Loading...
Meter Swap r�-� 4 Request Number: 14513 Public works Division Service Request Problem Address: 101 Verrtura Ave Requested By: Sel��s Lih Depsrtment: WATER Addreas: No a�ress p�ovided Problem/lssue: INSTALL AMR METER P6one Number: 651-208-4645 Scheduled Date: 2017-04-10 Schednled'Rme: 07:30:00 �nu� �` I 1 -r ,30 ACITON NEEDED: �' ��,�., , Created by: Beth Kondrick Dnte Created: 2017-04-04 �:::. �ACTION TAI�N: �;�� � �-r�►�5f�-�� �eo� �� � � _ , � ...._..._..__.___.__...._ _..............._.. _.____.___._..._ - __ - ��. 5ubmitter Hae Been � ,� Statua:" In Progress Contncted r Date Completed: �.� tv^L� Completed by: �aL � � t'" > �. I�� - �s�� ���'��� So � � ��3 City of Fridley Water Department 6431 University Avenue NE Fridley,MN 55432 763-572-3566 �/We hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and ail iMerior piumbing. (Per City code 402.06) 1 also hold the City of Fridley and/its employees harmless for arry damages Lhat may�r while doing this operation. This to include,but not limited to valves,piping,walls,floors or the curb stop box and service line. In understand 1 am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter) � �� ��� Name• ��' ���� � Address t�t ��1Y�`�...- i�l/u Phone Number ������U ^��� Date 1� ��v— �� ,.�� Signature Witness Signature OLD METER# � ��J OLD READING 1 ✓� � �o NEW METER# I I ����� `� NEW READING � ERT# �P'�� � I�� FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or buildi�for which the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permR fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any wnnecting line until an inspectio�has been made and such connection and the work incident thereto has been approved by the City as a � proper and suitable wnnection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service airb stop box or the sewer lead at the property line or a water seroice lead has been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shall be liable for all repairs required to a�y water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests maintenance senrice or repairs be performed by the City,the property owner shail be charged for the costs of the maiMenance and/or repairs,including necessary street repairs at a rate set annually by an administrative poliry. It shall be the responsibility of the appiicaM, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris dearing or root cutting and to maintain the water service curb stop box for operability and at such height as wili ensure that it remains above the�nished grade of the land or property. (Ref 638,1156,1191)