Loading...
Meter Swap ! � r '� � f � ,;;; Cr�tl�, Ftidley Request Number: 17658 Pubflc Worlu Dlv�ion Ser�v�ce Reqaeat Psoblem Addras: 6548 University Ave Reqnesied By: Phil W/Horizon M�t. Depa�tment: WA'!ER Addre�: No addraae provicied P�oblem/Issae: INSTALL AMR METER P6oae Number: 763-546-1336 Sc�eduled Date: 2018-02-02 Se�edded'11me: ''�!!'99:�9 (:3p �` h� 1� ACIION NEEDED:AMR § � ;g�� Created by: Wendy Hiatt D�te Cre�ed: 2018-01-31 - ACTION TAI�N: � _.__.____..._.._.._..s.�.l:......(�.��G'.,t ���__�_ ___._[.��� __....____._ __._._..__. _.._.�_._......_. _.___ __.�_.._..._._ _.____.._.�. f � , � _....___.__._....__.__._._._._._�._........... . ___..._._._.____ _..____..._ ._._._. � � ,`��. R St�us: In Progress ���er Has Been r, Coutacted �, Date Completed: 2 � � Com�eted by � � �} ,���� V �. ' s a 1 � �- t,/S�l��� �� City of Fridley �� /,�"7 � Water Department ��� � r�..- �:�431 University Avenue NE ;... �� �ridley,MN 55432 763-572-3566 IJwe hereby authorize the City of Fridley and/or its employees to do what is neassaryto replace the water meter. i understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. (Per City code 402.06) I aiso hold the City of Fridley and�ts employees harmless for any damages that may oca�r while doing this operation. This to include,but not limited to valves,piping,walis,floors or the wrb stop box and service line. In understand 1 am also requi�ed to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter) V � � W � � O Name:�nt� W� 'Nar�izvY. �yM�dress l�/J�V � 1�V��i� r'�r�f � �'T Phone Number . � ✓���,�� Date � r � �' � (7 �� �Signatur ness Signature `"�.- OLD METER# � � v✓ �—1�� � SIZE & STYLE(Circfe) OLD READING �� �� � v � 5/g � NEW METER# '�8`���� �l 3 1" . HEX �'. �+�'�;. ,,�N NEW READING 1�4" ELIPTICAL or HEX ERT# _ �o'�� / V�� 2" ELIPTICAL or HEX FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINfSTRATION (Ref Ord No 113,464,565,566,629,638,6b2,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or building for which the appiication is made,the owner or contractor shall be required to obtain a permit for such aonnection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting{ine until an inspection has been made and such connection and the work incident thereto has been approved by the Crty as a proper and suitab{e connection. 402.06 REPAtRS AND MAtNTENANCE TO CONNECTION After the initial connection has been made to the water service curb stop box or the sewer iead at the property line or a water servke lead has been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shali be iiable for all repairs required to any water line and sewer lines necessary for connection of the premises from the main to tfie premises. ff the property owner requests maintenance service or repairs be performed by the City,the property owner shaN be charged for the costs af the maintenance andjor repairs,including necessary street repairs at a rate set annually by an administrative po{icy. It shall be the responsibility of the appficant, owner,occupant or user to perform standard maintenance of the sewer senrice line from the premises to the main including debris dearing or root cutting and to maintain the water service curb stop box for operability and at such height as wifl ensure that it remairis above the�inished grade of the land or property. (Ref 638,1156,1191) ���_�