Meter Swap �
� Request Number: 16065
'� Public works Division
��,�►� �� _,
. � Service Request
------- '�--- -----__------
Problem Address: 7534 Alde� Requested By: Joe Kloiber
Department: WA'IER Address: No address provi�d
Problem/Issue: _ II�ST�ii.LAl1�ME'T�R PhoneNumber: 651-335-5039
Schednled Date: 2017-06-22 Scheduled 13me: 08:00:00
� �
AC'ITON NEED�:'1'ura off water so val�can be repaired lnstal2 AIVIlt.
Created by: Wendy Hiatt Date Created: 2017-06-20
ACTION TAI�N:
.�_..._................._....._............_...._..._......�..�.�..2..._�„�....._.��._��._..._. ��N� � �"�-�
__......_�_...............���c.� o�....._._._���� U��..��..........._��?..c..��m�
...........................____...._..__._1_.._�.........._!...._......_...___._.-Q-.��............________..___.___.........._................_._...._...._.__ __...�-�--�---
Status: In Progcess Sabmitter Has Been r
Contacted
Date Completed: Completed by:
6�-a�'��l
� l ` �'��-1 7�'���
� Ci#y of Fridley ���
• Water Departrnent / L���
6431 University Avenue NE ��
Fridley,MN 55432
763-572-3566
t/we hereby authorize the City of Pridley and/or its empfoyees to do what is necessary to
replace the water meter. 1 understand that the properC+E otivner is liable for the water line from the main to the premise and all irrterior
piumbing. (Per City code 402.06) i also hold the City of Fridley and/its employees harmless for any damages that may occur white doing this
operation. This to include,but not limited to valves,piping,walts,floors or the curb stop box and service line. in understand!am also required
to abtain a permit prior to any work,if necessary.
FINAL METER READIPIG(old meter) ��O� �O
Name: Address _ 1, i rl—ZJG� ��
Phone�tumber p� " �Q�''�
Signature Witness Signature
OLD M�1'�R# c����� � 4 �O
OLD REQDING ` �v��
�..
� NEW METER# �f/`�`� tQ� p�� . � � ,
,�: NEW READING G`-� `
ERT# _ � �� �� l �
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AIYD SANiTARY SEWER
ADMlNISTRAI'iON
(Ref Ord No 113,464,565,566,629,538,662,922,988,1144,1156,1191)
402.5 PERMiT FEE
�:.:
Prior to constructi�g or repair of arty water of sewer iine conneding the existing municipal system and any house ar buitdir�for whith the
application is made,the owner or contractor shall be required to obtain a permit far such wnn�ction,and s{rali pay a permit fee�provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be uniaarfut to cover
any connecting tine until an inspection has been made and such connection and the work incident thereto has been approved f�y the City as a
proper and suitable connection.
402.06 REPAIRS AND MAINTEfYANCE TO COAtNECTION
After the initiai connection has 6een made to tBe water service curb stop boz or tfie sewer lead at the property line or a water servtce lead has
been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shalt be tiable for att repairs
required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner
requests mai�tenance service or repairs be performed by the C'rty,the property owner shall be charged for the costs of the maiMenance and/or
repairs,including necessary street repairs at a rate set a�nualiy by an administrative policy. It shal!be the responsibility aF the appiicarn,
owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris dearing or
root cutting and to maintain the water senrice curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)