Meter Swap 1�11���`'' S�'coc�o
� Request Number: 8944
o�-o�
Public Works Division
Service Request
Problem Address: 185 Christenson Cowt Requested By: Bereket Kidane
Department: WATER Address: No address provided
Problem/issue: INSTALL ANIIt ME'fER Phone Namber: 763-607-5273
Scheduled Date: 2014-09-23 Scheduled Time: 01:00:00
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-22
ACTION TAI�N: � �/
Old meter#36421699 Old reading: 147 40 New meter#Smnt brass body E3tT#35171967
Status: Completed Resident Contacted I!
Date Completed: 2014-09-23 Completed by: Pete Gunderson
Hours
U.1
; .a
— _ _. -- — - . . �.e�:,�y-
�� / ', �
�Y��o
City of y
Water De�artment
Address�'�.5� G'�t�G�S��rSa� �i 1� . _
Name "—_-�''_ �',`�,�,�- -�'``'� !�
Date � ` � ��
Old Meter Number Q�3��d J� l�
Old Meter Reading ��a �� �� -
Replacement No. �'j �C/� / G q 9
Replacement Reading U
Replacement Make^�G(�5��'"�
Remarks• Y // - � �z'/�
�� -�� �..
Signed �
¢
;
r
Request Number: 8944=
Public Works Division
Service Request
Problem Address: 185 Christe�nsen Court Requested By: Bereket Kidane
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 7b3-607-5273
Scheduled Date: 2014-09-23 SchedWed Time: 01:00:00 �
.,�— �
ACTION NEEDED:2014 t�1VIlt-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-22
ACTION TAI�N:
....................................................................................................................................................:.:...........................................................................................................................................................................................................................................................
-
_......��:_;.(..��.-.:�.......�......................`�_��..._�._��......... . ... ..........................._.
�
......._6_.._....t�.�..................................._��1SC��:................................_l._�_�....._�._�C'�......................................................�..` ..............................................._. ._. _._. . ` .
.........��'1�...._,�:��...:......"..�:...............................:........................................................_._.........:..._..................._Sf�}!'�........�����ap..... ......._............._ -
�
_.......�:�.._.�.�v.:.-........................�..............................................................................................................................................................................................._.:..........__..:...................:............:......_......_..__
.......................:...�r�.l....�...z..�...~....rt...�.._�...:..-............................._�....�_��......._��_�`ll..........................................................................................................................._............................_.
Status: InProgress ResidentContacted �
Date Completed: Completed by:
... v( ��
� �� �
` ` - City of Fridley
Water Department
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
��We hereby authorize the�h►�Fryd�eY andJor its
empioyees to do what is necessary to replace the water meter. I understand that the property owner
i�liable for the water line from the main to the premise and all interior plumbing. (Per Gtj►code _ _
402,05) i also hetd the Gty of Fridley andJits employees harmless or any amages ffiat may�oc
while doing this operation. This to include,but not limhed to;valves,pip�n8.walls,floors or the curb
stop box and service line. I understand 1 am also required to obtain a permit Pria�to any work,if
necessary. �� � {�
nal meter readin {otd meter) �
Fi 8 � �
Name: Address• � v� �����
Phone Number: da'te' � " � ��
Signature:
Witness Signature:
FRIDLEY CITY C�DE
Cf1ApTER 402.WA1'ER,STORM WATER,A1�10�►NITARY SEWER
ADMINISTRAT'ION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line con n��o h�all be required o'obta n a perrrid for such
or building for whi�h the apptication is made,the owner or co
connectian,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shail be unlawfui to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and witable connection.
402.06.REPAIRS AND MAtNTENANCE TO CONNECTION
---�-��•�^••��*er service curb stoa box or the sewer lead at the propert�
�f�er-ti�-iqitiat.coAnectinn-bas -
line or a water service ar sewe�lead has been.extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall be(iable for ail repairs requiced ta any watowner redu�r lines
necessary for connection of the premises from the main to the premises. If the prop�[ty 4
maintenance service or repairs be performed hy the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an admin'�strative
policy. tt shafl be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of
the sewer service line from the premises to the main intluding debris clearing or root cutting and to maintain the
. ._ ... ._ __ ... .__ .
water service curh stop box for operability and at such height as will ensure that it remains above the finish
_. . ._ _._
- -.. . _..__..:___... .�.. - --- _ _ _...___ __ . _ ___ _ ._. .. _
~,:graeCe of tt��land or-prop�rty. �Ref 633,-],155,.�193: .._