Meter Swap .
' Request Number: 15229
Public Works Division
Service Req�est
Problem Address: 70 70th Way Requested By: Mazilyn Hodgeman .
Department: WA'IER Address: No ac�ress p�ovi�d
ProblemlIssue: IN5TALL AMR METER Phone Number: 763-571-3532
'��ednie 2017-OS-10 � Scheduledl3me: 02:00:00
� � ��
AG'IiON NEEDED:
:�.
Created by: We�xiy Hiatt Date Created: 2017-OS-09
ACTION TA1�N: r
��,� ��C. } ��l� ��---�_
..___........._..�.._.�...�.w_....�..._._........._.__._.._........._.__....�..._ . .�.._._..��._.�._.�r,�__ .. ....................__.__..�.�.........
Statas: In Progress Submitter Has Beea r
Contacted
Date Completed: �' �r�� � Compl eted by: ���
V �
- . ��
�''�
,
�
�
�d'
Hiatt,�Wendy
,
Subject: Marilyn Hodgeman 763-571-3532 Install AMR got letter
Location: 70- 70th Way NE
Start: Wed 5/10/2017 2:00 PM
End: Wed 5/10/2017 2:3d PM
Show Time As: Tentative
Recurrence: (none)
Meeting Status: Not yet responded
Organizer: Hara, Sandra
Required Attendees: Hiatt,Wendy
�
j
.
�� 3.- ��l-��� ��t
Ciiy of Fridley � � t ' �� - r
Water Department �'r �••�'
6431 University Avenue NE
Fridley,MN 55432
763-572-3566
��We hereby authorize the City of Fridley and(or its employees to do what is oecessary to
replace tfie water meter. I understand that the property awner is liabie for the water line from the main to the premise and aN iriterior
plumbing. (Per City code 402.06) t also hold the City of Fridtey and/its employees harmtess for any damages that may oaur while daing this
operation. This to include,but not limited to valves,pipin�,walis,flooe�s or the curb stop box and service line. In understand 1 am also required
to obtain a permit prior to arry work,if necessary.
FINAL METER READING(old meter) �� � i { ✓ �
Name: �.u.r i �y h �(?L�,°I�Gin �aress_ f'() �v �" ��
Phone Nusnber l t��` 5 l 1� 353a.. Date �� W ~ � L
��
Sigr►ature Witness 5ignature
OLD METER#_ y�� "i���0��
OLD READING ��� ��
NEW METER# t 1 U`��� ��
NEW READING �
ERT# � ) I �� � l �
FRtDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,�64,565,566,629,638,662,922,988,1144,1156.1191)
�02.5 PERMIT FEE
Prior to constructing or repair of arry water of sewer line connecting the existing municipat system and any house or buiiding for wfiicfi the
application is made,the owner or co�tractor shall be required to obtain a permit for suth connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shali be notified. It sha{I be unlawFul to cflver
any conneding line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06 REPAIRS AND MAIfYTEWAfVCE TO CQNNEC7'ION
After the initial conneccio�has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has
been entended to the property tine for connection,tfie applica�t,owner,or occuparrt or user of such premises shali be liabk for alt repairs
required to a�y water line and sewer lines necessary for connection of the premises from the main to the premises. tF the property owner
requests mai�enance service or repairs be performed by the City,the properly owner shall be charged for the costs of the mairrttnance andJor
repairs,including netessary street repairs at a rate set annuaily by an administrative poliry. it shall be the responsibility of the applicant,
owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris dearirtg or
root cutting and to maintain the water service curb stop box for operability a�d at such height as will ensure that it remains above tfie finished
grade of the land or property. {Ref 638,1156,1191)