Meter Swap /a934��5c�ggo
Ol-D'��,n
,
Request Number: 8989
Public Works Division
Service Request
Problem Address: 142 Christenson Court Requested By: Raymond Tranby
Department: WATER Addresss No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 571-2721
Scheduled Date: 2014-10-02 Scheduled Time: 08:00:00
ACITON NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014=09-29
ACTION TAI�N:
Old meter#99622289 Old reading 1081 20 Newmeter#44922296 ERT#35159790
Status: Completed Resident Contacted I'"
Date Completed: 2014-10-02 Completed by: Ryan Johnson
Hours
�,o
�
Request Number: 8989
Public Works Division
Service Request
Problem Address: 142 Christenson Court Requested By: Raymond Tranby
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 571-2721
Scheduled Date: 2014-10-02 Scheduled Time: 08:00:00
_—T?� �-s �'� � �c�
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-29
ACTION TAI�N:
........................................................................................................................................................................................................................................................................................................................................._.............................................................._.............
............�...���:�.�.'....:......�.......................�..�...�..�..2.-........�2.._$._`�......................................_........................................._........_.._.....................__.__. _. _. .
. ....... .... .......
._.....o....�.......�.....,�.......-�..........��u_�...-....................�.�.._g.._.1..........�.._Z_o............_..................�.....___...__......._.____.
..______....�........_______...._.................._.........
.�....�.........—�..................�_T:��-_�-..........._�...�...�.....�.�._2�...q�...................................................................._._
_...._.__._..........................................................................
..��.�s.............�a�t��.��.....�....._�....................................................:...............................................
............................._..........................................._............_.........................._......._..._........_
................=__�..�.:..�..................�s�_s.."...�7�,p........._..................................................................._.........................._............................................................_.._..............................._..._
Status: in Progress Resident Contacted ❑
Date Completed: Comp eted
l�—Z—/�
.
� City of Fridley
. VUater Department
_ .. __
_:.. . �.��-__ .
6431 University Avenue NE
Fridley,MN 55432
(763)5TZ-3566
1/we hereby authorize the�ty of Fridiey and/or its
employees to do what is necessary to replace the water meter. I understand that the property owner
_�s 1ia61e ior the water line from the main to the premise and all intenor piumbing. (Per Gty code
402.06) I aiso hoid the C'ity of Fridley and/its empioyees harmless or any amages may -
while doing this operation. This tu include,but not limited tn;valves►PiP��g.Walis,floors or the curb
stop box and service line. I understand 1 am also required to o6t�n a permit prior to any work,if
necessary.
Final meter readin old meter) �� �� � � O
�I
Name: Address• ��� �(�"- 'a� �'"
Phone Number: Date:
��rz!�
Signature:
�tness Signature•
FRIDLEY CITY CODE
CH R 402.WATER,STORM WATER,AND SANITARY SEWER
ADMtNISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE
Prior to constructing or repair af any water or sewer line connecting the existing municipal system and any hause
or building for which the application is made,the owner or contractor shall be required to obtain a permit for such
connection,and shall pay a permit fee as provided 4n Chaptec 11 of this Code. After such connection has beesi
made,the Water and Sewer Department shall be notified. It shal)be unlawful to cover any connecting line until an
inspection has been made and such connection and the work inc(dent thereto has 6een approved by the City as a
proper and suitable connection.
402A6.REPAIRS AND MAINTENANCE TO CONNECTION
��b���p�as�p��,adP to the water service cur6 stov box or the sewer lead at the propert�
line or a water servite or sewer lead has been e�ended to the propertyline for connection,the appiicant,owner,
or the ocwpant or user of such premises shall be liable for all�epairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. if the propetty owner requests
maintenance service or repairs be perFormed by the City,the property owner shali be charged for the costs of the
. maintenance and/or repairs, including any necessary street repairs,at a rate set annually by.an administrative
policy. It shali be the responsibility of the applicant,owner,occupant or user to perform�tandard maintenance af
- the sewer service line from the premises ta the main including debris clearing or root cutting and to maintain the
water 5ervice curb stop box for operability and at 5uch height as will ensure that it remains above the finished
. :, . . ... .__ .
"'gracfe of�tf�e land or-prop�riy.�(ReF 638,_1�5,-1.�n3:� _.