Loading...
Meter Swap � � Request Number: 14617 Public Works Division Service Request Problem Address: 5360 Sth St Requested By: Michael Anderson Department: WATER Address: 5360 Sth 5t Fridley,MN 55432 Problem/Issue: INSTALL AMR METER Phone Number: Scheduled Date: 2017-04-18 Scheduled 1�ime: 10:30:00 ��l�s , � � 8 : 3D ACTION NEEDED: Created by: Beth Kondrick Date Created: 2017-04-10 ' ' ACTION TAI�N: � _:; F��1�, �� � ................................................................................_....._...........................:........______........_........................................_........_._......_.._...................................._....._.__.......................__..........._.._..____................................_.._............................_... ....................................._................................................_....................._............................................................................_._.._................_................................._..................._.....:.........._................................�_.........._..................._....._.�.........__._... Status: In Progress Snbmitter Has Been � Contacted Date Completed: Completed byc �I- l�- l`� T (0� � . . . n{ - ���l �-}�l0 �'� I � City of Fridley �� ���) Water Department 6431 University Avenue NE Fridley,MN 55432 763-572-3566 I/we hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liabie for the water line from the main to the premise and all iMerior piumbing. (Per City cade 402.06) I also hold tfie City ofi Fridley and/"Ks employees harmless for any damages that may oaur while doing this operation. This to include,but not limited to vahres,qiping,wat4s,floors or the wrb stop box and service line. In understand 1 am aiso required to obtain a permit prior to any work,if necessary. FINAL METER READIN6(old meter) � � I � � g 4 Neme: ��L\� ���� Address � J�� �� � ` Phone Number Date ���� `� Signature Witness Signature OLD METER# � �D �1 � �1 Z� OLD READING � � � � ��� NEW METER# r��� "'�� NEW READING ERT# � ��� � � �� FEtIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINlSTRATION �� (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191j 402.5 PERMIT FEE Prior to constructing or repair of any water af sewer line connecting the existing municipal system and any house or building for whid�the application is made,the owner or wntractor shall be required to obtain a permit for such connection,and shali pay a permit fee as provided in Chapter 11 of this Code. After such connection fias been made,the Water and Sewer Department shall be notified. it shall be unlawful to cover any wnneding line until an inspection has been made and such connection and the work incident thereto has been approved by the C'rty as a proper and suitable connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service wrb stop box or the sewer lead at the property line or a water service lead has been extended to the property line for connection,the appliczr�t,owner,or ocwpant or user of wch premises sfiall be liabie for all repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. ff the property�rner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenanc�and/or repairs,including necessary street repairs at a rate set annually by an administrative poliry. It shall be the responsibility aF the appllcant, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main includir�debris dearing or root cutting and to maintain the water service curb stop box fur operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)