(Ref�rd Na 113,464,565,566,624,638,662,922,988,1144,1156,1191)
402.05.PERMIT�EE
Prior to constructing ar repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shaU be required to abtain a permtt for such
connectian,and shall pay a permit fee as pruvided in Chapter 11 of this fAde. After such connectian has been
made,the Water and Sewer Department shatt be nottfied. it shafi be unlawful to cover any connecting line until an
inspection has been made and such cannection and the work incident thereto has been approved by the City as a
proper and suitahle connection.
40Z.06.REPAIRS AND MAINTENANCE TO CONNEC7'ION
_q{�q���yp�ba�n rnade ta the water service cur6 stoe box or the sewer tead at tfie propert'
line or a water ser+rice or sewer lead has been extended to the prnpertyline for c4nnection,the appiicant�owner,
or the occupant or user of such premises shall be liabfe far all repairs required to any water line and sewe�li�es
necessary for connection of the premises from the main ta the premises. ff the propgliy owner requests
maintenance service or repairs be performed by the City,the property awner shal{be charged for the costs of the
. maintenance and/or repairs, including any necessary street repairs,at a rate set annuaity by an admtnistrative
policy. It shail be the responsibitity ofi the appilcant,owner,occupant or user to perfarm standard maintenance af
• the sewer service{ine ftam the premises to the main incfuding debri5 cfearing or root cutting and to maintain the
water senrice cur6 stap box for aperability and at such height aswill ensure that it remains above the fnished
. . _ . ._ .. . .._ ._ ..
,,.grade of�tt�e land or�ropeti.y.�(Ret 633,-1�5,.t�g3:� __