Loading...
Meter Swap �� 9(��v5-5�tc�a�a D � .g�i ; . Request Number: 9066 Public works Division Service Request Problem Address: 231 Satellite Lane Requested By: Elizabeth Catlin Department: WATER Address: No address provided Problem/Issue: INSTALL�IIt MEIER Phone Number: 612-437-7048 Scheduled Date: 2014-10-13 Schedul ed Ti me: 02:30:00 ACTION NEEDED:2014 AMR Created by: Wendy Hiatt Date Created: 2014-10-06 ACTION TAl�N: Old meter#97132389 Old readin 096 30 New meter#44920825 ERT#35172358 Status: Completed Resident Coutacted ("" Date Completed: 2014-10-13 Completed by: Ryan Johnson Hours J��� Request Number: 8947 Public Works Division Service Req�st Problem Address: 231 Satellite Lane Requested By: Elizabeth Catlin Department: WATER Address: No address provided Problem/�ssue: INSTALL AMR METER Phone Number: 612-437-7048 5cheduled Da • 2014-09-25 \;� ,� �duled Time: 02:00:00 Z�� ACTION NEEDED:2014 AMR-Phase 2 t Created by: Wendy Hiatt Date Cr 2014-09-22 � ACTION TAI�N: � \ ; �\ .. �'�/ y{ � � ,J,� ___ V[i�....._i.v�'4.-�..�i..'G:C................................................................................................................................................. ............ ...................... _....... ..................._....................._... ......... ......... .....................__....._ ...�.Z�........_�:�1��.1..�_.�..�....':�................................................................................................................. ..................................:......_._.._....__..... .............__. .................:............____.._...._.___.. ._��:c�......_�...�.�..�..�....................... ..................................................................................................................................... .................._......._ . .............................__.......__.:.......______...___. ..I��c�.S ��--t��t�C� -- � .............................................................................................................................................................................. ..............................................._..........._._. . ........_._.................__._____..._ ��� Status: In Progress Resident Contacted ❑ Date Completed: Completed b �-2�-1� , - City of Fridley Water Department 6431 University Avenue NE Fridiey,MN 55432 (763)572-356fi ��We hereby authorize the�tY af Fridley and/or its empioyees to do what is necessary to replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. (Per C'rty code _ _ _ 402.06) 1 also hold the Gty of Fridley and/its employees harrnless�or an-y aamaBes�at ma� while doing this operation. This to include,but not limited to;valves,piping,wails,floors or the curb stop box and service line. I understand I am also required to obtain a permit prior to any work,ff necessary. Final meter reading(old meter) �� Address• (i ✓ �v"' `i' �l Tl._�--_- " � Name: � Phone Number. Date:��Z��J Signature: Witness Signature• FRIDLEY CIT'Y CUDE CH TER 402.WATER,STORM WATER,ANO SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1155,1191) 402.05.PERMIT FEE Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house or building for which the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shail pay a permit fee as pravided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line untii an inspection has been made and such connection and the work incident thereto has been approved by the Gty as a proper and suitable connection. 402.06.REPAIRS AND MAINTENANCE TO CONNECTION ���b�� er service curb sto box or the sewer lead at the propert� line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner, or the occupant or user af such premises shall be liable for all�epairs required to any water line and sewer lines necessary for connection af the premises from the main to the premises. If the prop��ty owner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative policy. lt shall be the responsibiti�ty of the appticant,owner,occupant or user to perform standard maintenance of • the sewer service line from the premises to the main including debris clearing or root cutting and to rnaintaln the water service curb stop box for operability and at such height as will ensure that it remains above the finished ._ _ . . . . _ __ .. .____.. .__._._..._..,�:grade'of tt►e land arprop�t�y. jRe€63�,-1�5,-�3��:j .__ __. .._. _._._ __._ .--.-- --- � Request Number: 9066 Public Works Division Service Request Problem Address: 231 Satellite Lane Requested By: Elizabeth Catlin -- Department: WATER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 612-437-7048 Scheduled Date: 2014-10-13 SchedWed Time: 02:30:00 I� 3�` � �-` 30 . ACTION NEEDED:2014 AMR Created by: Wendy Hiatt Date Created: 2014-10-06 ACTION TAI�N: ...................................................................................................................................................................................................................................................................................................................................._............................_......._....................._................._ _�La �..r.....�..�.....�.................................�.'I....��.�.._�....._2��_�.....................................................................................................:........_.._............_.._........................................:..._ ....... .................. . . _ � ... .. ..... .. .......... .. .......:.... ..._���.....................�-���.�.-............................. ........ .._�.....�'.:_�..30................................................. ..............................................................___........................................._. _._. . _ .�r�.w........��.�.�:......_��`�...�..........--b.. .....`�..2�........................................................................._..........................................................................._..........._. __.__. ��.l�............Q�.�D�l��..._�� ..... ........................................................................................................................................................................................_.............................................................__---_.__......__.._...._ ......�.�:......�.........___���._...��......��.�..�5...............................:...............................:....:...............................................................__._............................... _. _. : _._. . ............... ....... ......... . ......... Status: in Progress Resident Contacted [� Date Completed: Completed by: ��� ��-c�-c�l . City of Fridley - -- Water Department _ _ . __ . _ _ . �. __ .._._ 6431 University Avenue NE Fridley,MN 55432 (763)572-3566 ��We hereby authorize the�tY�F�d�eY and/or its employees to do what is necessary to replace the water meter. 1 undentand that the property owner :��:�����+r+!�e water line from the main to tfie premise and atl iMerior plumbing. (Per City code 402.06� I aiso hold the Gty of Fridley and/its employees harmless or any amages a may�- white doing this aperatian. This to include,but not limited to;vah►es�p�P1�g,waDs,floors or the curb stop bax and service line. I understand 1 am also required to ohtafn a permit prior to any work,if necessary. � � �� Finai meter reading(old meter� ��� � ���,,j_ �� t�. Name• Address• Phone Number: Date: �._ �("i 5ignature• Witness Signature: FRtDLEY CITY CODE �i R,4p2,Wp7ER,STORM WATER,AND SANITARY SEWER ADMINISTRA770N . (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191j 402.05.PERMiT�EE prior to constructing or repair of any water ar sewer line con n�a�o`��0�e�equired o'obt in a perrn'rt forsuch or building for which the appfication is made,the owner or c connection,and shalt pay a permit fee as pruvided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting iine until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. 402.06.REPAIRS AND MAINTENANCE 70 CONNECTION ��b����b service w�h sto box or the sewer lead at the propert� line or a water service or sewer lead has been extended to the property line far connection,the applicant,owner, or the occupant or user of such premises sha{I be liable for all repairs required to any wate�r 1i�ne`edu�r{ines necessary for connection of the premises from the main to the premises. if the propg�ty q maintenance service or repairs be performed by the Ciry,the property awner shall be charged for the costs of the maintenance and/or repairs, including any necessary street repairs,at a rate set annuafty by an administrative policy. It shali be the responsibifity of the applicant,awner,uccupant or user to perform standard maintenance of • the sewer service line from the premi5es to the main inciuding debris c{earing or�oot cutting and to maintain the water serv{ce curb stop box far aperability and at such height as will ensure that it remai�s above the finishe . .. . .. . . . . _ _ ,,: _ ..---- .__. _ .... ._.... grade'of�tfi�iand or-�roperiy. �Re�€635,_]��S,.t���: ._.. _._ .:_ _.._- -_. _ .. .