Loading...
Meter Swap � Request Number: 14943 �Public Works Division Service Request Problem Address: 1517 Berne Circle Requested By: Robert Saba Department: WATER Address: No a�ress provi�d ProblemlLasue: INSTALL AMR METER Phone Number: 763-286-6689 � Schedaled Date: 201?-04-27 Sc6edaled 11me: 07:30:00 � n `'� ;3� ACIION NEEDED: Created by: Beth Kondrick Date Created: 2017-04-25 � ' � ACTION TAI�N: �� � �-S�.G 6 �� Status: In Progress Sabmitter Has Bee�i � Coatacted D�te Completed: � �� �� Completed by: � `, � r v �,�" s .... � P} � � � � ,{ � . _ .:�, :�� . . . � .��, .4' . . .. . �.l�' . � . . . �D�- ��o �`7a-�� f City of Fridley �� ✓�� � Water Department 6431 University Avenue NE Fridley,MN 55432 763-572-3566 1/we hereby authorize the City af Fridley and/or its employees to do what is necessary to replace the water meter. i understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. {Per City code 402.06) i also hold the City of Fridley andrts employees harmless for any damages that may oaur while dotng this operation. Tfiis to inciude,but not limited to valves,piping,walis,floors or the curb stop box and senrice line. In understas�d{am also required to obtain a permit prior to any work,if necessary. FINAL MET�R READING(o{d meter) � � ! �� ` � Name: _ ���T J�=Y� Address ��l [ �"' i� �(�`�J�'�. Phone Number ��� �cNf� `f��� Date �r � t `"'� �� Signature Witness Signature OLDMETER#_ ��`��✓��w OLD READfNG � l� l C� NEW METER# �� `� ��� � NEW READING � ERr# �a'�a-�J��� FRIOLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,92Z,988,1144,1156,1191� 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer ilne connecting the extsting municipal system and any house or butlding for which the appliption is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made.the Water and Sewer Departmer►t shali be notified. tt shail be unlawful to cover any connecting line until an inspedion has been made and wch connection and the work incident thereto has been approved by the Cty as a proper and suitable connection. 4fl2.06 REPAfRS AND MAINTENANCE TO CONNECTION After the initiai connection has been made to the water service turb stop box or the sewe�lead at the property line or a water service lead has been extended to the property line for connection,the appticant,owner,or occupant or user of such premises shall be liabie for ail repairs required to any water line and sewer li�es necessary fos connection of tfie premises from the main to the premises. If the property owner requests maicrtenance service or repairs be performed by the City,ihe property owner shall be charged for the costs of the maintenance and/or repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibility of the applicaM, owner,occupant or user to perform standard maiMenance of the sewer service line from the premises to the main induding debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as wili ensure tfiat it remains above the finished grade of the land or property. (Ref 638,1156,1191) � f