Meter Swap r, �< Request Number: 16489
�
Public Works Division
Service Request
Problem Address: 156s61 st A� Requested By: Corey McKusick
Departmeat: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 763-443-6246
Scheduled Date: 2017-0 -01 Scheduled'ilme: 11:30:00
S'T- 1
ACIYON NEEDED:
Created by: Wendy Hiatt Date Created: 2017-07-27
ACTT N TAI�N:
".._�!���..�........_._.__.._� �'.�V�`......._._....�......�..__._. _...�......._.._.._............._.._._.w. .._._.._
Status: In Progress Submitter IIas Been r
Contacted.
Date Completed: mpleted by:
�� ` � I � �� {�r�
�
�� � ����o�� ��
�'�������ey �
ihfater�epartev�ent S� � � ���
i.� �'�' fi43�l9naversity Aerencae 4VE
Frid9ey,MIV 55432
7f 3-572-3556
IJwe hereby authorize the City of�ridtey and/or its employees to da what is necessary to
replace the water mefier. t understand that the property owner is liable for the water line from the main to the premise and all 9nterior
plumbing. (Per�C'�ty code 402.06) I also hold the Crty af Fridiey and/its employees harmless#or arry damages that may oepar while doing this
operation. This to include,but not limited to valves,piping,walls,#loors or the turb stop boz and service li�e. in understand i am also require
fio obtain a perrnit prior to any wor[c,if necessary.
FINAL METER READIAtG{c(d meter} �� �C��
��ic i ���' ��5� P�v�-
Name• Ac{dress_
Phone Number� " � 4�� � "+ "� ��
y;Signature �
Witness Signature _
�����
OLD lVIETER#�,��� ��l�
OLD R�D�NG O°12�t��
NEW METER#_ �_ 1 ��� 1 � I
IVEW READItVG \,J
E�T# �.2� 1 ��°I°�
FRtDLEY CITY CODE
CHAPTER 402.WATER,STORIV!WATER AND SANITARY SEWER
ADMlNISTRAT{ON
��tef Ord No 113,464,565,566,629,638,662,922,988, 1144,1156,1191)
402.5 PERMIT FEE
� Prior to constructing or repaic of any water of sewer line connecting the existing muniapal system and arry house ar bui(dirig for which the
appticatian is made,the awner or contractor shail be required to obtain a permit for such wn�ection,and shali pay e permit fee as provided in
Chapter 11 of this Code. After such co�nection has been made,the Water and Sewer Department shall be notified, it shal!be unlawful to wver
any connecting line until an inspection has been made and such connection and the work irtciderrt thereto has been approved by the City as a
proper and suitable connedion.
�02.06 REPAIRS AND MAINTEfVANCE TO COPlNECTION
After the initial connection has been rnade to the water service curt�sCop box or tF�e sewer lead at the property line or a water seroice iead has
been extended to fihe property line for connection,the applicarrt,owner,or occuparrt ar user of such premises shall ae iiable for ait repairs
required to any water tine and sewer lines necessary#or connection of the p�emises from the main to the premises. If the property owner
requests mairnenance service or repairs be performed by the City,the property owner shall be charged for the costs af the mair�tenance and/o�
repairs,including necessary street repairs at a rate set annualty by an administrative policy. It shali 6e the responsibility of the applicarrt,
owner,occupant ar user to perform standard maintenance of the sewer service line from the premises to the main induding debris clearing or
root sutting end to maintain the water service curb stop box for operability and at such height as wiil ensure that it remains abode fihe finished
grade of the tand or property. (Ref 638,1155,1191j
,�
; ;
; Ciy oj
Fridley
Request Number: 17591
Public Worics I�ivision
Service Request
Problem Address: 1565 61 st Ave Requested By: Corey McKusick
Depart�nent: WATER Address: No address provided
Proble�/Issne: MEIER Phone Namber: 763-443-6246
Scbedule Date: 2018-01-19 � Sc6ednladllme: 01:00:00
AwC!'ION NEEDED:AMR ia installed beckwirdc.
Created by: Wendy Hiatt Date Created: 2018-01-18
ACIION T.,I�N:
�t,5�-�,���G� Y�`e c�.> 1'�'t�e��
�. .,
G� w�.�_..._ �.
. C,�rr�e._______ _.._....__.._._...___ � _.____..___ = �
Y �� 4
C
� , �••y;. ..
���.�.��.�.�µ.�.�� ��.�.�...�µ..��.�.���� .�.�.���....�.��.W�.w� �.�.� �.��
Status: In Pro�ess �bmitter Haa Been r
Contacted ,
Date Completed: ��, I�r � Q Completed by: � ��
0
;
Hiatt, llVendy
Subject: Corey McKusick 763-443-6246 AMR installed backwards please turn correct direction
Location: 1565 61st Ave N E
Start: Fri 1/19/20181:00 PM
End: Fri 1/19/20181:30 PM
Show Time As: Tentative
Recurrence: (none)
Meeting Status: Not yet responded
Organizer: Hara, Sandra
Required Attendees: Hiatt,Wendy
�
�� �r1 � 3
.
City of Fridley ���'��(Q����j
Water Department
6431 University Avenue NE
Fridley,MN 55432
763-572-3566
I/we hereby authorize the Ciq of Fridley and/or its employees to do what is necessary to
reqlace the water meter, l understand that the property owner is tiable for the water line from the main to the premise and all irrterior
plumbing. (Per City code 402.06) I also hold the C'ity of Fridley and/its employees harmless for any damages that may occur while doing this
operation. This to inciude,but not limited to valves,piping,walls,floors or the curb stop box and service line. In understand I am also required
to obtain a permit prior to any work,if necessary. ,,,�`
�N,���� D�k'i��� " , �"�lLc�e�u/�+�
, ��' �''��27. �
FINAL METER READING(old meter) r� � .L1��
Name: �"`L F-'�5 ��/� Address � ✓ ll/ � `y � � �
PhoneNumber � d ' ��J '� ����Date �� � ! � � V
�/'Signature Witness Signature `�'
1R*��s
� aG� �►'`� ��(�J�g�
OLD METER# �� � �� G � 512E & STYLE(Circlei
1 �. �.�-- �' �v,�s��
OLD READING "�—"-- ' G�<�� EX
NEW METER# i�� 1�� ! l � I 1" HEX ���� �
� , ,. �hN� ,�a�. �
NEW READING 1� ELIPTICAL or HEX �-
ERT# L � V o�v I�D / 2" ELIPTICAL or HEX
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.5 PERMIT FEE
Prior to constructing or repair of any water uf sewer line connecting the existing municipal system and any house or beitding for whkh the
application is made,the owner or wntractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover
any connecting line until an inspection has been made and wch connection and the work incident thereto has been approved by the C'ity as a
proper and suitable connection.
402.06 REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has
been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shall be liable for all repairs
required to any water line and sewer tines necessary for connection of the premises from the maia to the premises. ff the property ow�er
requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or
repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibility of the applica�,
owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or
root cutting and to maintain the wate�service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)