Meter Swap ,, ` Request Number: 12967
Public Works Division
S�rvice Request
Problem Address: 7508 Arthur St Requested By: Peggy Stra�sser
Department: WA'IER ,�e�: �508 Arthur St
Fridley,MN 55432
Problem/Issne: 1NSTALL AMR METER Phone Number: 763-786-3')02
Scheduled Date: 2011-01-24 Sehaduted'IIme: 11:30:(10
U�.� �-� �
ACTION NEEDED:
CYeated by: Beth Kondrick Date Crested: 2017-01-19
ACIION TA1�N:
'��%��I-Z�.���� �-�'�-�
Status: In Progress S�bmitter Has Bcen r
Coetaeted . = k.
�
Date Completed: ` --�—� ''�,� Completed by: T� ���
1
iAlaterDepartenent � � � ��� �
5431 l3niv�rsity Avenue�i�E �
Fridley,MN 55432 ?�� �y ��}��/3tJ'��
s 753-572-3566
, �O�e hereby authorize the Ciiy o#Fritlley and/or its empioyees to slo what is netessary to
replace#he water meter. !understand that�he property owner u liabie for the water line from the main to the premise and ali irnerior
plumbing. (Per City code 402.06; i atso hold the Gty of Fridley and/ifis employees harmless#or any siamages that may occur while doing this
operation. This to�nclude,but not fim�ted to valves,piping,walis,floors or the curb stop box and service line. In understand 1 am also require�
to obtain a permit prior fio any�ror4c,�f necessary_
FiNAL METER READIN6{o!d meter) � V��v V
Name: {'C ��t� �;i� Addre� t ,��� �`� " "�t�' ��.
Phone Number_ �� � ?� - 3�a�-p� ! � �,�-- l�
signature witi,ess signature '�
OLD METER# ���" G� ��L�
OLD READtNG_��� ���
NEW METER# `�� � I ����
NEW READt11fG �
ERT# � ��� �� ��
FR{D{.EY�i'TY GODE
CHAPTER 402.WATER,STORM WATER AND SANiTARY SEWER
ADMIAIISTRATION
(Ref Ord Pio 113,464,565,566,629,638,662,922,988.1144,II56,1191j
402.5 PERMIT FEE
Prior to constructing or repair of any�rater of sewer line connecting the existing municipal system and arry fiouse or buildirig for wt�ich the
application is made,the owner or contractor shall be required to otrtain a permit for such connection,and shal)pay a permit fee as provided ir�
Chapter 12 aF this Code. After such connection has been made,the Water and Sewer Departmer�t shall be notified. R shatl be unfawful to cover
any connecting(ine until an inspection has been made and such connection and the work inaderit thereto has been approv�ed by the�C�ly as a
proper and suitable connection.
�
.��
402A6 REPAIRS AND MAIARENANCE TO COMNECi'ION �
After the inttia(connectiort has been made to the water service curb stop box or the sewer leact at fihe property 4ine or a water service iead bas
been extended to the property line for connection,the appliprrt,owner,or accuparrt or user of such premises shatl be liabie for ail repairs
required to any water line and sewer lines necessary for connedion of the premises from the main to the premises. If the property rnivner
requests maintenance senrice or repairs be perFormed by fihe City,the property owner shail be charged for the costs of the mairrtenance and/or
repairs,including necessary street repairs at a rate set annually by an administrative pol'uy. It shalt be the responsibility of tfie appiicar�t,
owner,occupant or user to perForm standard mairrtenance of the sewer service tine from the premises to the main including debris dearing or
root cutting and to mairnain the water service curb stop box for operability and at such height as wiii ensure that�t remains above the fi�ished
grade of the land or property. (Ref 638,1156,1191)