Loading...
Meter Swap r, �< Request Number: 16489 � Public Works Division Service Request Problem Address: 156s61 st A� Requested By: Corey McKusick Departmeat: WATER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 763-443-6246 Scheduled Date: 2017-0 -01 Scheduled'ilme: 11:30:00 S'T- 1 ACIYON NEEDED: Created by: Wendy Hiatt Date Created: 2017-07-27 ACTT N TAI�N: ".._�!���..�........_._.__.._� �'.�V�`......._._....�......�..__._. _...�......._.._.._............._.._._.w. .._._.._ Status: In Progress Submitter IIas Been r Contacted. Date Completed: mpleted by: �� ` � I � �� {�r� � �� � ����o�� �� �'�������ey � ihfater�epartev�ent S� � � ��� i.� �'�' fi43�l9naversity Aerencae 4VE Frid9ey,MIV 55432 7f 3-572-3556 IJwe hereby authorize the City of�ridtey and/or its employees to da what is necessary to replace the water mefier. t understand that the property owner is liable for the water line from the main to the premise and all 9nterior plumbing. (Per�C'�ty code 402.06) I also hold the Crty af Fridiey and/its employees harmless#or arry damages that may oepar while doing this operation. This to include,but not limited to valves,piping,walls,#loors or the turb stop boz and service li�e. in understand i am also require fio obtain a perrnit prior to any wor[c,if necessary. FINAL METER READIAtG{c(d meter} �� �C�� ��ic i ���' ��5� P�v�- Name• Ac{dress_ Phone Number� " � 4�� � "+ "� �� y;Signature � Witness Signature _ ����� OLD lVIETER#�,��� ��l� OLD R�D�NG O°12�t�� NEW METER#_ �_ 1 ��� 1 � I IVEW READItVG \,J E�T# �.2� 1 ��°I°� FRtDLEY CITY CODE CHAPTER 402.WATER,STORIV!WATER AND SANITARY SEWER ADMlNISTRAT{ON ��tef Ord No 113,464,565,566,629,638,662,922,988, 1144,1156,1191) 402.5 PERMIT FEE � Prior to constructing or repaic of any water of sewer line connecting the existing muniapal system and arry house ar bui(dirig for which the appticatian is made,the awner or contractor shail be required to obtain a permit for such wn�ection,and shali pay e permit fee as provided in Chapter 11 of this Code. After such co�nection has been made,the Water and Sewer Department shall be notified, it shal!be unlawful to wver any connecting line until an inspection has been made and such connection and the work irtciderrt thereto has been approved by the City as a proper and suitable connedion. �02.06 REPAIRS AND MAINTEfVANCE TO COPlNECTION After the initial connection has been rnade to the water service curt�sCop box or tF�e sewer lead at the property line or a water seroice iead has been extended to fihe property line for connection,the applicarrt,owner,or occuparrt ar user of such premises shall ae iiable for ait repairs required to any water tine and sewer lines necessary#or connection of the p�emises from the main to the premises. If the property owner requests mairnenance service or repairs be performed by the City,the property owner shall be charged for the costs af the mair�tenance and/o� repairs,including necessary street repairs at a rate set annualty by an administrative policy. It shali 6e the responsibility of the applicarrt, owner,occupant ar user to perform standard maintenance of the sewer service line from the premises to the main induding debris clearing or root sutting end to maintain the water service curb stop box for operability and at such height as wiil ensure that it remains abode fihe finished grade of the tand or property. (Ref 638,1155,1191j ,� ; ; ; Ciy oj Fridley Request Number: 17591 Public Worics I�ivision Service Request Problem Address: 1565 61 st Ave Requested By: Corey McKusick Depart�nent: WATER Address: No address provided Proble�/Issne: MEIER Phone Namber: 763-443-6246 Scbedule Date: 2018-01-19 � Sc6ednladllme: 01:00:00 AwC!'ION NEEDED:AMR ia installed beckwirdc. Created by: Wendy Hiatt Date Created: 2018-01-18 ACIION T.,I�N: �t,5�-�,���G� Y�`e c�.> 1'�'t�e�� �. ., G� w�.�_..._ �. . C,�rr�e._______ _.._....__.._._...___ � _.____..___ = � Y �� 4 C � , �••y;. .. ���.�.��.�.�µ.�.�� ��.�.�...�µ..��.�.���� .�.�.���....�.��.W�.w� �.�.� �.�� Status: In Pro�ess �bmitter Haa Been r Contacted , Date Completed: ��, I�r � Q Completed by: � �� 0 ; Hiatt, llVendy Subject: Corey McKusick 763-443-6246 AMR installed backwards please turn correct direction Location: 1565 61st Ave N E Start: Fri 1/19/20181:00 PM End: Fri 1/19/20181:30 PM Show Time As: Tentative Recurrence: (none) Meeting Status: Not yet responded Organizer: Hara, Sandra Required Attendees: Hiatt,Wendy � �� �r1 � 3 . City of Fridley ���'��(Q����j Water Department 6431 University Avenue NE Fridley,MN 55432 763-572-3566 I/we hereby authorize the Ciq of Fridley and/or its employees to do what is necessary to reqlace the water meter, l understand that the property owner is tiable for the water line from the main to the premise and all irrterior plumbing. (Per City code 402.06) I also hold the C'ity of Fridley and/its employees harmless for any damages that may occur while doing this operation. This to inciude,but not limited to valves,piping,walls,floors or the curb stop box and service line. In understand I am also required to obtain a permit prior to any work,if necessary. ,,,�` �N,���� D�k'i��� " , �"�lLc�e�u/�+� , ��' �''��27. � FINAL METER READING(old meter) r� � .L1�� Name: �"`L F-'�5 ��/� Address � ✓ ll/ � `y � � � PhoneNumber � d ' ��J '� ����Date �� � ! � � V �/'Signature Witness Signature `�' 1R*��s � aG� �►'`� ��(�J�g� OLD METER# �� � �� G � 512E & STYLE(Circlei 1 �. �.�-- �' �v,�s�� OLD READING "�—"-- ' G�<�� EX NEW METER# i�� 1�� ! l � I 1" HEX ���� � � , ,. �hN� ,�a�. � NEW READING 1� ELIPTICAL or HEX �- ERT# L � V o�v I�D / 2" ELIPTICAL or HEX FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water uf sewer line connecting the existing municipal system and any house or beitding for whkh the application is made,the owner or wntractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an inspection has been made and wch connection and the work incident thereto has been approved by the C'ity as a proper and suitable connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shall be liable for all repairs required to any water line and sewer tines necessary for connection of the premises from the maia to the premises. ff the property ow�er requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibility of the applica�, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the wate�service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)