Meter Swap �� u�3��y y�3�o
D � - d� ,°�
Request Number: 9025
Public Works Division
Service Request
Problem Address: 6418 Christenson Lane Requested By: Rosemary Hofstad
Department: WATER Address: No address provided
Problem/issue: INSTAI.L,E11VIIZ METER Phone Number: 574-9414
Sc6eduled Date: 2014-10-01 Scheduled Time: 10:00:OQ
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-30
ACTION TAI�N:
Old meter 3 98448999 Old reading: 36 120 New meter#44922261 ERT#35172488
Status: Completed Resfdent Contacted !""
Date Completed: 2014-10-01 Completed by: Ryan Johnson
Hours
pt� O�
Request Number: 9025
Public Works Division
Service Request
Problem Address: 6418 Christenson Lane Requested By: Rosemary Hofstad ..
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 574-9414
Scheduled Date: 2014-10-01 Scheduled Time: 10:00:00
� �
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-30
ACTION TAI�N:
..............................................................................................................................................................................................................................................................................................................................................................................__...._................_..........
.lJ�..a�.1......�r��.�._�.'L.T..............................`..�,.�.�..._�...._�._�._�........................................................................................................................_...._.._........................_............................._. .
._bL�.....��::.a.��.�_-........................�.3._C�.3...._[....?-0...........................................................................................................................:..............,..........._........................_....__......
_......:....... ...:�......_�-r:�:�.-�:...............�-1_�[....... ...�.-2Z�...:(................................................................................................................................................................................_............._.:._
� �
......��...........�p_�u.�.-�...................................................................................................................................................................................: .
_.....��---�.._�........._3�:�.�1......�-.`�.�.�............................................................................................._.............................................................................:.
......................................................_........................
Status: in Progress Resident Contacted �
Date Completed: Complet by:
JO-�-I�l
� City of Fridiey
_ _ . . . - 1Ma�t��r D�partment
, .._.<., ._.:::._ _
6431 University Avenue NE
F�idley,MN 55432
(763)572-3566
I/we hereby authorize the tity of Fridiey and/ar its
employees to do what is necessary ta replace the water meter. I understand that the property owner
ic liabte for the water line from the maln to the premise and all interior plumbing. (Per City code
402.Q6) i alsa hold the C'rty of Fridley and/its employees harmiess or any amages a may -
while doing this operadon. This tu include,but not limited to;valves►piping,wails,floors or the curb
stop box and service line. 1 understand 1 am also required to ohtain a permit prior to any work„ff
necessary. �
�inai meter reading(old meter) � Y� t ��
Name: Address• �'� ""'" �S � - " � r�
PhoneNumber: Date: r�'/'r /
Signature•
Witness Signature:
FRID4EY CITY CODE
TER 442.WATEtt,STORM WATER,ANO SANITARY SEWER
ADMINISTRA710N
(Ref Ord Na 113,464,565,566,629,638,662,922,988,1144,1156,1191)
4a2.05.PERMIT fEE
Prior to const�ucting or repair of any water ur sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall be required to obtain a permit for such
connection,and shall pay a permit fee as pravided in Chapter 11 of this C�de. After such connectian has been
made,the Water and Sewer Department shall be notified. It shall be unlawFul to cover any connecting line until an
in5pection has been made and such connection and the work inc(dent thereta has 6een approved by the City as a
proper and suitable connectian.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
-Aft�r-thaiaitial coaaectinahas�A�made to the water service cur6 stoa bux or the sewer lead at the propert�
line or a water service�r sewer lead has been extended to the properiyline for eonnectian,the applicant,owner,
or the occupant or user of such premises shall be liable for all�epair�required to any water line and sewer lines
necessary for connection of the premises from the main ta the premises. If the prope[ty owner requests
maintenance service ar repairs be performed hy the City,the property awner shall he charged for the cnsts of the
. maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. It shall be the responsibility of the appfi�ant,owner,occupant or user to perform standard maintenance of
• the sewer service line from the premises to the main inciuding debris clearing or root cutting and to maintain the
water service cur6 stop box for operability and at such height as will ensure that it remains abave the flnished
. .. . . . ._ ._ . .._ .._, . _
„'grai{e of tf��{and or-�rop��y. (A�F 6�8,1�55,_t}n3�� .. .� . . . _ .