Meter Swap 3
� Request Number: 16323
Public Works Division
Service Request
Problem Address: 573 Bennett Dr Requested By: MatthewMarcus
Department: WA1ER Address: No address provi�d
Problem/�asue: INSTALL AMR METER Phone Number: 651-331-8839
Scheduled D�te: 2017-07-19 Scheduled 1lme: 10:30:00
�i'� Iv.
ACITON NEEDED:
: Created by: Beth Komirick Date Created: 2017-07-13
#
ACTYON TAi�N: �
��s�,�t�,
5t�tns: In Prog�ess Submitter Has Been f..
Contsicted
Date Completed: �... �� ,�, r�"J � Completed by: J�k,,,
! �
1���.� ��O 1�l� ��Ot� �
� City�#Fridley � ��� - !
� Water Departrnent ��
6431 University Avenue NE
Fridley,MN 55432
753-572-3566
��`A/e hereby authorize the City of Fridtey and/or its empfoyees to do what is necessary to
replace the water meter. i understand that the property owner is liable for the water line from the main to the premise and al!tnterior
plumbing. (Per City code 402.06) 4 also hold the City ofi Fridfey and/its employees harmless for any damages that may occur while doing this
operation. This to inciude,but not limited to va(ves,piping,walis,floors or the curb stop box and service line. In understand 1 am aiso required
to obtain a permit prior to any work,if necessary.
FINAL METER READIIVG(o1d meter) � V � �
Name• r""�•1�`��1+�/ �(i� Adds�ess n o
Phone Number u��) " 3 3�� �V 3� pate _ / ~ � 1"� ��
�Signature �iTirt YV'�tness Signature "`�
OLD METER# �� ` 1 �e��-(
OLD READING _ � ! �V � � b
NEW METER# � 1��S�� �
NEW READING �
ERT# � ��� � � � 1
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER A1dD SANITARY SEWER
ADMINISCRAT{ON
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.5 PERMIT FEE
Prior to constructing or repair of any water of sewer line connecting the existing municipaf system and any house or buifding for which the
application is made,the owner os contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of thss Code. After such co�necCion has been made,the Water a�d Searer Qepartrnent shalt be notif'red. it shalt be unlawFui to wver
any connecting line untit an inspection has been made and sucb connection and the wortc incident thereto has been approved by the City as� .
proper and suitahle connection.
402.06 REPAIRS APID MAINTENANCE TO COPlNEC1701Y
Afte�the initia!connection has been made to the water service curb stop box or the sewer lead at the property line or a water service iead has
been extended fio the property line for connection,the applicant,ows►er,ur occuparn or user aF such premises shall be liable for all repairs
required to any water line and sewer lines necessary#or connection of the premises from the main to the premises. tf the property owner
�equests maintenance service or repairs be performed by the City,the property vwner shall be charged for the costs of the maintenance andJor
repairs,inciuding necessary street repairs at a rate set annually by an administrative policy. it shali be the responsibility of the applicant,
owner,occupant or user to perform standard maintenance of tfie sewer service line from the premises to the main including debris clearing or
root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remairis above the finished
�rade of the land or properly. (Ref 638,1156,11911