Loading...
Meter Swap . � Request Number: 12417 Public Works Division Service Request Problem Address: 876 76th A�e Requested By: George Scott Department: WA1ER Addreaa: No ad�ess provided Problem/�ssne: INSTALL AMR METER Phone Nnmi�er: Scheduled�., 2016-12-27 ,� Scbednled'11me; 10:00:00 P S` C �-�? �C� �i.v✓� ACIION NEEDED:AMR Crested by: Wendy Hiatt Date Cre�ed: 2016-12-12 AC'IION TAI�N: �� _ � N��- q� __�_ Statua: In Progess Snbmitter$ns geeH r Contacted Date Compteted: Com�eted by: t�/�� �� Hiatt, Wencly From: Pellegrin, Cheryl Sent: Friday, December 09, 2016 1:50 PM To: Hiatt,Wendy Subject: AMRs that need a Work Order Hi Wendy: I scheduled an AMR on the calendar for George Scott at 876—76th Ave NE on Dec. 27th at 10 am . Can you please do a work order for it? Thanks. City of Fridley �J (�� - S Q,�3�O O -- O� Water Department 6431 University.Avenue NE / ' Fridley,MN 55�32 �� (�� � ' T63-572-3566 t/we hereby authorize the City of Fridley and/or its employees to do what is oecessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and all iMerior plumbing. (Per City code 402.06) i also hold the C'ity of Fridley andjits employees harmless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,walls,floors or the curb stop box and service line. In understand t am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(oid meter) _ V���� Name• ���'�-"� �f.c��'t' Address ������� Phone Number����Cli.- ��� Date �sJ`' ��`� 5ignature �tness Signature OLD METER# r����g� / /� �,,�� OLD READING O �p�►C���V �7'u° C �� (7 � � �� NEW METER# l ����qd � � NEW READING !�-� ERT#�� U� ��� FRIDLEY CITIf CODE CHAP'TER 402.WATER,STORM WATER AND 5ANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMR FEE Prior to construding or repair of any water of sewe�line connecting the existing municipal system and a�ry house or building tor which the application is made,the owner or corrtrector shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in tfiapter 11 of this Code. After wch connection has been made,the Water and Sewer Departmerrt shall be notified. It shall be uniawful to cover any connecting tine until an inspection has been made and such connection and the work incident there�to has been approved by the Cty as a proper and suitable connection. 402.fl6 REPAfRS AND MAIWTEWANCE TO CONNECTION After the initial connection has been made to the water service wrb stop box or the sewer lead at the property line or a water service lead has been extended to the property line for connection,the appiicant,owner,or occupant or user af wch premises shall be liabie for all repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests mairrtenance service or repairs be pecformed by the City,the property owner shafi be cfiarged for tfie costs of the mairitenance and/or repairs,including necessary street repairs at a rate set annuaily by an administrative poliry. It shall be the responsibility of the applicaM, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris dearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that tt remains above the finished grade of the land or property. (Ref 638,1156.1191)