Meter Swap I 5q�Q5"5u�to� 0
6� � .
, � ��
. �
Request Number: 8952
Public Works Division
Service Request
Problem Address: 179 Christenson Court Requested By: Eu Gene Song
Department: WATER Address: No ad�dress provided
Problem/Issue: INSTALL AMR ME1ER Phone Number: 763-227-0969
Scheduled Date: 2014-09-25 Scheduled Time: 09:00:00
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-23
ACTION TAI�N:
Old meter#98448977 Old reading 090 90 New meter#44922258 ERT#35159676
Status: Completed Resident Contacted ["`
Date Completed: 2014-09-25 Compieted by: Ryan Johnson
Hours
�
�
� ,
Request Number: 8952
. Public Works Division
. Service Request
Problem Address: 179 Christenson Court Requested By: Eu Gene Song
Department: WATER Address: No address provided
Problem/Lcsue: INSTALL AMR 1vIETER Phone Number: 763-227-0969
SchedWed Date: 2014-09-25 � Scheduled Time: 09:00:00
� Y l, - �(r
�-� � `
ACTiON NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-23
ACTION TAI�N:
...........:........................................................................................................................................................................................................................................................................................................._..__..................................................._._........_....____......
_C.�:�......_iv�.�:T�._Q-._.�..........:_�._�._y:_�......`�.._�..._7._�..................................................................._............._......................................................__..................._.___. .
.._��1�..........._�.�:�....'�.....,�=�?_C�..�........�_`�._°�....._6_�_�.........................................................................................._
.........................................................____........._.._.._...__
...D�_....�........�......................��..��_�..#.........................��2_Z 2:.5._g...........................................................................:....._....................................................._._.
..........................:.
DU�cc�..........._��-��_�......_�:...._�
.................................................................................................................................................................__......................._......................_...__._..._._..__.._......._
�P� � 3Sl s ��7�
..........................................................................................................................................................................................................................................:................................._......................................................................................................_........._........__..........
Status: In Progress Resident Contacted ❑
Date Completed: Comp ted b •
,2�,��
.:
:.
t
b .
� . City of Fridley
_ .._ - __ Water Department ._�_.__
_. --_ __ _ _ �.
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
i/we hereby authorize the tity of Fridley and/or its
employees to do what is necessary to replace the water meter. I understand that the propeifil oWner
is 1ia61e for�he water line fromthe main to the premise and all iMerior piumbing. (Per City code
402.d6) I also hold the�ty of Fridley and/its employees harmless or any amages a may�-
while doing this aperation. This to include,but nat limited to;valves,P�p��B.Wails�floors or the curb
stop bax and service line• i under�tand i am also required to obtain a permit p�ior to any work�if
necessary.
. V�����
Final meter reading(old meter) ���
Name•
Address: l 1 1 �! ����/�- �
. Date: �"Z5" 1 `
Phane Number
5ignature•
Witnes.s Signatu :
FRIDLEY CITY CODE
� 02.WATER,STORM WATER,ANO SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,454,565,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line can n acto h hall be requiredto obt n a permit forsuch
or building for which the application is made,the owner or co
connectian,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the Ciry as a
proper and suitable connection.
402.Q6.REPAIRS AND MAINTENANCE TO CONNECTION
��b��� service curh sto box or the sewer lead at the propert�
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shail be liable for aii repairs required to any watowner requests r�ines
necessary for connection of the premises from the main to the premises, if the prop�[ty
maintenance service or repairs 6e performed hy the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set an�uaily by an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or use�to perform standard maintenance of
• the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
.. .. ..-- ...
.__ .
water service cur6 stop box fur operability and at such height as wifl ensure that it remains above the finishe
"'grade of tfi�iand orprop�t�y.�jReF 63�,-11�5,_1.�n�:� ... .
. .. .
�;