Meter Swap l (�`�3�5- ��{SS���
oi _���.
Request Number: 8980
Public Works Division
Service Request
Problem Address: 159 Christenson Court Requested By: Ahmed Mohammed
Department: WATER Address: No address provided
Problem/Issue: INSTALLAMRMETER PhoneNumber: 612-239-3657
Scheduled Date: ' 2014-09-30 Scheduled Tiroe: 02:00:00
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-26
ACTION TAI�N:
Old meter#96529728 Old readin 095 40 New meter#44922265 ERT#35172434
Status: Completed Resident Contacted I'!
Date Completed: 2014-09-30 Completed by: Ryan 7ohnson
Hours �
Q�
�
Request Number: 8980
Public Works Division
Service Request
Problem Address: 159 Christenson Court Requested By: Ahmed Mohammed -
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 612-239-3657
S�heduled Date: 2014-09-30 Scheduled Time: 02:00:00
�
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiait Date Created: 2014-09-26
ACTION TAI�N:
......................................................................................................................................................................................................................................................................................................................................................................................................._._.........._
.�L�...._�:_%....��...................�..�.,...�5 2._g..7.._2.�......................................................................_.........._...._.............._..................................
...........__..._
�
......._��::�........_.��-�:�.�:�.......-..�........................._��'.�� 2�� ,
................................. ................................................................................_......................................................._........................._.........__........................._.__
..�:..�......�.r�.�._�............�L�l.Z...2_�..�
..................................................................................................................._...............................__..___.___................._.
.._��W ���� - �
................................................................................................................................................................................................................................................................_....................................................._..........._._....._........._.....:.................__.._
��-�- � 3 s17 2�3�
......................................................................................................................................................................_�....................................................._........................................................................................_.........................._.._......................................._._...............
Status: In Progress Resident Contacted O
Date Completed: Complete. y:
_r� �
�'��� -
. ,
�
i
t
Vtl
�'`
f
�
. . . . . ��i�.L'..:. .._.
� . City of Fridley
,,,__ ' _ Water Departmen# _ .
_ .. _ . _....._
6431 University Avenue NE
Fridley�MN 55432
(7631572-3566
f/we heceby authorize the tity of Frid�eY and/or�s owne�
empioyees to do what is necessary to replace the water meter. I understand that the prope�fil
is liable for the water line frvm the main to the premise and all interior piumbing. (Per C�ty code
402.06� 1 atso hold the Gty of Fridley and/its employees harmless or any amages a ma�
while doing this operation. This to include,but not limited to;valves►Piping,wails,floors or the curb
stop box and service line. I underttand i am also required to obtain a Pe�mit P�or t°anY W°�'�
necessary.
� O��3 2 �
Final meter reading(old meter� n,�, �,�-�
Name• Address•
�5�' C'-C�r'�S�„�,,.� W�.
Phone Number:
Date• . � ""^"�
Signature.
Witness Signature•
FRIDLEY CITY CUDE
�}i it qp2,WATER,570RM WATER,AND S�►NITARY SEWER
ADMINISTRA'i1�N
(Ref Ord No 113�4b4,565,566,629,638,662,922,988,1144,1156,1191)
4A2.05.PERMIT FEE
Prinr to constructing or repair of any water ar sewer line conne a�o�hall ben equiredtoi bt in a permit for such
or buitding for which the application is made,the owner or contr
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the CitY as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
-�-�-*��••»+p�service curb st�box or the sewer lead at the propert�
��p�..��Lcnanec#inn-hasb�rr��— licant�owner,
line or a water service or sewer lead has been extended to the propertyline for connect►an,the app
or the occupant or user of such premises shall be liable for all repairs required to any wato�Iner reduests r lines
necessary for connection of the premises from the main to the pree is Q��ne 5hall he charged for he costs of the
maintenance service or repairs be performed hy the City,the prop nY
maintenance aod/or repairs, including any necessary street repai�s,at a rate set annually by.an administrative
policy. It shali be the responsibility of the applicant,awner,occupant or user to perform standard maintenance of
� the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
. __ ._ ....._. ..
.__ _ ...
water service curb stop box for operability and at such height as will ensure that it remains above the flnis e
. . � _. . . -..-.
"'grade of�tf�eland or-�rnperiy.-(
Re€63�,-1�5,.t.��►�:j .._
. .:_ _.._. ._. _. ._... __ _.
.._. . .... ._