Loading...
Meter Swap ,. �F Request Number: 12929 Public works Division Service Request Problem Address: 1510 73 1/2 Ave Requested By: Kemieth Hoeschen Departmeirt: WATER Address: 1510 73 1/2 Ave Fridley,MN 55432 Probiemllssue: INSTALL AMR ME1ER Phone Number: 763-784-8674 Schednled Date: 2017-01-25 Schednled Ti me: 08:00:00 �,2.� r Z��'`' �'' ACIION NEEDED:Install AMR Crexted by: Beth Kondrick Date Creited: 2017-01-17 ACIION T h S � � 1`-� Cz-- , Status: 1n Progress Snbmitter Haa Been �. Coutacted Date Completedc Completed by: � �/ � ' It��1 � I L � ✓ � �� �; �o�/�r rriaoey water Departrnent .�(,�� - s�a2. � �D - D l 6431 University Avenue NE Fridley,MN 55432 � � � ( i. � � � 763-572-3566 L � �/We hereby authorize the C"tty of Fridley and/or its employees to slo what is necessary to rep{ace the water meter. l understand that the property owner is liable for the water line from the main to the premise and all irtterior plumbing. (Per City code 4�Q2.06) 1 also hold the C"oty ot Fridiey and/its employees harmless for any damages that may otcur while doing this operation. This to incfude,but not lim�#ed to valves,piping,walis,floors or the curb stop box and sen+ice line. In understand I am aiso required to obtain a permit prior to any wortc,if necessary. FIMAL METER READING oid meter) � � � � I � Name: � � �b 2J�. Address ' , � i�2 �. S i 3 1�, PhoneNum�r����(O 1- (,��E'"� Date I'-2 vT 1�� Signature � �--~.`'-•-. Witness Signature ---- OLD METER# � . ,� � t� ��� OLD READtNG �b� � � v NEW METfR# `1�Y� �� �� NEW READING l J E�# ��� t� 7 I � FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMIN ISTRATIOAI (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERNIIT FEE Prior to constructing vr repair of any water of sewer line connecting the existing municipai system and arry house or buiiding for which the application is made,the owner or corrtractor shall be required to obtain a perm"rt for such coonection,and shali pay a permic fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shall be nofified. It shall be untawful to cover any conneding line until an inspection has been made and such wnnection and the work inciderrt thereto has been approeed by the City as a proper and suitable connection. 402.06 REPAIRS AfYD MAINTENANCE TO CONMECTIOM After the initiat connection has been made to the water senrice curb stop box or the sewer lead at the property line or a�rater service lead has been extended to the property{ine for cannection,the appficarrt,owner,or accupant or user of such premises shali be liable for a!I repairs required to any water line and sewer li�es necessary far connection of the premises from the main to the premises. if the property owner requests mair+tenance service or repairs be performed by the City,the property owner shaU be charged for the costs of the mairrtenance and/or repairs,including necessary street repain at a rate set annuaily by an administrative poliry, it shali be the responsibility of the applicarit, owner,occuparrt or user to perform standard mairrtenance of the sewer service line from the premises to the main induding debris dearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the iand or p�operty. (Ref 638,1156,1191)