Loading...
Meter Swap i' . A Request Number: 13553 Pubtic works Division Service Request Problem Addreas: 6044 Mckinley St Requested By: Sharon Joh�nes DepArtment: WATER Addresa: No addtess provided Problem/Isaue: INSTALL AMR METER Phone Number: 763-571-3130 .` �; �;�il; Schednled Date: 2017-02-2'7 � Scbednled 1lme: 11:30:00 �`; I ` - ACITON NEEDED: Crested by: Beth Kondrick Date Created: 2017-02-17 ACIION TAKEN• �5��✓� ��C�'li� Stxtus: In Progress Submitter H�Been r Cont�ted Dstte Completed: �,.��"]�, l� Completed by:��p l r" � —----- --�-- _. _.._ �6431 l9neveg-sity Averaue N� Fridley,MN 55432 753-572-3565 �l `,) _ � �� � / � , � � —� �o 9/we � * her�by authorize#he Cityr of Fridley and/or its empioyees to do what is necessary to replace#he water meter. I understand that the proper�y owner is liabie for the water line from the main to the premise and arl iMerior plumbing. (Per City code 402.06j i alsv hold the City�af Fridley and/'rts employees harmless#or any tlamages that may accur while doing this oper�rtion. This to anclude,but not Bimited io valves,piping,wails,floors or the curb stop box and service line. In anderstand i am also requir to obtain a permit�rior fio arry�ror�c,if necessary. � (��') ✓� j�}�►��� FINAL METER READlNG(old meter) v � ��� � V rlame:✓���1 ����11'��2 5 Address Vl�/ - (� �k•4pVl���/ �• Phone Num6er �11� � d L � �J�� Date � � o��'� � 6 � ��^�� Witness Signature OlD METER# a 3 OLD READtNG ���c�=t7�� NEW METER#_ �� II� v/ 1 �� NEW READING O ERT# � � � I \U � f � FRIDLE1f ClTY CODE CHAPTER 402.WATER,STORM WATER AND SANITAltY SEWER ADMINISTRATION , �Ref Ord No 113,464,565,566,529,638,662,922,988,1144,2156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and arry hause or buitding for which the application is made,the owner or cornractor shall be required to obtain a permit for such wnnection,and shall pay a pem�tt fee as prrovvi'ded in• Chapter 11 of this Code. After such connection has i�een made,the Water and Sewer Department shaU be nofifiecf. tt shall be untawfui to cove any connecting line urrtil an inspection has been made and such connectiort and the wock inciderrt thereto has been approved by the Crty as a proper and suitable connection. �02.06 REPAlRS AND MAINTENANCE TO CONNECTta1�l After the initiai connectioa has been made to the water service wri�stop t�ox or the sewer lead at the prvperty iine or a waier service lead fias been exfiended#o the property line for connettion,the appiicarrt,owner,or accupant or user oF such premises sF�ail be liabie for all repairs required to any water line and sewer lines�ecessary#or connection of tfie premises from the main to the premises. if the property o�otner requests maintenance service or repairs be perFormed by fihe City,#he properly owner shali be charged for#he costs af the mairrtenance and/or repairs,including necessary street repairs at a rate set annually by an administrative poPry. it shali be the responsibiiity o�f the applicarit, owner,occupant or user to perform standard mairrtenance of the sewer service line from the premises to the main induding debris dearing or root cutting and to mairrtain the water service wrb stop box for operability and at such height as wili ensure that it remains above the flnisfied grade of#he land or property. {Ref 638,1156,1191j