Meter Swap /C�7�-���
-o �.�,
D � �j ,,,.
Request Number: 9099
Public Works Division
Service Request
Problem Addressc 227 Sateilite Lane Requested By: Elizabeth Duykers
Department: WATER Address: No address provided
Problem/Issue: INSTALLAMRMETER PhoneNumber: 651-503-2878
Scheduled Date: 2014-10-16 Scheduled'ITime: 08:30:00
AC'rION NEEDED:2014 AMR '
Created by: Wendy Hiatt Date Created: 2014-10-08
ACTION TAI�N:
Old meter#96524707 Old reading 069 90 New meter#44920932 ERT#35111656
............_............................................................................................................................................_........._..._............_............................. ...... ....... ... .
Status: Completed Resident Contacted i"''
Date Completed: 2014-10-16 Completed by: Ryan Johnson
Hours
S3� �
4
� j
Request Number: 9099
Pubfic Works Division
Service Request
Problem Address: 227 Satellite Lane Requested By: Elizabeth Duykers . �..
Department: WATER Address: No address provided
Problemi�ssue: INSTALL AMR METER Phone Number: 651-503-2878
Scheduled Date: 2014,10-16 Scheduled Tfine: 08:30:00
l � � �
�
ACTION NEEDED:2014 AMR
Created by: Wendy Hiatt Date Created: 2014-10-08
ACTION TAI�N:
__...____........_......._....�............................................................................................................................................................................................._........._.................................................__......................____........._............_........................__......_.._........._
, .
�
_.._0�:�..........��-�`::�:�.,�:....-�-........................................_�......�..Z...�_��....�1........................_.......................................................
..............._...__..._....................___...
....._�_Z...�..........2.....�.�-��..��....:..-.:...............�.���._�.`�..�......................................._.____...............___._..........__.........__......_.....:...........__........._........
,
......_�.�-�s...._��.-�--�::............. ....:...... ..._�2::��'3�:.....................................................__.................__......................�_.._..............._....._...__.
- � �
��w �� � �
........�................................................. ................................��......................�:................................................................................................:...................................._._.
.
.......:......:�:���:�..-........._��.1.. .7......._C............_s�.......................................................................................................................................................:......._..............__....._..._.....___......__
Status: In Progress Resident Contacted O
Date Completed: Co lete
1 C�-1C�"1
� ,�.
:�
�
�
t '
�' L
i
- City of Fridtey
Water Department
6431 University Avenue NE
Frid{ey,MN 55432
(763�572-3566
��We hereby authorize the�ty of frid�eli and/or its
employees to do what is necessary to replace the water meter. 1 understand that the property owner
i�liable for the water line from the main to the premise and all interior plumbing. (Per C'ity code _
402.06) I also hoid the City of Fridley and/its employees harmiess for anyaamages a may oc ur
while doing this operation. This ta include,but not timited to;valves,P�P��B.'w►atls,floors ar the curb
stop box and serv+ce line. 1 understand i am also required to obtain a permit prior to any work,if
necessary. ���� i /��
v
Final meter reading(o{d meter► �
Name: j
Address: l��� C�""` `'� ����
Phone Nu r• Date: �"� " ��t G�
5ignature:
Witness Signature:
-0
' FRIDtEY CITY CODE
CH 402.WATER,5T4RM WATER,AND SANITARY SEWER
ADMtNtSTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
40t.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall be requised to obtain a permit for such
cannectio�,and shali pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shali be notified. It shall be unlawful to cover any connecting line untii an
inspection has been made and such connection and the work incident thereto has been approved by the Gty as a
proper and suitable connection.
402.06.REPAfRS AND MAiN7ENANCE TO CONNECTION
���b�Q���p��ac bPPn rnade to the water service curb stop box orthe sewer lead at the propert�
line or a water service or sewer lead has been extended to the property line for tonnectian,the applicant,owner,
or the occupant or user of such premises shail be liable for all repairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the prop�ciy owner requests
maintenance service or repairs be perfiormed by the City,tfie property ownec shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. It shall be the responsibility of the applicant,awner,occupant or user to perform standard maintenance of
the sewer service line from the prernises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
�_. ..._. _.._ _ Re€638,-1.L5,11�3:� .__._ .. _. � _ _. _ ..
_ - . _-,``,-grade'afttre-lartidor-prop�ty.-t __ .._ _.__ __.. _...._ . .___. _ -----.. _ _ ._... ,__