Meter Swap �
, Request Number: 13483
Public Works Division
Service Request
Problem Address: 1570 60th A�e Reqaested By: William Mathis
Depxrtmeat: WATER Addresa: No address provided
Problem/Issue: INSTALL AMR MET'ER Pho�Number: 612-245-1156
Schedaled e• ZOi'1-02-22 � Schedeledltn�: 08:30:00
Z�` ,�
ACITON NEEDED:
Created by: Wendy Hi�t Date Created: 2017-02-1 S
AC'IION TAI�N:
������ � M
Status: In Progress �ubmiitter Ii�Bee� �,
Coatacted
Date Completed: Completed by:
�- Zti- l� T �or
�
_�
------- --r�... �
6431 l9naversity s�ven�ae NE �, � � / �-
Fridleya N!N 554,32
� 753-572-3566 �
�t� �-yl�� � ��� -� �-
' �/w� herehy authorize xhe City a�f Fridley andJor its empioyess to slo what is necessary 40
replace#he water meter. 1 understand[hat�he properLy owner is liable for the water line from the main to the premise and all irrterior
pturrabing. (Per C"rty code 4Q2.06j i also hold the C'�ty of Fridley and/9ts employees harmless for eny damages that may occur while doing fihis
o�eration. This�0 6nclude,but not limi#ed 3o valves,piping,watis,floors or the curb stop hox and service line. In understand!am also requir
to obtain a permit prior to any rvork,�f necessary.
FINAL METER READING(old meter) � � O� ���
lllame: Y v � ��`G'+� �� V� Address�� l..> �� t'���
Phone Number �/ �7i � V L��J Date l������
Signature � Wiiness Signature
OLDMET�R#�Z--� �� �
OLD RfADtNG �, � � �
NEW METER# I V�O �� �$
NEW REAat4NG�
�RT# �t ��'L� � 30 �
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANiTARY SEWER
ADMIN ISTRATION
(Ref Ord No 113,464,565,566,629,638,562,922,988,1144,I156,1191)
402.5 PEKMti'FEE
Prior to constructing or repair of any water aF sewer line wnnecting the euisting muniapa(sys#em and arry house or buiidi�for which the
application is made,the owner or contractor shalt be required to obtain a permit for such connection,and shaU pay a permitfee ag prrnrided in•
Chapter 11 of this Code. After such connection has 3�een made,the Water and Sewer Department shall be notified. tt shall be untawful to cove
any connecting line ur�til an inspection has 6een made and such connection and the work inaderrt thereto has been approved by the CFty as a
proper and suitabte connection.
402.06 REPAiRS AND MAINTENANCE TO CONNECI'ION
After the tnit�al connecfiion has been made to the water service curb stop box or the sewer lead at the property line or a waCer servic�e lead has
been extended#o the property line for connection,the applicarrt,owner,or accuparrt or user of such premises shall be!fal�e for all repairs
required fio ar�y water line and sewer lines necessary#vr connection of the premises from the main to the premises. tf the property owner
requests mairrtenance service or repairs be perFormed by the C'rty,the property owner shal)be charged for the tosts o�ffie mairttenance and/or
repairs,including necessary street repa�r��a��annualfy by an administrative poliry. It shafl be the responsbii'rty of the applicarrt,
owner,occuparrt or user to perform standard mairrtenance of t6e sewer service line from#he premises to the main indudi�debris clearing or
root cutting and to mair�tain the water service curb sfiop box for operability and at such heigFrt as wiit ensure that it remair�above the finished
grade of#he land or property. (Ref 638,1156,1191)