Meter Swap ►
�.
, ' Request Number: 13125
Public Works Division
Service Request
Problem Address: 5401 Matterhom Dr RequestedBy: Younlan
Department: WA'IER Address: No address pcovided
Problem/Isaue: INSTALL AMR METER Phone Number: S'74-1759
ScLed�iled llnte: Sc6ednled'Rme: 08:30:00
n� ���
ACIION NEEDED: '
; CYeated by: Wendy Hiatt Date Created: 2017-01-27 '
AC7TONTAI�N:
� vt.s Ll� � �'� �- I��
_��:,�.._._....�-�_ ..� _
,
__.__. _�,� __ . ._�___
. ....._. ._........._._....._. __--___ .__.________.__. _ _.__._ .__._..� ��
Status: In Progress Snbmitter Has Been C
Cout�ted
Date Compteted: a�a_. '� Completed by: \ a��
J
— —
ftvate�-�e�arta�a�aent
6437.ila�iv�ssi�Aver,a�e PIE � �l ,� 3 �
Fridley, N!6!f 55432 I
763-572-3565 � ��--� �� ���� —�.� �
' �0°1°� hereby authorize the�'rty of Fridley andJor its emptoyees to clo what ds necessary to
replace the r++afier�neter. !vnderstand that�he property owner ss diable for#he+nrater line from the maia to the premise and all irnerior
piumbing. (Per�ty code 4Q2A6� i adso hold the C'aty of FPidiey and/'rts employees harmless#or eny damages that may occur while doing tF�is
operation. This to 3nclude,but not 9im'rted io valves,piping,walls,floors or khe curb stop box and service 1ine. (n a�nderstand 1 am also requir
to obtain a permit prior#o arry�erorlc,�f necessary.
FBNAL MEi'ER READIWG(old meter) � ��� v �`-�
Name: 1.� !�,'l/1���� Address � f�� � ��'t!�'�'►/�Y 1A6'�� �d�`.
Phone Number �7 ( � � t 7� p� 2. � Z, " Z �
Signature Witness Signature
o�D M��R�_ 7 K�- 3C��
OLD READIAtG ���
NEW METER#� V � � � �
NEW READIiNG v
�RT� `71 a a a 9 f�o �
FRIDLEY Ci7'Y CODE
CHAPTER 402.WATER,S7'ORM WATER AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,635,662,922,988,1144,I156,1191}
402.5 PERMIT FEE
Prior to constructing or repair of any wafier of sewer tine connecting the exisfing muniapal sys#em and arry house or buitd�for which tfie
application is made,the owner or corrtractor shall be required to obtain a permifi for such connection,and shall pay a permit fee as providecl in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shall be notified. it shail be unlawfui to cove
any connecting line urrtil an ir►spection has 6een made and such con�ection and the work inciderrt thereto has been approved by tEte City as a
proper and suitabie connection.
402.06 REPAiRS AND MAfNTENA1110E TO CON111ECTION
After the initiat connection has been made to the water senrice curb stop box or the sewer lead at ihe property iine or a water senrice lead has
been extended#o the property line for connection,fihe applicarrt,orvner,or accuparrt or user aF such premises shatt be lfabie for a11 repafrs
required to any water line and sewer lines necessary for connection of the premises from the main to the premises. tf the proper�y owner
reques#s mairrtenance service oc repairs be performed by the C'�ty,the property owner shatl be charged for the costs of the mairttenarxe and/or
repairs,including necessary street repairs at a rate set annuaily by an administrative policy. It shall be fii�e responsbility of the applicarrt,
owner,occupant or user to perform sfiandard mairrtenance of the sewer service line from the premises to the main anciudir�g debris dear�ng or
roofi cutting and to mair�tain the water service cur6 stop bvx for operability and at such height as ariit ensure that it remains abave the finished
grade af the land or property. (Ref 638,1156,1191)