Loading...
Meter Swap ► ZC�C�25 -5 �f�i20 01-��t����' Request Number: 9003 Public Works Division Service Request Probiem Address: 6416 Christenson Lane Requested By: Jana Anderson Departmeat: WATER Address: No address provided Problem/Issue: INSTALL�Ilt METER Phone Number: 763-502-1588 or 612-210-7892 Scheduled Date: 2014-09-30 Sc6eduled Time: 02:30:00 ACTiON NEEDED:2014 AMR-Phase 2 Created by: Wendy Hiatt Date Created: 2014-09-29 ACTTON TAI�N: Old meter#98160822 Old reading: 66 60 Newmeter#44922266 ERT#35172419 Status: Completed Resident Contacted I"` Date Completed: 2014-09-30 Completed by: Ryan Johnson Honrs Z -l� ( / �� � Request Number: 9003 Public Works Division Service Request Problem Address: 6416 Christenson Lane Requested By: Jana Anderson Department: WATER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 763-502-1588 or 612-210-7892 Scheduled Dat�014-09-30 � Scheduled Time: 02:30:00 , � � � ACTION NEEDED:2014 AMR-Phase 2 ' Created by: Wendy Hiatt Date Created: 2014-09-29 ACTION TAI�N: .........................................................................................................................................................................................................:................................................................................................................:......................................_....................;.........................._ ...._�:.....................�_�_1... _.m��.�Z............................................:.................................................._................................._. _..._._......_..:..............._.._: ...�.....�-r-:�..r� :.. � ..... . ... .... ...._.....__.__....._ o� �����- C��,I� ��C� � .........................................................................................................................................................................................................................................................................................................................................................................................,............._.........._ .._�..�w..........�-�r:�::�._�........_�`�qyZ�Z:.CvCv.......................................................................: : _. 4_ � \��1 Y�+�/ r [ ............�..........................��........._�................................................................................................................................................,..............................................................................._. .......��.--r`..:-._�...,..�:>.s:1...7...z�!.q............................................................................__.........:....................................................................................................................................:....._M___._.............. Status: InProgress ResidenYContacted � , Date Completed: Comple d by: I � l� - t � � ' - City of Fridley __ _ W�ter Department_ _._ .___._ ._ ... _.. �.�_.� 6431 University Avenue NE Fridley,MN 55432 (763)572-3566 ��We hereby authorize the tity of Fridley and/or its employees to do what is necessary to replace the water meter. I understand that the pro�rty owner is liable for the water line from the main to the premise and all interior plumbing. (Per City-code 402.Q6) I aisa hold the Gty of Fridley and/its employees harmless or any amages a may - while doing this operation. This ta inciude,but not limited to;valves,piping,walls,floors or the curb stop box and service line. F understand 1 am also required to obtain a permit prior to any work,ff necessary. Final meter reading(old meter) �`�'�V ` � Name: Address: � 1�`� `�""' � '-' `d� � - Phcne Number: Date: �� ���� Signature• 1Nitness Signat FRIDLEY CITY CODE CHpp 4pZ,WqTER,STORM WATER,AN0514NiTARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.05.PERMIT FEE Prior to constructing or repair of any water or sewer line connecting the existing municipai system and any house or building for which the application is made,the owner ar contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. it shail be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereta has 6een approved by the City as a proper and suitable connection. 402.06.REPAIRS AND MAINTENANCE TO CONNECTION �������5 hpp�rnade to the water service cur6 sta�box or the sewer lead at the propert� line or a water service or sewer iead has been extended to the propertyfine for connectian,the applicant�owner, or the occupant or user of such premises shail be liable for ali�epairs required to any water line and sewer lines necessary for connection af the premises from the main to the premises. if the p�opetty owner requests maintenance senrice or repairs be performed by the City,the property awner shall be charged for the ca5ts of the maintenance and/or repairs, induding any necessary street repairs,at a rate set annuatly by an administrative policy. It shall be the responsihility of the applicant,uwner,occupant or user to perform standard maintenance af • the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished . ..._ _. . "'gracSe df�tf��iand orprop�t�y.-(Re�63$,1�5,t��l� .. .� . . . -