Meter Swap /
. � Request Number: 12937
Public works Division
Service Request ��\-,� �� ^ � I�
�`,`'
Problem Address: 1323'73rd A� Requested By: Jean Morrisette
Departmeut: WA'IER Address: 1323 73rd A�e
Fridlty,MN 55432
Problem/Isaue: INSTAL.L AMR METER Phone Number: 651-335-4666
Scheduled Date: 2017-01-24 Scheddled Tlme: 11:30:Q0
°�.-1' .�s a� 2�[�' '.3 c�
AC'IION NEIDED:Meter is at 1323 73rd-it is a�plex.Mailing address is 1313 73rd
Crented by: Beth Kondrick Date Cre�ed: 20171-01-1 S
ACIION AKEN:
��
...�_ � �
1 ,,
Status: In Progess Submitter Has Been �..,
Contacted
llnte Completcd: Compteted by:
� ' 2� - � � 1�
��
�tVatee-�e�arta�rtent �(.1 � � (� � �
6431 ilniversitg/Avenue N� 4'
Fridley,MN 55432 ��3,��--va,y S-v�-c��
� ' T63-572-3566
n
�/TM�e her�by authorize fihe Ciiy af Fridley andjor its empioyees to sfo what is necessary to
repiace the water meter. I understand that�he property owner'ss liabie for the water line from the main to the premise and all iaterior
plumbing. (Per City cocle 4Q2.06j i also hold the City of Fridley and/ifis empioyees harmfess#or any damages that may occur white doing this
operation. This to include,but not limrted to valves,pipin�walis,floors or tfie curb stop box and service line. In understand!am also require�
to obtain a permit prior fio ar�y wor�c,if necessary.
�,�"�13 i'�, -�3 C=v-��,.�
FINAL METER READING(old m er) � �� � C� `�`J �-,(,(/�� I
lVame: -�C�� �U��U�J `Addr r
Phone Number�� '^ �r��'���v�-Date_�'— L�� — ' �
Signat�rre Wttness Signature
oiu MErER#_���� �� Z � � _
OLD READti11G �,�j� � Z�
1VEW METER# `—C `Z � � ��'7� ��
NEW READtNG �
ERT# �/..� l� �V ��S .
FRIDLEY CITif CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRAT1011t
(Ref Ord No 113,464,565,566,629,638,662,922,985,1144,1I56,1191)
402.5 PERMIT PEE
Prior to constructing or repair of any water of sewer line connecting the existing muniapai system and arry house or butlding for which the
applicatifln is made,the owner or contractor shall be required to olrtain a permit for such connection,and shali pay a permit fee as provided in•
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shall be notified. it shail be untawfui to cover
any connecting(ine until an inspection has been anade and such connection and the work inciderrt thereto has been approved 6y the City as a
praper and suitable wnnection.
4Q2.06 REPAIRS APID MAflYTEfYAMCE TO COPfNECT10N
After the initial connection has been made to#he water service curb stop box or the sewer lead at the property liae ar a rrater servicQ lead has
been Qxtended to fihe property line for connection,the applipnt,owner,or accupaM or user of wch premises shall!�liabie for ell repairs
required to any water li�e and sewer lines necessary for connection of the premises from the main to the premises. ff the property owner
requests mairrtenance service or repairs be perFormed by the�ty,the properly owner shail be charged for the costs af the mairrtenance and/or
repairs,including necessary street repairs at a rate set annuaily 6y an administrakive po�iry. tt shatl 4�e the sesponsibil�ty of the applicarrt,
owner,occuparrt or user to perform standard maintenance of#he sewer service line from the premises to the main includi�debris deari�g or
root tutting and to maiMain the water service curb stop box fo�operability and at such height as wifl ensure that it remairis above the finished
grade of#he land or property. (Ref 638,1156,1191)