Loading...
Meter Swap � . Request Number: 15328 Public Works Division Service Request Problem Addresa: ?109 Ashton A� Requesi�ed By: Nick Department: WATER Address: No address provided ProblemlYsaue: INSTALL AMR METER Phone Number: 612-532-3445 5cheduled IMte: ZO1 -OS-16 ,� Scheduied 1ime: 08:30:00 - � � At(>"1'ION NEEDED: Creat�i�rz Wer�y Hiatt Date Cre�ed: 2017-OS-12 AC'1Tt)1�t TAKL�N: , ��-V�-`� �.,G��.'.� �---- A�� Status: in Progress Sabmitter Has Been r Conts�ted �:;;:�'' Date Compieted: l, � ((„`�� Completed by: ��rL� d �c� � � t. :,. ,�:. � �� _ � y. - � , ��� � City of Fridley � (/" n � ��� Water Department � 6431 University Avenue NE Fridley,MN 55432 763-5723566 �JWe hereby authorize the City of Fridley andjor its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. (Per City code 402.06j 1 also hold the City of Fridley andJits employees harmless for any damages Chet may occu�while doing this operation. This to include,but not limited to vaives,piping,walls,floors or the curb stop box a�d service line. In understand 1 am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter) � �O� "� O Name: N�C•lC-- Address ��,� _ 1 ��� �� _ Phone Number �11� ��!� /�� Date ✓ � I �~ I � Signature Witness Signature OLD METER# � ��� 4�� OLD READING ��� � � NEW METER# L l�1 VJ� 1 l U NEW READING V ERT# � I t �� � � f FRIDLEY CITY CODE CHAPTER 402.WATER,S7'ORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or building for which the appiication is made,the owner or contractor shail be required to obtain a permit for such connection,and shail pay a permit fee as provided in Chapter 11 aF this Code. After such connection has been made,the Water and Sewer Departmeat shall be notified. it shall be unlavvful to cover any connecting tine until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connedion. A02.06 REPAtRS AND MAINTENANCE TO CONNECTION After the initial connedion has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has been extended to the property line for connection,the applicaat,owner,or occupant or user of such premises shalf be iiable for all repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the mairrtenance andjor repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsib[lity of the applitaM, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main induding debris dearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)