Loading...
Meter Swap � a33�l5�suc�10 oi-� ��� � Request Number: 9032 Public works Divisson Service Request Problem Address: 143 Christenson Court Requested By: Alice Irwin Department: WATER Address: No address provided Problem/Issue: INSTAI,I,AMR ME'IER Phone Number: 571-6156 Scheduled Date: 2014-10-06 Scheduled'ITime: 01:00:00 ACTION NEEDED:2014 AMR-Phase 2 Created by: Wendy Hialt Date Created: 2014-10-01 ACTION TAKEN: Old meter#97648868 Oid reading 053 80 New meter#44920913 ERT#35159553 Status: Completed R�esident Contacted I"'` Date Completed: 2014-10-06 Completed by: Ryan Johnson Hours � � . Request Number: 9032 Public Works Division Service Request Problem Address: 143 C}uistenson Court Requested By: Alice Irwin Department: WATER Address: No address provided ProblemlIssue: INSTALL AMR METER Phone Number: 571-6156 Scheduled Dat • 2 14-10-06 � Sch duled T�me: 01:00:00 ACTION NEEDED:2014 AMR-Phase 2 Created by: Wendy Hiatt Date Created: 2014-10-01 ACTION TAI�N: ............................................................................................................................................................................................................................................�........................................................................_........_...................._......._............................_.._............. , _.a�� �.�:�............. .......:................................... ..._7....�.................._��._�.........................._..........................:................__...............__._...............................:....:....................__.................__ ................................ ........ � .....��:.�.�........_(�����.:�r��......-......................._�....�.._3_�.�....g.._�........................:......................................_................................._. .. __ . . ............. __.............................. ....1�;�.�......��:.....�:.�...�...........��......�.�...�:..._�....�..�. C � ................................................................................................................._...__............................................................_................_.. ��_........._Q�.�.����,....:...�:. . ........................... ......................................................................................................................................................................................................._.........__........................................................._ . ......�:..��::...�.................3 s l._�.��:._�..��......................................................................................................................................................................................_........................:.........._ Status: In Progress Resident Contacted � Date Completed: Completed ��-�-��{ ,, , ' - City of Fridley ; . �.�. Water Department 6431 University Avenue NE - ' ' �� Fridley,MN 55432 (763)572-3566 i/we hereby authort=e the�ty of Fridley and/or its employees to do what is necessary to replace the water meter. I understand that the property owner �s liable for the water(ine from the main to the premise and ail interior piumbing. (Per City code 402.06) i also hold the Ciiy of Frldley and/ii�s employees harrniess or any amages may u - while doing this operation. This to include,but not limited to;vaives,piping,walls,floors or the curb stop box and service line. 1 understand i am also required to obtain a pertnit prior to any work,if necessary. Final meter reading(old meterj � ����� v D Name: Address: /v/ � C ���� (--�� Phone Number: Date: l�T��.� Signature: Witness Signature: � FRIDLEY CITY C�DE CH 402.WATER,STORM WATER,AND SANITARY SEWER ADMtNISTRATION (Ref Ord Na 113,464�565,566,629,638,66Z,922,988,1144,1156,1191) 402.05.PERMIT FEE Prior to constructing or repair of any water or sewer line cannecting the existing munlcipal system and any house or buiiding for which the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as pruvided in Chapter 11 of this Cade. After such connectlon has been made,the Water and Sewer Department shali be notified. it shall be unlawfut to cover any connecting line until an inspection has been made and such connection and the work incident thereta has been approved by the City as a proper and suftabie connection. 402.06.REPAIRS AND MAINTENANCE TO CONNECTION -Af#�tb�-iaitial c�nner.t�nnhat�Pn made to the water service cur6 stoa box nr the sewer lead at the propert� line or a water service or sewer lead has been extended to the propertyline for connection,the appli�nt,owner, or the�ccupant or user of such premises shall be liable for all repairs required to any water line and sewer lines necessaryfor connection of the premises from the main to thepremises. if the propgtty owner requests maintenance service or repairs be performed by the City,the property awner shaii be charged for the costs of the . maintenance and/or repairs, inciuding any necessary street repairs,at a rate set annually by.an administrative po[icy. R shall be the responsi6ility of the appli�ant,awner,occupant or user to perForm standard maintenance of • the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curh stop box for operability and at such height as wili ensure that it remains above the finished . . ._ . .__. ... . „•grade of t�ie land or�rop�rty.�(Rei 63�,-1�5,.t�n]:) _. � �