Meter Swap - Request Number: 12982
Public works Division
Service Request
Problem Address: 1453 75th Ave Requested By: Bill Judge
1453 75th Ave
Departmeat: WATER Address: Fridley,MN 55432
Problero/Iasue: INSTALL AMR METER Phone Number: 61 Z-799-5425
Scheduled IMte: 2017-01-30 Sc6eduled 1lme: 10:00:00
1 �
ACTION AIEEDED:Install AMR
Crexted by: Beth Ifondrick DAte Created: 2017-01-20
ACITON TAI�N:
�y�,S�..�ti�e � {N �1� 5"t"�t...� � l
�
��:�
�, _._. ......___ _..__ _
Status: In Progress 5ubmitter Has Beea r,
Contxcted
Dxte Goropleted: �-- �j� — '� Completed by: � ��
✓ al,
:�,
iNater�e�sartrnent
6431 iln�versitvf Avernue RI� �J� , �j�j�/!�-��--
Fridley,MN 55432
763-572-3566 � �°; ,� '� �
1%we hereby authorize the�ity af Fridley and/or its emptoyees ta do what ds necessary to
' rep9ace#he water rneter. 1 understand that the property owner 6s liabie for the water line from the main to the premise and ail trrterior
plumbing. {Per C'rty code 402.06j i also hold the City�of Fcidley and/its emptoyees harmless#or any damages that may occur white doing this
operation. This to 6nclude,but not limi#ed to valves,piping,waiis,floors or the surb stop bax and service line. In understand 1 am also require�
to obtain a permifi prior to any wor�c,if a►ecessary.
FINAL METER READING(oid meter)— _� 1.1G ((l� `) 5 �
Name:__S.If�� .J_l�','� Address ��'�� /��' ��I °�L
PhaneNum6er U��Z� �!J � 5'�2 5 �� ti-- �v - 4"7
Signature Witness Signature 'r
OLD METER#_� 1. C CJ� �O''"`�
OLD READiNG �� � � ��U
PJEW METER# � � / � ��
—s=f---
NEW READING � �
ERT# � r� �✓ U�C v �
FRIDLEY CITY CODE
CHAP7ER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,9$8,1144,1156,1191)
402.5 PERMIi'FEE
Prior to constructing or repair of any water of sewer line connecting the exist�ng municipal system and arn�house or buiWing for which t�e
appficafiion is made,the owner or cor�tractor shatl be required to obtain a permit for such connection,and shail pay a permit fee as provided irr
Chapter 11 of this Code. After such connection has been made,the Water and 5ewer Departmerrt shali be notified. tt shail be unla+rful to cover
any connecting line until an inspection has been made and such connection and#he worac inciderrt thereto has been app�oved by the City as a
proper and suitable connection.
402.06 REPAlRS A111D MAINTENANCE TO CONNECi70N
After the initial connection has been made to the water service curb stop box or the sewer lead at the property iine or a water senriae lead has
been extended to the property line for connection,the appiiprrt,owner,or occupant or user of such premises shali be IiaWe for all repa�rs
required to any water line and sewer ttnes necessary for connection of the premises from the main to the premises. if the property owner
requests mairrtenance service or repairs be perFurmed by the City,#he properly awner sha8 be charged for#he costs of the maicrtenance and/or
repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibitity of the appiicarrt,
owner,occuparn or user to perForm standard mair►tenance of the sewer service line from the premises to the main induding debris clearing or
root cutting and to maintain the water service curb stop box for operabitity and at such height as wiii ensure that it remains above the finished
grade af the land or property. (Ref 638,1156,1191)