Meter Swap �� 9(��v5-5�tc�a�a
D � .g�i ; .
Request Number: 9066
Public works Division
Service Request
Problem Address: 231 Satellite Lane Requested By: Elizabeth Catlin
Department: WATER Address: No address provided
Problem/Issue: INSTALL�IIt MEIER Phone Number: 612-437-7048
Scheduled Date: 2014-10-13 Schedul ed Ti me: 02:30:00
ACTION NEEDED:2014 AMR
Created by: Wendy Hiatt Date Created: 2014-10-06
ACTION TAl�N:
Old meter#97132389 Old readin 096 30 New meter#44920825 ERT#35172358
Status: Completed Resident Coutacted (""
Date Completed: 2014-10-13 Completed by: Ryan Johnson
Hours
J���
Request Number: 8947
Public Works Division
Service Req�st
Problem Address: 231 Satellite Lane Requested By: Elizabeth Catlin
Department: WATER Address: No address provided
Problem/�ssue: INSTALL AMR METER Phone Number: 612-437-7048
5cheduled Da • 2014-09-25 \;� ,� �duled Time: 02:00:00
Z��
ACTION NEEDED:2014 AMR-Phase 2
t
Created by: Wendy Hiatt Date Cr 2014-09-22 �
ACTION TAI�N: � \ ;
�\
..
�'�/ y{ � � ,J,� ___
V[i�....._i.v�'4.-�..�i..'G:C................................................................................................................................................. ............ ...................... _....... ..................._....................._... ......... ......... .....................__....._
...�.Z�........_�:�1��.1..�_.�..�....':�................................................................................................................. ..................................:......_._.._....__..... .............__. .................:............____.._...._.___..
._��:c�......_�...�.�..�..�....................... ..................................................................................................................................... .................._......._ . .............................__.......__.:.......______...___.
..I��c�.S ��--t��t�C� -- �
.............................................................................................................................................................................. ..............................................._..........._._. .
........_._.................__._____..._
���
Status: In Progress Resident Contacted ❑
Date Completed: Completed b
�-2�-1�
,
- City of Fridley
Water Department
6431 University Avenue NE
Fridiey,MN 55432
(763)572-356fi
��We hereby authorize the�tY af Fridley and/or its
empioyees to do what is necessary to replace the water meter. I understand that the property owner
is liable for the water line from the main to the premise and all interior plumbing. (Per C'rty code _ _ _
402.06) 1 also hold the Gty of Fridley and/its employees harrnless�or an-y aamaBes�at ma�
while doing this operation. This to include,but not limited to;valves,piping,wails,floors or the curb
stop box and service line. I understand I am also required to obtain a permit prior to any work,ff
necessary.
Final meter reading(old meter) ��
Address• (i ✓ �v"' `i' �l Tl._�--_- " �
Name: �
Phone Number. Date:��Z��J
Signature:
Witness Signature•
FRIDLEY CIT'Y CUDE
CH TER 402.WATER,STORM WATER,ANO SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1155,1191)
402.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall be required to obtain a permit for such
connection,and shail pay a permit fee as pravided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line untii an
inspection has been made and such connection and the work incident thereto has been approved by the Gty as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE TO CONNECTION
���b�� er service curb sto box or the sewer lead at the propert�
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user af such premises shall be liable for all�epairs required to any water line and sewer lines
necessary for connection af the premises from the main to the premises. If the prop��ty owner requests
maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. lt shall be the responsibiti�ty of the appticant,owner,occupant or user to perform standard maintenance of
• the sewer service line from the premises to the main including debris clearing or root cutting and to rnaintaln the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
._ _ . . . .
_
__ .. .____.. .__._._..._..,�:grade'of tt►e land arprop�t�y. jRe€63�,-1�5,-�3��:j .__ __. .._. _._._ __._ .--.-- ---
�
Request Number: 9066
Public Works Division
Service Request
Problem Address: 231 Satellite Lane Requested By: Elizabeth Catlin --
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 612-437-7048
Scheduled Date: 2014-10-13 SchedWed Time: 02:30:00
I� 3�` � �-` 30 .
ACTION NEEDED:2014 AMR
Created by: Wendy Hiatt Date Created: 2014-10-06
ACTION TAI�N:
...................................................................................................................................................................................................................................................................................................................................._............................_......._....................._................._
_�La �..r.....�..�.....�.................................�.'I....��.�.._�....._2��_�.....................................................................................................:........_.._............_.._........................................:..._
....... ..................
. . _ � ... .. ..... .. .......... .. .......:....
..._���.....................�-���.�.-............................. ........ .._�.....�'.:_�..30.................................................
..............................................................___........................................._. _._. . _
.�r�.w........��.�.�:......_��`�...�..........--b.. .....`�..2�........................................................................._..........................................................................._..........._. __.__.
��.l�............Q�.�D�l��..._��
..... ........................................................................................................................................................................................_.............................................................__---_.__......__.._...._
......�.�:......�.........___���._...��......��.�..�5...............................:...............................:....:...............................................................__._............................... _. _. : _._. .
............... ....... ......... . .........
Status: in Progress Resident Contacted [�
Date Completed: Completed by:
���
��-c�-c�l
. City of Fridley
- -- Water Department _ _
. __ . _ _ . �. __ .._._
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
��We hereby authorize the�tY�F�d�eY and/or its
employees to do what is necessary to replace the water meter. 1 undentand that the property owner
:��:�����+r+!�e water line from the main to tfie premise and atl iMerior plumbing. (Per City code
402.06� I aiso hold the Gty of Fridley and/its employees harmless or any amages a may�-
white doing this aperatian. This to include,but not limited to;vah►es�p�P1�g,waDs,floors or the curb
stop bax and service line. I understand 1 am also required to ohtafn a permit prior to any work,if
necessary. � � ��
Finai meter reading(old meter� ��� � ���,,j_ ��
t�.
Name• Address•
Phone Number:
Date: �._ �("i
5ignature•
Witness Signature:
FRtDLEY CITY CODE
�i R,4p2,Wp7ER,STORM WATER,AND SANITARY SEWER
ADMINISTRA770N .
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191j
402.05.PERMiT�EE
prior to constructing or repair of any water ar sewer line con n�a�o`��0�e�equired o'obt in a perrn'rt forsuch
or building for which the appfication is made,the owner or c
connection,and shalt pay a permit fee as pruvided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting iine until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06.REPAIRS AND MAINTENANCE 70 CONNECTION
��b����b service w�h sto box or the sewer lead at the propert�
line or a water service or sewer lead has been extended to the property line far connection,the applicant,owner,
or the occupant or user of such premises sha{I be liable for all repairs required to any wate�r 1i�ne`edu�r{ines
necessary for connection of the premises from the main to the premises. if the propg�ty q
maintenance service or repairs be performed by the Ciry,the property awner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annuafty by an administrative
policy. It shali be the responsibifity of the applicant,awner,uccupant or user to perform standard maintenance of
• the sewer service line from the premi5es to the main inciuding debris c{earing or�oot cutting and to maintain the
water serv{ce curb stop box far aperability and at such height as will ensure that it remai�s above the finishe
.
.. . .. . . . .
_ _
,,: _ ..---- .__. _ .... ._....
grade'of�tfi�iand or-�roperiy. �Re�€635,_]��S,.t���: ._.. _._ .:_ _.._- -_. _ .. .