Loading...
Meter Swap � _ _ Re�c uest Number_12932 Public works Division Service Request Probiem Aaddress: 7625 Arthur St Requested By: Craig Nedegaard 7625 Artlnr St Departmeat: WATER Address: Fridley,MN 55432 Problemllsaue: INSTAI.L AMR METER �Iwne Nwnber: 612-296-7954 Schefluled Date: 2017-01-2 Schedeled 11me: 11:00:00 � � ACIION NEEDED: Created by: Beth Kondrick Date Cremted: 2017-01-18 ACIION TAI�N: �-v� � l�e d� N�f� S �� �- - ;�- Status: In Progcess ���er Has Been r Catrtncted � Date Completed: 1� a.,�— �,� Completed by: ���� .� _. .��:. . �A� ..:�} . � �� � lAfate�-I)epartrnertt 6431 Universityr Averaue P1E ,, �rititey,MN 55432 ��� �y���yv�5,,/ , 753-572-3566 � � � I� � �O"Ye � hereby authorize the�ity af Fritliey and/or its empioyees to alo what is necessary to replace#he water meter. I understand that#he propea-ty owner�s liable for the water line from the main to the premise and all irrterior plumbing. {Per City code 402.06) i also hold the City e�f Fridley and/'rts employees harmless for any slamages that may occur while doing this operation. This to include,but not limi#ed to valves,piping,walls,floors or the curb stop box and service line. In understand 1 am also require� to obtain a permifi pr9or ta any rror�c,if necessary. FIAIAL METER READING(old meter O � � �� O ) Name: � ul, 'v (� Pid�j Address l "��� ✓�+. p� �q/_ u/ Phone Number�IG�'2`� � 1 lD — 7 q S- / Date L� '1 � � �—Z d�� Signature Witness Signature O�D METER# �/p��l� �� OLD READtNG � � � ��D � NEW METER#_ 4 � 1 v / � � � NEW REr4Di1VG � ERT# � I ��� �� FRIDI.EY CITV CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord NO 113,4&4,565,566,629,638,662,922,988,1144,t156,I191) 402.5 PERMtT FEE Prior to constructing or repair of arry water of sewer line connecting the existing muniapal sys#em and arry house or buiidir�for whic6 the appiication is made,the owner or cornractor sha(1 be required to obtain a permit for such connection,and shall pay a permit fee as provided in• Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shall be notified. It shatl be uniaarful to cover any connecting line urrtil an inspection has been made and such connection and the work inciderrt thereto has been appro�ed 6y the C'rty as a proper and suitabte conn,ection. 402.06 REPAIRS AND lIAAINTENANCE TO CONNECTIOW '.� A#ter the initiat connection has been made to the water service curb stop 6ox or the sewer lead at the property Ifne or a water�rvice ba,t��has bee�extended to fihe property line for connection,the applicarrt,owner,or accupant or user of such premises sfiall be IiaWe for all repairs required#o any water line and sewer lines necessary for connection of the premises from the main to the premises. tf the pr,operty owner requests mairrtenance service or repairs be perForrned by the City,the property owner shali be charged for the costs of the mairitenance and/or repairs,including necessary street repairs at a rate set annuaily by an administrative policy. R shati be the responsbil'rty of the applicarrt, owner,occupant or user to perform standard mairrtenance of#he sewer service line from the premises to the main�ncluding debris dearing or root cutting and to mair�tain the water service curb stop box for operability and at such height as will ensure that it remains abore the finished grade of#he land or property. (Ref 638,1156,1191)