Meter Swap �aai �- �I� S�Iqo
p I-O"1
�(.,Q t (
Request Number; 8575
Public Works Division
Service Request
........���.............�...._�...._._.........__..�._......_..�...._�.,....w______._...._............�....�.�__�_....._...�_����.....�....��..._..�._......._....
__�..............�....................._.._....__................__��a�_._.__..._�.____.�_�.._.�.__���........��..�._........._. .��_._
Problem Address: 64 Rice Creek Way Requested By: Patricia Bartels
Department: WATER Address: No address provided
Problem/Issue: INSTALLAMRME'IEK PhoneNumber: 763-706-3633
Scheduled Date: 2014-07-29 Scheduled'Iime: 11:00:00
ACITON NEEDED:AMR
Created by: Wendy Hiatt Date Created: 2014-07-23
ACTION TAI�N:
Oldmeter#19090730 Oldreading 751 40 Newmeter#44922074 ERT#35159677
Status: Completed Resident Contacted ('"
Date Completed: 2014-07-29 Completed by: Ryan Johnson
Hours
��
y
Req uest N u m ber: 8575
Public Works Division
Service Request
Problem Address: 64 Rice Creek Way Requested By: Patricia Bartels
Department: WATER Address: No address provided
Problem/Issue: INSTALLAMR METER Phone Number: 763-706-3633
Scheduled Date: 2014-07-29 �� Scheduled Time: 11:00:00
��-�� �
� � � �
��
ACTION NEEDED: AMR
Created by: Wendy Hiatt Date Created: 2014-07-23
ACTION TAKEN:
............................................................................................................................................................................................................................................................................................................................................................:..........................................................
_n L_b....._i'�T�_Q-.._�................._.........I�_�..�...�1.....�.............................................._.
................................_.................._..................................................._..............................._
�
�.t..�........._�_�.:�.r�.�-................_S._�.._� l. �
................._. .
.......... .............................................................................................................._......._.............................................._............ ............................._
.�.�......_�.�..��:....._���..Z..2�....��...�..................................................................................._...............:..............................._.�.:
_ _
.........................
_�:�........_���c�............. .............................................................................................................................................................................................................:...........�.................................._._.
_.......�t��...._�.................�5.�.�..�lC�..�..�.7..............................................................................................................:................................._......_...................................._.................._._
Status: In Progress Resident Contacted ❑
Date Completed: Complet by:
Hours �
i��
� V�
F �
4
__ .. � City of Frldley
. —. Water Department . v ... _
6431 Univer�ity Avenue NE-
Fridley,MN 55432
(763j 572-3566
��we herehv autherite the CJ�j/of FridBy�7hd�0�
employees to do what fs necessary to r�place the water me�r. I understand d�at the property owner
is tiabfe for the water line from the main t�the premise and all interior plumbing. (Per City c�de
40Z.06) I also hoid the Gty of Fridley andJns employees harmless for any dama�ges t�hat may oaur
while dang this aperation. This to include,but not limited to;vaives,pipin,g,walls,floors or d�e curb
stop box and servtce line. i understand 1 am alsv required to airtain a pennit prior to any work,if
necessary.
Final meter reading(oid meter� � �l �, ) 6 �O
Name: Address. `-� \w � �� .
Phone Number: Date• �'� 1��"1
Signature: �'r'�"`'"—'
iNttness Signature•
FR�u�r cmr cooe
C 402.WATER,STORM WATER,AMD SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191j
� � 402.05.PERMIT FEE � � � '
Prior to constructing or repair of any water ar sewer line connecting the existing municipal system and any hous.e
or building fo�which the application is made,the owner or contractor shall be required ta obtain a permit for such
wnnection,and shell pay a perm(t fee as provided in Chapter 11 of thi�Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting li�e until an
inspection has been made and such tonnection and the work incident thereto has been approved by the Ciry as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECi'ION
After the initial connection has been made to the water service a�b stop box or the sewer lead at the property
fine or a water service ar sewer lead has been extended to the property line for connectioo,the appNcant,owner,
or the occupant or user of such premises shalf be liable for all repairs required to arry water line and sewer lines
necessary for connection of the premises firam the main to the premises. 1f the prap�ty owner requests
maintenance service or repal�s be perFormed by the Gty,the property awner shall be charged for the costs of the
maintenanc�and/or repairs, inciuding any necessary street repairs,at a rate set annualiy by an administrative
policy. It shall be the responsibillry of the appiicant,owner,occupant or user to perfarm standard rnaintenance of
' the sewer service tine from the premises to the main including deb�clearing or root cutting and to malntain the
water service curb stop box for operability and at such height as witl ensure that it remains above the flnished
� grade of the land or property. (Ref 638,1156,1191)