Meter Swap .
� Request Number: 13382
Public works Division
Service Request
Problem Address: 1438 N Danube Rd Requeated By: Joe
Department: WA1ER Address: No ad�ess provided
Problem/Issue: 1NSTALL AMR METER Phone Nu�ber: 612-414-0868
Scheduled Date: 2017-02-13 Se6�del ei'Itme: 08:00:00
1 � `- �
ACTiON NEEDED:
Created by: Bcth Konc�ick Date Cre�ed: 2017-02-09
AC'tION TAKEN:
�5�-a-C��ed� �t,IL.
ShMs: In Progress 3�i�mitter Has Been �.,
Co��cted
Date Completed: � ' 1,3�-C� Completed by: p' � �
� ��-G
�i1/atea-�e�Sar�taYeent
6432 lDeaiv�rsii�a��re��ae NE �V � 1 lf�{' !/
Fs�ie!ley,N!P! 55432
ti 7�3-5?2-3566 ,� � lt " \ ��G � ��� (-. �
9��� hereby authorize the�'rty af Fridley andjor its empioyees to slo what is necessary ta
replace#he water metea'. f understand that the g�ropeefiy owner is tiabte for the+aater line#rom the main to the premise and all irrterioc
plurrrbing. (Per C"rty soele 402.06j i adsa hotd the City of Fridiey and/its emgloyees t�armless#or any damages that may occur while doing tf�is
operation. This to inctude,but not Bimited io valves,piping,walls,floors or the svrb stop�ox and service line. In understand!am also requi�
to obtain a perm'rt prior to arry�ror9c,if necessary,
F1t�((AL METER READt1YG(old meter) " ��� � �
Name: V" Address V�� (�/ • ���7�� ��-
Pho�ne A{umber ��2+`'�` k—� (J�� v p� �-"' � +' b�
Sigrtature W�tness Signature �_
o�D naea-�R�_��� �o� c�(l/
OLD READIIVG �����U
NEW METER# I�V 6 v f ���
N�W READIHIG C�
fRT# � t,��a�- 1 �
FRIDIEY ClTY CODE
CHAPTER 402.WATER,STORM WATER A4YD SANITARY SEWER
ADMINISTRATIO'N
(Ref Ord l�Io 113,464,565,566,6Z9,638,562,922,988,1144,1L56,1191]
402.5 AERMIT FEE
Prior to constructing or tepair of any water of sewer line connecting the existing municipa{system and arry house or buitding for which ihe
appiicafiion is made,the owner or car�traactor shai[be required to obtain a permit for such connecfion,and shaU pay a permit fee as provided in
Chapter 11 of this Code. Aftec such connection has been made,the Water and Sewer Department shail be noti#ied. ht shall be unfaerfut in covE
arry connecting line us�til an irispection has been made and such connection and the worh inademt thereto h�l�een approved by the�ity as a
proper and suita6te cannection.
402.05 REPAlRS AND MAINTEAIANCE TO COMNECTION
After the initia(connection has been made to the water service curb stop 6oK or the sewer lead aC the properfij line or a water senrice�ead has
been extended to the property tine for connection,the applicarrt,owner,or accupant or user o#wch premises shat{be IiaWe for all repairs
required to arry water Iine and sewer lines necessary for connection af the premises from the main to the premis�. tF the property owner
requests mairrtenance service or repairs be performed by the Ccty,the proper+ty awner sfialf be+charged for the s�of the mairrterrance andJrn
repairs,including necessary street repairs at a rate set annualfy by an administrative poliry. It shai!be the respoosbii'rty of the applicarn,
owner,ocsuPant or usec to perfvrm standard mairrtenance of the sewer service line from ihe premises to the mai�induding debris dearin��
root cutting and to cnairrtain tfie water service curb stop box for operability and at such height as wiii ensure Chat tt remains above the tinished
grade of the land o�property. �Ref 638,1156,1191)