Loading...
Meter Swap � ' �i � <:, �;��f Fridley Request Number: 17366 P�nLtc Ww�ka Divislon Serv�ce Request Pra�em A�ddresa: 1596 68th A�e Requested By: Teresa or�utha Departme�t: WATER Addreas: No ad�eas pro`ndcd Problem/Issae: INSTALL AMR METER Phone Number: 571-0010 Schedmed I�te: 2017-12-OS Schedaled 1lme: 12:00:00 ACTION NEEDED:Go to building 1652 69th A�to get key Createdby: Wendy Hiatt Date Created: 2017-12-04 ACTION TAI�N: " ����1��--� � 1� � (l� -�. � . �� � . . � . , .::.:ia:��v. Status: In Progress Snbmitter Hns Been r Contacted Date Completed: t�� �_ t� Completed by: \ -��kf; � ' �b2- -- �a l�3�Q � � I City of Fridley �� � �� � � Water Department 6431 University Avenue NE Fridley,MN 55432 763-572-3566 I/we hereby authorite the City of Fridley and/or its employees to do what is necessary to repiace the water meter. 1 understand that the property owner is liable for the water line from tfie main to the premise and all iirterior plumbing. (Per City code 402.06) 1 also hold the City of Fridley and/its employees harmless for any damages that may occur while doing this operation. This to include,but not limtted to valves,piping,walls,floors or the curb stop box and service line. In understand I am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter) �� ' � �� � Name: ��5�` Address ���"'� w v � � '^' `'' Phone Number �� � �� �� Date �2-� � �� x Signature Witness Signature OLD METER# ���V/ l � ` � SIZE & STYLE(Circlel OLD READING �� I 1 � ` b 5/8" HEX NEW METER# ` 6 1 1 � � � � 1" (HE � \� NEW READING v 1'r4" ELIPTICAL or HEX ERT# �� � ` � � �� 2" ELIPTICAL or HEX FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMlNISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or building for which the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shalf pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shali be notified. It shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the C�ty as a proper and witable connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initiai connection has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has been extended to the property line for�nnection,the applicant,owner,or occupant or user of such premises sfiail be Ifabie for all repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the properly owner requem maintenance service or repairs be performed by the City,the p�operty owner shall be charged for the costs of the mair�tenance and/or repairs,including necessary street repairs at a rate set annually by an administrative poliry. It shall be the responsibility of the applicant, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)