Meter Swap - Request Number: 12850
.
Public works Division
Service Request
ProWem Addreas: 7613 Arth�u St Requested By: Cl�i Va�g
Dep�rtme�t: WA1IIt Addreas: No ad�es�provided
Problem/Iaane: INSTALL AMR ME1ER Pho�Nnmber: 763-3'70-6282
Se6ednledDate: 2017-01- 4 � Sc6edoled'llme: 08:00:00
��� Z� � a �'�1
�" AC"IiON NEEDED:
�
Created by: Wendy Hiatt Drte Createi: 201�-01-13
ACIION TAKLN:
�l-�
St�ns: In Pro ss S�b�itter Ha�Ese' �,
� Coetacted
Date Compteted: 1 ^ ��''1 '""�� Compl�tedby: c��
V
Hiatt, Wendy
From: . Pellegrin, Cheryl
Sent: Thursday, January 12, 2017 4:23 PM
To: Hiatt, Wendy
Subject: AMR appointment
Hi Wendy:
I just made an AMR appointment for:
Tuesday,Jan.24`h from 8 am to 8:30 am
For Chai Vang
At 7613 Arthur St
Ph 763-370-6282
Please check the AMR calendar to make sure it looks ok and send out a work order. Many thanks,Cheryl
Cheryl�'elCegrin
Customer Service Representative
City of Fridley
(763) 571-3450
i
City of Fridley � �' � "] ��
Water Department ��.-
• � 6431 University Avenue NE �j� �-�����3��
• Fridley, MN 55432
763-572-3566
I/we hereby authorize the City of Pridley and/or its employees to do what is necessary to
replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and all interior
plumbing. (Per City code 402.06) I also hold the City of Fridley and/its employees harmless for any damages that may occur while doing this
operation. This to include,but not limited to valves,piping,walis,floors or the curb stop box and service line. in understand I am also required
to obtain a permit prior to any work,if necessary.
FINAL METER READING(old meter) � ���6��
Name• �i'��1+ �G��1 Address ���� � �'� `�"�� �� '
Phone Number��3y J`� "'wZ�� Date �� ��a ��
Signature Witness Signature
�""�METER# ��" �.����
OLD READING � �� / � ( O
NEW METER# � 1 � l V �l d�
NEW READING �
ERT# � ��� � I � 1
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.5 PERMIT FEE
Prior to co�structing or repair of any water of sewer line connecting the existing municipal system a�d arry house or building for which the
application is made,the owner or contractor shall be required to obtain a permit for such connedion,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Depa+tment shall be notif(ed. It shall be unlawful to cover
any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitabie connection.
402.06 REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water servia lead has
been extended to the property tine for connedion,the applicant,owner,or occupant or user of such premises shal{be liab{e for a11 repairs
required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner
requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the mairrtenance and/or
repairs,including necessary street repairs at a rate set annuaily by an administrative poliry. It shall be the responsibility of the applicant,
owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main induding debris clearing or
root cutting and to maintain the water service curb stop box for operebility and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)