Meter Swap i�p�-!U� ���1�C7D
a ����
Request Number: 8998
Public Works Division
Service Request
Problem Address: 6424 Christenson Lane Requested By: Carol Blumberg
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMIt ME'IER Phone Number: 320-894-9314
Scheduled Date: 2014-10-03 Scheduled 1ime: 02:30:00
ACITON NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-29
ACTION TAI�N:
Old meter#98578224 Old readin : 67 70 New meter#44920914 ERT#35159568
Status: Completed Resident Contacted 1�`
Date Completed: 2014-10-03 Completed by: Ryan Johnson
Hours
� ���
,
Request Number: 8998
Public Works Division
Service Request
Problem Address: 6424 Christenson Lane Requested By: Carol Blumberg
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 320-894-9314
Scheduled Date: 2014-10-03 5cheduled'I➢me: 02:30:00
�I' r� �
► '
,
ACTION NEEDED:2014 AMR-Phase 2
Created by: Wendy Hiatt Date Created: 2014-09-29
ACTION TAI�N:
...........................................................................................................................................................................................................................................................................................................................................................................................W..........................
......DG:7�.._���f�._�......................_�._�...:�� S ZZ`�
..... .. .. ..... ..............................................................................................................._.........................................................................._..._.............................._._
.....�7�:J�...........����=...�.�._'.........................d�_�_�......._�...�..._a.............................................................._.........__.._..._..._........................._.
.................._.........................._
.
_...�:..�w......�:.�..,��.�.-.-.:.._���..Z....._e�.��:............................................................................................................................__......................T......._
..ti�.�..�.........._��_��._��..-.... ...............
......................................................................................................................................._.._............_......................................................._..__.................._...............___
........���`.�......._35�5�.."..��..C......�_�...............................................................:.........................................._................................................._...........................__............._.............
Status: In Progress Resident Contacted �
Date Completed: Completed by: �
��-��
�
' - City of Fridley
_ ._.: . VH�ter Departme�t
_. _
__ . ._. ...� �:��.�...
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
i/we hereby authorize the tity af Frid{ey arnl/or its
employees to do what is necessary to replace the water meter. I understand that the property owner
�c liab�for the water fine from the main ta the premise and atl iM�rior plumbing. (Per City code
402.Q6) f aiso hold the City of fridiey and/its emptoyees harmfess ar any amages a may -
whife doing this operation. This ta incfude,but not limited to;valves►piping,wal{s,floors or the cc�rb
stop box and service line. i understand 1 am also required to obtain a Permit Prior t�any work,if
necessary.
Finat meter reading�old met+er) � � �
Name: Address• tl� � �'' � ` �
Phune Number: Date: ! ��J` �
5ignature• v'"
Witness 5ignature•
! FRIDLEY CITY CODE
TER 402.WATER,STORM WA7ER,AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall be required to obtain a permit for 5uch
connectian,and shall pay a permft fee as pruvided in Chapter 11 of this CAde. After such connectlon has been
made,the Water and Sewer Department shall be notified. it shall be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402A6.REPAIRS AND MAiNTENANCE TO CONNECTION
.p�q�p������hPan rnade t�the water service cur6 stoa box or the sewer lead at the propert�
line or a water ser+rice or sewer lead has been extended to the propertyline for connection,tfie applicant,owner,
or the occupant or user of such premises shall be liabie for alf iepairs required to any water{ine and sewer{ines
necessary for connection of the premises from the main to the prernises. if the prope[ty owner requests
maintenance service or repairs be perfarmed by the City,the propecty awner shatt be charged for the c4sts of the
. maintenance and/or repairs, inc{uding any necessary street repairs,at a rate set annuatly by an admin'�traUve
policy. It shail be the responsi6il'+ty af the appltcant,awner,occupant or user to perform standard maintenance of
• the sewer service line from the premises ta the main inctuding debris clearing or root cutting and to maintain the
water service cur6 stop box far ope�abitity and at such height as will ensure that it remains above the finished
.. . . -- . .--- - .
:,,gra�e'of tfie lard or�ro�e��y.�{ReF 635,_�,1�5,.t��3:� _. .- - . . . - -