Meter Swap ,
Request Number: 15338
Public works Division
Service Request
Problem rlddress: 136 71 1/2 Way Requested By: Kamal
Departmeet: WATER Addresa: No ad�ess provided
Problem/Issue: LF.AKING ME1ER Phone Number:
Schedtved Drte: Schednled 1lme:
AC7ION NEEDED:Meter installed on 5/12/17 is leaking.
Created by: Wendy Niatt Date Created: 2017-OS-1 S
ACTION TAI�N:
__..._______...._. ......_._..._._.._..__ 1L N�� ��_._____.._.___.
� � . . � .��..�� ��
......................_. _ ...._._._._....._._........_._____�__
.____..............._._._....._...��� '�'►Jfl A�`!��..�.....�__..___.._......__..__..._ _.
Status: In Pro�rress 5nbmitter Has Been r,
Co�rts�cted
Date Completed: Completed by:
5--� 5- � 7
. City of Fridley a � �fJ��� r�1
Water Department �t�� �
6431 Umversity Avenue NE
Fridtey,MN 55432
763-572-3566 S�� u,5�^7
I/we hereby authorize the City of Fridiey andjor its employees to do what is necessary to
replace the water meter. 1 ur►derstand that the property owner is liabie for the water line from the main to the premise and all interior
p{umbing. (Per City code 402.06) I also hold the City of Fridley aod/its employees harmless for any damages that may occur while doing this
operation. This to include,but not limited to valves,piping,wails,floors or the curb stop box and service line. In understand 1 am also reguired
to obtain a permit prior to any work,if necessary.
FINAL METER READiNG(old meter) �� v� ��
,. ` Name• ��/� �G�..� Address ��b'°� / ���'L w�
! Phone Number��,� ,��� (',�`�� Date � '�
_`� �D� �� Q /J/f
t'+�;,��, l.�'/r"� 6"/���� Witness Signature
• OLD METER# �"')��� � ���
— ..
OLD READING �� (�� }� �� C �
r� �
NEW METER#�'�, ��j �� � �0 �� �`C� Citi� `'Ur.
-"–�— �-d �
�. q _ �' l�.�e d. �,,1-e-f cc� I�a.-�.. bv�-:
NEW READING � � �
�N�+'�
1, c,u�� �-3r'
ERT# � �� ` ��� �a�-4�'�r a-t ��.aa• �E U�►-e�.
�.t1�ed�. d�+-.
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND 5ANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,454,565,566,629,638,662,922,988,1144,1156,1191�
402.5 PERMiT FEE
Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or buildir�g for which the
application is made,the owner or cont+�actor shall be required to obtain a permft for such connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. {t shaN be uniawful to cover
any connecting line until an inspedion has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
4�02.06 REPAIRS AND MAIN7ENANCE TO CONNECTION
� After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service{ead has
been extended to the property line for connedion,the app{icant,owner,or occupant or user of such premises shall be liable for all repairs
required to any water line and sewer tines necessary for connection of the premises from the main to the premisEs. If the aroperty owner
requests maintenance service or repairs b¢performed by the City,the property owner shall be charged for the costs of the maintenance and/or
repairs,includi»g necessary street repairs at a rate set annually by an administrative poliry. It shafl be the responsibility of the app{icant,
owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main inciuding debris clearing or
root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above tfie finished
grade of the land or property. (Ref 638,1156,1191)