Meter Swap �
� Request Number: 16403
Public Works Division
Service Request
Problem Address: 6501 Fridley St Requested By: Sean
Department: WATER Address: No address provi�d
Problem/fsaue: INSTALL AMR METER Phone Number: 612-978-1032
It/j�, �
ScheduledDate:�,/(,�`Y �T Scheduledl3me: ��.3�
� r
�
ACIYON NEEDED:
Created by: Beth Kondrick Date Created: 2017-07-19
A ON TAI�N:
...............��-��,...�........._._.__���'�-......._........__..__..._�_________..__.__.__.___..._�.._ .___
Status: In Progress Submitter Has Been r
Contacted
Date Completed: Completed by:
� ��✓� ' �
�
:�`:
� �i�y��Fridley ����� �7�'7�'.�
' W�tet-De�artrrv�ent j}f� /y�
� 6431 l�nev�rsity Aveneae NE �"'r/ �l v �
Fridley,MN 55432
763-532-3566
'/`"�� hereby authorize the�ty of Fridtey and/or its employees to da+�rhat is necessary to
rep(ace the arater meter. 1 understand that the property owner is liable for the rvater line from the main to the premise and all anterior
piumbing. (Per C'rty code 402.06) 1 also hold the City of Fridley and/its employees harmless for arry damages that may occur while doing this
operation. This to include,but not limited to valves,pipin�walis,floors or the curb stop box and service line. in understand 1 am aiso require
to obtain a permit praor to any work,if necessary.
FINAL METER READING(otd meter) � `�
� �� � �
Name• pddress
Phone Numbe� V�� `�� i� p� �,1��"{,'�`�
�S'g� Witness Signature
o�D M�-�R# ��O�l 2bb ��
o�D ��D��G Z��1�(��O
NEW MEI'ER# _ �1,� ���� ��
NEW READING�
E�-� �1 ��-!�2 3�7 30 .
ERIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADAl1lMISl'RAT{OIY
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.5 PERM(T FEE
� Prior#o�onstructing ar repair of arry water of sewer line connecting the existing municipal system and arry house ar bui(dir�g for whid�t�e
applicafiion is made,the owner or contractor shall be required to obtain a permit for such�n�ection,and shatl pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,#he Water and Sewer Departmer�t shalt be notified. It shall be uniaxrful to cover
any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the Ctty as a
proper and witable connection.
402.06 REPAIRS AND MAINTEfVANCE TO COPlNECTION
After the initiat cortrtection has been made to the water service curf�stop box or the sewer(ead at the property 6ne or a water senrice(ead has
been extended to ihe property line for connecCion,the applicant,oarner,ar occuparrt or user of such premises shall 6e i'�able for all repairs
required to any water line and sewer iines necessary for connec#ion of the premises from the main to the premises, if the pro�rty owner
requests mairrtenance service or repairs be per�ormed by the Crty,the property owrter shall be charged for the costs of the maim:enante and/o�
repairs,including necessary street repairs at a rate set annua(ty by an administrative policy. It shall be the responsibility of the appliprrt,
owner,occupant or user to perform standard mair�tenance of the sewer service line from the premises to the main indudtng debris clearing or
root cutting and+to mairrtain the water ser+rice curb stop box for operabil'rty a�d at such height as will ensure that it remains above the finished
grade af the land or property. (Ref 638,1156,1191)