Loading...
Meter Swap � � Request Number: 16123 Public works Division Service Request Problem Address: 6731 4th St Requested By: Asheley Department: WA1ER Address: No address provid�d Problem/issue: INSTALI.AMR METER Phone Number: 952-454-1652 Schedule� nte: 017-07-O5t��{ 5cheduledl3me: 08:00:00 J� ACTION NEEDED: Created by: Wendy Hiatt Date Created: 201'7-06-?3 ACTION T.AI�N: ..........................�.�.....�q..���........necni.._.���_._.._.._.._...._.._..._._......................_......__�......_....._.__._._.._�......�..._._._.. Status: In Progess Submitter Has Been r Contacted Date Completed: Completed by: ��� ��„` Hours ���,t� � ��lf ��3�� -��� �� � ,; � City of Fridley ��� ���� - Water Department 6431 University Avenue NE Fridley,MN 55432 763-572-3566 ��We - he�eby authorize the City of Fridley and/or its employees to do what is necessary to replace the water mete . f understand that the property owner is liable for the water line from the main to the premise and afl ir�terior plumbing. (Per C'ity code 402.06) 1 also hold the City of Fridley and/its employees harmless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,wails,floors or the curb stop box and seroice li�e. In understand i am also required to obtain a permit prior to arry work,if necessary. FINAL METER READING(old meterj C?l� i V l O Name: Address tG>�� � �� S�- Phone Number Date Signature Witness Signature t3LD METER# I�OZ_Z�Z-q( OLD READING ���J�O ---- --- NEW METER# �III Ib�IiM� alilaNlN I�II� �4��226055 � � NEW READfNG — C� '.^'_ _ __ __ . , ERT#.� IIIIIIIIIIIII{IIIIiIII E ' 11 72356644 FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMIMISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or�epair of any water of sewer line connecting the existing municipal system and arty house or building for which the application is made,the owner or coatrador shall be required to obtain a permit for such connection,and sha{I pay a permR fee as p�ovided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmeot shall be not�ed. it shall be unlawful to crnrer any connecting line untit an inspection has been made and such connection and the work incident thereto has been approved by the C"rty as a proper and suitable connedion. �02.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initiai connection has been made to the water service curb stop box er the sewer lead at the property line or a water senrice tead has been extended to the property line for connection,the appficant,owner,or occupant or user of wch premises shall he liable for alt repairs required to any water tine and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests maintenance service or repairs be performed by the City,the properly owner shail be charged for the costs of the mairrtenaoce and/or repairs.inciuding necessary stseet repairs at a rate set annually by an administrative poliry. It shatl be the responsi6itity of the app{icarrt, owner,occuparrt or user to perForm standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to mairitain the water senrice curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. {Ref 638,1156,1191)